Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B10547, Informs That Bolt Matl Discussed in Util Mfg & Tested to Matl Spec Requirements of SA-540,Grade B23, Class 2,in Response to D Sellers Request for Addl Info. Expeditious Approval of ASME Code Case N-310-1 Requested + (ML20071N426)
- ML20071N431 + (ML20071N431)
- 2CAN058305, Provides Results of Technical Evaluation of Need to Upgrade Core Protection Calculator Local Power Density Penalty Factor Software & Proposed Implementation Schedule,Per 830414 Commitment + (ML20071N433)
- ML20071N434 + (ML20071N434)
- ML20071N436 + (ML20071N436)
- 05000389/LER-1983-007-03, /03L-0:on 830428,during Cold Shutdown,Porv 1474 Failed to Open at Required Pressure.Cause Not Determined.Sys Pressure Reduced & PORV Tested Satisfactorily + (ML20071N444)
- 05000416/LER-1982-071-03, /03L-0:on 820903,smoke Detectors in Fire Zones 2-4 Alarmed W/No Fire or Fumes Present.On 820929,detectors Alarmed Again.No Cause Stated.Detectors Cleaned + (ML20071N445)
- ML20071N446 + (ML20071N446)
- ML20071N458 + (ML20071N458)
- ML20071N471 + (ML20071N471)
- ML20071N474 + (ML20071N474)
- ML20071N475 + (ML20071N475)
- ML20071N485 + (ML20071N485)
- ML20071N486 + (ML20071N486)
- 05000325/LER-1982-101, Forwards LER 82-101/03L-0 + (ML20071N487)
- 05000260/LER-1983-023-03, /03L-0:on 830602,while Performing ST 4.1,A-6 Drywell Pressure Switch Found Operating Above Tech Spec Trip Setting,Initiating Drywell High Pressure Half Scram. Caused by Setpoint Drift + (ML20071N488)
- ML20071N490 + (ML20071N490)
- LIC-94-0137, Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Changes to 10CFR50 & 73 Concerning Frequency for Conducting Independent Reviews & Audits of Safeguards Contingency Plan & Security Program + (ML20071N494)
- 05000339/LER-1982-061, Forwards LER 82-061/03L-0 + (ML20071N496)
- AECM-83-0279, Updated RO 83-001/1:on 830202,smoke Detectors in LPCS Pump Room Covered to Perform Planned Activity.Hourly Fire Watch Established.Work Still in Progress.Restoration Date for Smoke Detectors Estimated for 830615 + (ML20071N498)
- ML20071N500 + (ML20071N500)
- 05000325/LER-1982-101-03, /03L-0:on 820920,valve Time Testing Not Covered in Operability Test of Loops a & B of Lpci/Rhr Sys PTS 08.2.2C & 26.Caused by Personnel Oversight During Procedural Development.Procedures Revised + (ML20071N503)
- NRC-94-0070, Comment Supporting Petition for Rulemaking PRM-50-59 Re Changes to Security Program & Safeguards Contingency Plan Independent Reviews & Audit Frequency.Util Believes Further Rule Changes Should Be Made + (ML20071N505)
- ML20071N512 + (ML20071N512)
- GO2-83-436, Interim Deficiency Repts 216 & 223 Re Gaseous Release from RHR Relief Valve Vents & Inadequate Standby Liquid Control Sys,Respectively.Final Deficiency Rept 232 Re Improper Installation of RHR Support Pin Receptacle Also Encl + (ML20071N514)
- 05000339/LER-1982-061-03, /03L-0:on 820905,low Head Safety Injection Pump 2-SI-P-1A Containment Sump Suction Valve MOV-2860A Failed to Open During Periodic Surveillance Test.Caused by Power Cord Wrapped Around Valve Operator Flexible Extension + (ML20071N515)
- 05000324/LER-1983-040-03, /03L-0:on 830426,while Performing Operability Test of Remote Shutdown RHR Sys Flow Monitoring Instrumentation PT-55.8PC,determined RHR Sys Flow Transmitter 2-E11-FT-3338 Had No Output Response to Applied Test Signal + (ML20071N519)
- 05000416/LER-1982-070, Forwards LER 82-070/03L-0 + (ML20071N522)
- 05000416/LER-1982-070-03, /03L-0:on 820907,13 & 16,smoke Detector P65 Zone 2-01 Sensed Smoke in Standby Svc Water Pumphouse.Caused by Smoke Blown from Nearby Burn Pit.When Wind Changed Directions,Alarm Cleared.Detector Cleaned + (ML20071N530)
- ML20071N531 + (ML20071N531)
- ML20071N535 + (ML20071N535)
- ML20071N542 + (ML20071N542)
- ML20071N548 + (ML20071N548)
- ML20071N560 + (ML20071N560)
- ML20071N561 + (ML20071N561)
- ML20071N563 + (ML20071N563)
- ML20071N565 + (ML20071N565)
- ML20071N566 + (ML20071N566)
- ML20071N567 + (ML20071N567)
- ML20071N568 + (ML20071N568)
- BSEP-82-2145, Ro:On 821001,analysis Confirmed That Pipe Support PS-6647 Could Fail During Seismic Event.Support Upgraded to Meet Requirements + (ML20071N569)
- ML20071N570 + (ML20071N570)
- 05000324/LER-1982-095, Forwards LER 82-095/03L-0 + (ML20071N571)
- ML20071N574 + (ML20071N574)
- AECM-82-433, Interim Deficiency Rept Re Unqualified Bettis Air Actuators on Henry Pratt Valves.Initially Reported on 811029.Scope Expanded to Include Other Actuators.Subj Not Reportable Per 10CFR50.55(e).Final Rept Expected by 830331 + (ML20071N576)
- ML20071N579 + (ML20071N579)
- ML20071N580 + (ML20071N580)
- ML20071N583 + (ML20071N583)
- ML20071N589 + (ML20071N589)
- ML20071N592 + (ML20071N592)
- ML20071N597 + (ML20071N597)