ML20071N474

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-63 Re Design Calculation Error in Refueling Water Tank Seismic Response.Initially Reported on 821026.Time Extension Requested Until 830624 to Submit Final Rept
ML20071N474
Person / Time
Site: Palo Verde  
Issue date: 05/24/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23869-BSK, DER-82-63, NUDOCS 8306070078
Download: ML20071N474 (2)


Text

,

DA 0

1120 Arizona Pulitic Service Company g pu, p 5B PHOENIX, ARIZONA 8503({lh ht P O. DOX 21666.

May 24, 1983 ANPP-23869-Bdh.g^r U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension - DER 82-63 A 50.55(e) Potentially Reportable Condition Relating to Design Calculation Error In Refueling Water Tank Seismic Response File: 83-019-026; D.4.33.2

Reference:

A) Telephone Conversation between A. D'Angelo and G. Duckworth on October 26, 1982 B) ANPP-22375, dated November 24, 1982 (Interim Report)

C) ANPP-22844, dated January 27, 1983 (Time Extension)

D) ANPP-23277, dated March 27, 1983 (Time Extension)

E) ANPP-23469, dated April 12, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requasted by References (C), (D) and (E).

It was estimated that a Final Report would be available by May 24, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by June 24, 1983, at which time a complete report-will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, C1 LL. Ch LW E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RQT:db cc:

See Page 2 de r306070078 830524

'o)j PDR ADOCK 05000528 S

PDR

  • J.*
  • U. S. Nuclear Regulatory Commission

-Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4

T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339

.