SOUTH CAROLINA ELECTRIC & GAS COMPANY 0
post omes n4 4
cotuusiA south CAnouNA 29218
=.
O. W. DixoN JR.
Y nucIn$ o'U r$,.s May 27, 1983
$0 9-Mr. James P. O'Reilly r0 Regional Administrator 04 U.S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.
Atlanta, Georgia 30303
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report per Technical Specification 6.9.2
Dear Mr. O'Reilly:
This Special Report is being submitted as a followup to a Special Report dated April 15, 1983, regarding entry into the Action Statement of Technical Specification 3.7.10, " Fire Rated Assemblies," on March 17, 1983.
As stated in this initial report, Virgil C. Summer Nuclear Station began a plant outage to perform the required D-3. Steam Generator modifications.
In conjunction with this, a number of other modifications were undertaken, some of which required the removal from service of certain fire barriers.
Attached is a listing by room number of the areas affected during various modifications that were out of service longer than the specified seven (7) days.
Also listed is the completion date for each area.
Restoration to service of the affected fire rated assemblies was accomplished through an inspection performed by the Quality Control group on site.
l During the time the fire rated assemblies were out of service, a one (1) hour fire watch patrol was in effect for these areas pursuant with the requirements of Technical Specification 3.7.10, l
Action Statement (a).
Virgil C. Summer Nuclear Station entered Mode 4 on May 17, 1983, and as stated in our initial report, we are submitting this report to the Nuclear Regulatory Commission within ten (10) days following the entry into Mode 4.
i l
i l
8306070128 930527 bpp'~CIAL COPY
~~
I
~ -
PDR ADOCK 05000395 j
S PDR t-c'L L 'l
- Mr. James P.
O'Reilly Special Report Page Two May 27, 1983 Should there be_any questions, please call us at your convenience.
Very trul
- yours, O. W. dixon, RJB:OWD/dwf Attachment cc:
V.
C.
Summer E. H. Crews, Jr..
T.
C.
Nichols, Jr.,/O. W.
Dixon, Jr.
E.
C.
Roberts H.
N.
Cyrus Group / General Managers O.
S. Bradham R.
B.
Clary C. A.
Price A.
R.
Koon D. A.
Lavigne C.
L. Ligon (NSRC G. J. Braddick J.
C. Miller J. L.
Skolds J.
B.
Knotts, Jr.
I&E (Washington)
Document Management Branch INPO Records Center NPCF File (Lic./Eng.)
w n
w
ATTACHMENT BOILDING ROOM DATES OF INOPERABILITY CONTROL 12-03 4/16--5/06 12-04 4/16--5/13 25-01 3/19--5/05 25-02 4/14--5/05 36-03 4/14--4/28 36-04 4/08--5/05 36-09 3/19--4/16 48-01 4/29--5/03 48-02 4/04--4/11, 4/16--4/30 63-05 3/30--5/03, 5/04--5/11 AUXILIARY 12-02 4/21--5/12 26-01 4/16--4/25 36-18 4/16--4/25, 4/28--5/03 63-01 3/23--4/19 INTERMEDIATE 12-02 3/22--4/30 36-02 4/07--5/03 FUEL HANDLING 36-01W 4/06--4/16 WEST 12-01 3/31--5/10 PENETRATION 36-01 3/11--5/11 ACCESS AREA EAST 12-02 3/23--5/06 PENETRATION 36-02 3/11--5/09 ACCESS AREA DIESEL 436' 4/21--4/27 GENERATOR 1