Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065R400 + (ML20065R400)
- ML20065R402 + (ML20065R402)
- 05000366/LER-1982-105, Forwards LER 82-105/03L-0 + (ML20065R404)
- JAFP-94-0240, 1993 Radiological Environ Operating Rept Ja FitzPatrick Nuclear Power Plant + (ML20065R405)
- ML20065R413 + (ML20065R413)
- 05000366/LER-1982-105-03, /03L-0:on 820918,during Selection of Rods to Increase Power,Rod Out Permissive Light Went Out.Caused by Blown Power Fuse.Fuse Replaced + (ML20065R417)
- ML20065R439 + (ML20065R439)
- ML20065R441 + (ML20065R441)
- AECM-90-0208, Forwards Rev 5 to Updated FSAR for Grand Gulf Nuclear Station & Lists Overview of Key Changes in Rev 5 of FSAR Update.Update to Current Cycle Safety Analysis Will Be Submitted Prior to 910131 + (ML20065R443)
- ML20065R445 + (ML20065R445)
- 05000272/LER-1982-016-04, During Gaseous Release from Waste Gas Sys,Containment/Plant Vent Monitors 1R11A, 1R12A & 1R12B Incorrectly Aligned.Caused by Operator Failure to Properly Perform Operating Instruction + (ML20065R446)
- ML20065R451 + (ML20065R451)
- 05000275/LER-1982-009, Forwards LER 82-009/01T-0 + (ML20065R452)
- ML20065R453 + (ML20065R453)
- ML20065R456 + (ML20065R456)
- 05000275/LER-1982-009-01, /01T-0:on 821007,testing on Auxiliary Saltwater Sys Revealed Sys Susceptible to Water Hammer Effects During Anticipated Operational Transients.Caused by Water Column Separation & Recombination at Piping Slope Change + (ML20065R457)
- ML20065R460 + (ML20065R460)
- ML20065R461 + (ML20065R461)
- ML20065R464 + (ML20065R464)
- ML20065R469 + (ML20065R469)
- PLA-1362, Application for Amend 13 to License NPF-14,revising License Condition 2.D to Reflect Changes J,K,L & M,Revision to Chapter 11 & Security Training & Qualification Plan Including Revision 1 & Change A.Class II Amend Fee Encl + (ML20065R471)
- 05000296/LER-1982-037, Forwards Updated LER 82-037/01X-1 + (ML20065R473)
- 05000296/LER-1982-037-01, During Instrumentation Calibr for Core Standby Cooling Sys Suppression Chamber, Calibr Valve on Level Switch LS-73-57A Found Open Rendering Switches Inoperable.Caused by Open Valve.Valve Closed + (ML20065R477)
- ML20065R499 + (ML20065R499)
- ML20065R509 + (ML20065R509)
- 05000324/LER-1982-112, Forwards LER 82-112/03L-0 + (ML20065R512)
- NG-90-2775, Responds to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. No Valves Identified W/Deficiencies of Greater Significance than Six Containment Isolation Valves of Concern + (ML20065R513)
- 05000324/LER-1982-112-03, /03L-0:on 820929,suppression Chamber Water Temp Recorder 2-CAC-TR-778 Discovered Intermittently Recording Temps on Chart Recorder.Caused by Out of Adjustment Recorder Print Actuation Solenoid.Solenoid Adjusted + (ML20065R521)
- 05000263/LER-1989-021-01, :on 890916,crack Was Discovered on Upper Support Brace of Jet Pump.Caused by High Cycle Fatigue. Corrective Action:Recirculation Pump Speed Was Limited & Testing Demonstrated Cracking Is self-limiting + (ML20065R523)
- ML20065R528 + (ML20065R528)
- 05000368/LER-1990-022, :on 900926,discovered That Coil Unit Mounting Brackets Improperly Installed on Fan Side of Svc Water Sys Coolers.Caused by Inadequate Work Instructions During Coil Replacement.Units Drained + (ML20065R529)
- ML20065R534 + (ML20065R534)
- ML20065R550 + (ML20065R550)
- PY-CEI-NRR-1228, Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790) + (ML20065R552)
- ML20065R556 + (ML20065R556)
- 05000321/LER-1982-086, Forwards LER 82-086/03L-0 + (ML20065R558)
- ML20065R565 + (ML20065R565)
- 05000280/LER-1982-100-03, /03L-0:on 820922,pump 1-SWP-10B Became Airbound During Use of Air to Clear Sensing Lines to Water Strainers in Delta P Gauges.Caused by Injecting Air Into Svc Water Lines Upstream of Pump.Personnel Reinstructed + (ML20065R577)
- ML20065R581 + (ML20065R581)
- 05000321/LER-1982-086-03, /03L-0:on 820917,attempt to Place Torus Cooling in Svc Failed Due to Lack of Svc Water Flow.Caused by Loose Bolts in Valve Operator Coupling,Allowing Coupling Spring Pin to Break.Pin Replaced & Bolts Tightened + (ML20065R582)
- ML20065R583 + (ML20065R583)
- ML20065R588 + (ML20065R588)
- ML20065R595 + (ML20065R595)
- 05000280/LER-1982-102-03, /03L-0:on 820923,discovered Pin Attaching Snubber 1-SHP-HSS-35B to Main Steam Line Partially Out & Snubber Cocked.Caused Undetermined.Snubber Straightened & Pins Properly Installed + (ML20065R597)
- 05000325/LER-1994-006-01, :on 940412,discrepancy Had Been Noted on Inputs for APRMs & Irms.Caused by Failure to Follow Standard Conventions for RMCS APRM & IRM Grouping.Corrective Action: Standing Instruction Was Issued + (ML20065R598)
- LIC-90-0985, Monthly Operating Rept for Nov 1990 for Calhoun Station Unit 1 + (ML20065R599)
- ML20065R600 + (ML20065R600)
- 05000327/LER-1982-116, Forwards LER 82-116/03L-0 + (ML20065R601)
- ML20065R602 + (ML20065R602)
- 05000327/LER-1982-116-03, /03L-0:on 820916,both Trains of RHR Sys Inoperable Due to Inadvertent Closing of RHR Suction Valve 1-FCV-74-2. Caused by Removal of Power Fuses to Allow Work on Output Relays.Rhr Pump Stopped & Valve Reopened W/Auxiliary Pow + (ML20065R611)
- ML20065R612 + (ML20065R612)