Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067E581 + (ML20067E581)
- ELV-02507, Summarizes Progress in Safeguards Info Review Program Implemented to Minimize Future Safeguards Info Violations Discussed at 901113 Enforcement Conference.Overall Program Will Not Be Completed Until 910630 + (ML20067E583)
- ML20067E584 + (ML20067E584)
- ML20067E587 + (ML20067E587)
- 05000254/LER-1989-022, :on 891128,unit 1 High Pressure Coolant Injection Sys Declared Inoperable Following Unexpected Actuation of HPCI Pump Room Deluge Sys.Cause Unknown. Procedure Revised & Operator Trained + (ML20067E588)
- ML20067E592 + (ML20067E592)
- ML20067E596 + (ML20067E596)
- 05000298/LER-1991-001, :on 910107,unplanned Actuation of Group IV Isolation Logic Occurred.Caused by Incorrect Placement of Jumper.Event Incorporated in Industry Events Training for I&C Technicians + (ML20067E602)
- ML20067E604 + (ML20067E604)
- ML20067E605 + (ML20067E605)
- ML20067E609 + (ML20067E609)
- JAFP-91-0103, Rept of 10CFR20.407 for CY90,consisting of Number of Individuals for Whom Personnel Radiation Monitoring Provided & Estimated Whole Body Exposure Range (Rem) + (ML20067E612)
- ML20067E616 + (ML20067E616)
- ELV-02504, Forwards Findings & Corrective Actions Taken by Smithkline Beecham Clinical Labs Re Two Presumptive Positive Samples Forwarded from Southern Nuclear Operating Co on 910108 for Confirmation Testing + (ML20067E620)
- ML20067E623 + (ML20067E623)
- ST-HL-AE-3677, Forwards Semiannual fitness-for-duty Program Performance Rept for Second Half 1990 + (ML20067E625)
- ML20067E632 + (ML20067E632)
- 05000336/LER-1991-001, :on 910110,main Turbine Tripped on Low electro- Hydraulic Pressure.Caused by Failure of electro-hydraulic Control Sys Pumps.Pump Discharge Filters Changed Out & Replaced W/Spare Pump + (ML20067E641)
- ML20067E716 + (ML20067E716)
- ML20067E723 + (ML20067E723)
- ML20067E725 + (ML20067E725)
- ML20067E734 + (ML20067E734)
- ML20067E739 + (ML20067E739)
- ML20067E746 + (ML20067E746)
- ML20067E767 + (ML20067E767)
- ML20067E769 + (ML20067E769)
- ML20067E777 + (ML20067E777)
- ML20067E781 + (ML20067E781)
- ML20069A002 + (ML20069A002)
- ML20069A003 + (ML20069A003)
- ML20069A004 + (ML20069A004)
- SECY-20-0024, Weekly Information Report - Week Ending February 28, 2020 + (ML20069A007)
- PMNS20200193, Annual Assessment Meeting + (ML20069A010)
- PMNS20200195, Annual Assessment Meeting + (ML20069A011)
- PMNS20200196, Forthcoming Public Meeting with Oregon State University Regarding Pre-ApplicationDiscussion for License Amendment Request for Removal of the Instrumented Fuelelement Requirement from Technical Specifications + (ML20069A020)
- ML20069A021 + (ML20069A021)
- ML20069A022 + (ML20069A022)
- ML20069A023 + (ML20069A023)
- ML20069A024 + (ML20069A024)
- ML20069A025 + (ML20069A025)
- ML20069A026 + (ML20069A026)
- ML20069A027 + (ML20069A027)
- ML20069A029 + (ML20069A029)
- RC-94-0141, Forwards Response to NRC 940425 RAI for SG Replacement (Sgr) Review.Rev to Pages Xiv & 3.2-3 of 931029,submittal Supporting Sgr TS Changes.Informs That Minor Rev to LOCA Hydraulic Loads on Core Barrel Made + (ML20069A031)
- ML20069A036 + (ML20069A036)
- ML20069A040 + (ML20069A040)
- 2CAN028312, Forwards Monthly Operating Rept for Jan 1983 + (ML20069A041)
- 05000267/LER-1978-031, Forwards LER 78-031/03L-0 + (ML20069A044)
- 05000267/LER-1978-031-03, /03L-0 on 780925:during Routine testing,1 of 5 Heating Ventilation & Air Conditioning Sys Isolation Dampers for 480 Volt Switchgear Room Would Not Shut,Due to Faulty O-ring in Damper Jamming Open Actuating Shaft + (ML20069A050)
- ML20069A053 + (ML20069A053)
- ML20069A056 + (ML20069A056)