Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000285/LER-1978-035, Forwards LER 78-035/03L-0 + (ML20071G064)
- 05000285/LER-1978-035-03, /03L-0 on 781113:during Test of Ventilation Isolation Actuation Signal,Lockout 86B1/VIAS Did Not Trip. Cause Unidentified,Since Relay Retested & Found to Be Operating Normally.Relays Will Continue to Be Tested + (ML20071G070)
- 05000285/LER-1978-037, Forwards LER 78-037/03L-0 + (ML20071G074)
- 05000285/LER-1978-038, Forwards LER 78-038/01T-0 + (ML20071G082)
- 05000285/LER-1978-038-01, /01T-0 on 781127:Diesel Generator 2 Failed to Auto Close Onto the Bus;Breaker Mode Switch Contracts 27-27c Failed to Make Contact.Caused by Contact Failure + (ML20071G085)
- IR 05000285/2019005 + (ML20071G087)
- ML20071G091 + (ML20071G091)
- ML20071G093 + (ML20071G093)
- LD-94-047, Forwards Replacement Page for System 80+ Emergency Operations Guidelines + (ML20071G095)
- ML20071G097 + (ML20071G097)
- ML20071G098 + (ML20071G098)
- 05000285/LER-1978-037-03, /03L-0 on 781116:during Refueling,All Limitorque Valves Were Inspec for Proper Staking of the Lock Nut on the Motor operator.30 of 65 Valves Exhibited Unstaked Lock Nuts.Lock Nuts Were Staked IAW Manufacturers Instructions + (ML20071G101)
- ML20071G108 + (ML20071G108)
- ML20071G113 + (ML20071G113)
- PMNS20200214, Meeting Between the NRC Staff and the Nuclear Energy Institute + (ML20071G118)
- ML20071G122 + (ML20071G122)
- ML20071G124 + (ML20071G124)
- PMNS20200187, Meeting Between the NRC Staff and Westinghouse Electric Company + (ML20071G127)
- ML20071G129 + (ML20071G129)
- ML20071G130 + (ML20071G130)
- 05000333/LER-1978-085, Forwards LER 78-085/04X-1 + (ML20071G132)
- 05000333/LER-1978-085-04, /04X-1 on 781006:3rd Quarter Release of Halogens & Particulates Greater than Tech Specs.Caused by Steam Leaks & Fuel Pin Clad Performance + (ML20071G139)
- ML20071G145 + (ML20071G145)
- ML20071G151 + (ML20071G151)
- ML20071G154 + (ML20071G154)
- ML20071G155 + (ML20071G155)
- ML20071G158 + (ML20071G158)
- RBG-40695, Provides Details Re Statement Contained in Insp Rept 50-458/94-03 Which Describes Some MOV Actions Planned for Refueling Outage (Rf) 5,as Discussed W/Nrc on 940324 (Before Commencement of RF5) + (ML20071G161)
- NRC-94-0057, Requests That Service List for Correspondence Re Fermi 2 Be Revised to Reflect Appointment of LS Goodman to Position of Director - Nuclear Licensing.Remaining Info for Director - Nuclear Licensing Entry on Svc List Unchanged + (ML20071G165)
- ML20071G166 + (ML20071G166)
- ML20071G167 + (ML20071G167)
- ML20071G170 + (ML20071G170)
- ML20071G171 + (ML20071G171)
- ML20071G180 + (ML20071G180)
- 2CAN058302, Forwards Arkansas Nuclear 1 Steam Electric Station,Unit 2, Cycle Three Startup Rept, Summarizing Precritical,Low Power & Power Escalation Testing for Period Ending 830104 + (ML20071G184)
- ML20071G190 + (ML20071G190)
- ML20071G191 + (ML20071G191)
- ML20071G192 + (ML20071G192)
- ML20071G211 + (ML20071G211)
- IR 05000443/2020401 + (ML20071G213)
- ML20071G215 + (ML20071G215)
- 05000285/LER-1978-039, Forwards LER 78-039/03L-0 + (ML20071G216)
- 05000285/LER-1978-039-03, /03L-0 on 781122:noted That Level Transmiter for C Channel (C/LT-901) for Steam Generator RC-2A Level Instrumentation Not W/In Specs.Caused by Calibr Drift of Ge/Mac Model 555 Transmitter + (ML20071G220)
- ML20071G221 + (ML20071G221)
- ML20071G224 + (ML20071G224)
- 05000285/LER-1978-031, Forwards LER 78-031/03X-1 + (ML20071G230)
- ML20071G237 + (ML20071G237)
- 05000285/LER-1978-031-03, /03X-1 on 780918:during Refueling Outage,D Channel Hot Leg Temp Indication Was Investigated to Determine Cause of 780918 Failure.Failure Caused by Rosemount Model 104VC RTD Having Water in the Pothead + (ML20071G238)
- ML20071G239 + (ML20071G239)
- ML20071G242 + (ML20071G242)
- 05000333/LER-1978-094, Forwards LER 78-094/03L-0 + (ML20071G243)