j Carolina Power & Light Company P. O. Box 101, New Hill, N. C.
27562 j
September 30, 1982 Mr. James P. O'Reilly NRC-7 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)
Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1985 900,000 KW - UNITS 1 & 2 USE OF ASTM-A307 NUTS AND BOLTS FOR BOLTED CONNECTIONS WHERE ASTM-A325 NUTS AND BOLTS WERE REQUIRED - ITEM 97
Dear Mr. O'Reilly:
On September 3, 1982, Mr. L. E. Jones notified the NRC (Mr. A. Hardin) of a potentially reportable item, per the provisions of 10CFR50.55(e). Thi concerned the use of ASTM-A307 bolts in bolted connections in the conta ment No. 1 recirculating sump cover structural steel in lieu of the ASTM-A32 bolts 7 "2
specified.
en 4
w This item has been referred to our architect / engineers, Ebasco Services, for? o evaluation and is still being evaluated. We expect the evaluation tode
,af r
complete by mid October, 1982. Since the bolts used throughout the R3tform"p were incorrect, the entire platform must be evaluated using the design and M e seismic loading, considering the lower strength bolts. To date, all polts)l2 have been replaced with ASTM-A325 bolts and reinspected.
As soon as the evaluation is complete, we will advise you immediately of the status of reportability.
Yours very truly, N
f: ;&
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh cc:
Mr. G. Maxwell t*y Ab Mr. V. Stello (Nld) l i OFFICIALCOPV.]