Supplemental Deficiency Rept CP-87-127 on Overstressed Platform & Support Structure Design.Initially Reported on 880106.Corrective Actions Associated W/Unit 2 Scheduled to Be Completed Prior to Fuel Load
ML20065R499
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/12/1990
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-87-127, TXX-901036, NUDOCS 9012190071
Download: ML20065R499 (1)


Text

'

i,.r M

"~~~ : 3 Log # TXX 901036 Fi1e # 10110 903.8 Ref. # 10CFR50.55(e) 7UELECTR/C wmism J. cehili. Jr.

December 12, 1990

[tNuthw Vict htshlil U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

C0HANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 and 50 446 OVERSTRESSED PLATFORM AND SUPPORT STRUCTURE DESIGN SDAR:

CP 87 127 (SUPPLEMENTAL REPORT)

Ref:

1) TV Electric Letter logged TXX-88016 from W. G. Counsil to NRC dated January 6, 1988 2)

TV Electric Letter logged TXX 89356 from William J. Cahill, Jr.,

to NRC dated July 31, 1989 3)

TV Electric Letter logged TXX-88176 from W. G. Counsil to NRC dated February 5, 1988 Gentlemen:

On January 6,1988, TV Electric notified the NRC via report logged TXX-88016 (Ref. 1), of a reportable deficiency involving platforms and support structures which may be overstressed.

The last report on this issue was logged TXX-89536, dated July 31, 1989 (Ref. 2).

The purpose of this supplemental report is to correct an error in the earlier report on this issue, logged TXX-88176 dated February 5, 1988 (Ref 3),

in TXX-88176, TV Electric stated that " design validation of seismic category I and 11 steel structures has been completed for Units 1 and 2, and design modifications have been issued to correct installations which do not conform to the revised criteria." The unit designation in the above statement should have read "... Unit 1 and Common...."

Corrective actions associated with Unit 2 are scheduled to be completed prior to Unit 2 fuel load.

Sincerely,

/

William J. Cahill, Jr.

CBC/bm c

Mr. R. D. Hartin, Region IV Resident inspectors, CPSES (3) 9012190071 901212 PDR ADOCK 05000445 S-PDR Do19

_7 7 fj.