- ML20065D245 + (ML20065D245)
- NG-94-1150, Part 21 Rept Re Defect Identified W/ C RHR Pump Motor from Daec.Pump Performance Degraded.Installed New Shaft Rotating Element,Wear Ring & Hydrostatic Bearing & Replaced Pump Mechanical Seal & Motor Thrust + (ML20065D279)
- ML20065D283 + (ML20065D283)
- ML20065D287 + (ML20065D287)
- ML20065D288 + (ML20065D288)
- ML20065D290 + (ML20065D290)
- ML20065D292 + (ML20065D292)
- ML20065D295 + (ML20065D295)
- AECM-90-0172, Forwards Endorsement 67 to Nelia Policy NF-257 & Endorsement 46 to Maelu Policy MF-106 + (ML20065D299)
- ML20065D301 + (ML20065D301)
- RBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed + (ML20065D327)
- ST-HL-AE-3578, Forwards 1RE02 Inservice Insp Summary Rept for Welds & Component Supports..., Describing Exams Performed During Period of 900329-0621,per 1983 Edition of ASME Code,Section XI & Summer 1983 Addenda + (ML20065D332)
- ML20065D336 + (ML20065D336)
- ML20065D349 + (ML20065D349)
- ML20065D358 + (ML20065D358)
- ML20065D364 + (ML20065D364)
- ML20065D369 + (ML20065D369)
- HL-1176, Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date + (ML20065D373)
- ML20065D374 + (ML20065D374)
- ST-HL-AE-3565, Forwards Rev 8 to Operations QA Plan. Plan Revised in Order to Include More Detailed Criteria of Chapter 17.2 of Updated Fsar.Approval Requested + (ML20065D376)
- ML20065D379 + (ML20065D379)
- ML20065D382 + (ML20065D382)
- ML20065D383 + (ML20065D383)
- ML20065D385 + (ML20065D385)
- ML20065D386 + (ML20065D386)
- ML20065D414 + (ML20065D414)
- 3F0990-08, Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure + (ML20065D415)
- 05000440/LER-1990-017, :on 900814,thermal Power Exceeded Authorized Limits Due to Feedwater Heater Level Control Failure.Caused by Component Failure W/Contributing Procedural Deficiency. Off Normal Instruction Enhanced + (ML20065D417)
- 05000306/LER-1990-003, :on 900316,reactor Trip Occurred Following Resetting of Rod Control Sys Urgent Failure Alarm.Caused by Personnel Error.Temporary Operating Instructions Issued to Not Reset Alarms Until Consulting W/I&C Dept + (ML20065D422)
- ML20065D424 + (ML20065D424)
- ML20065D442 + (ML20065D442)
- ML20065D467 + (ML20065D467)
- ML20065D480 + (ML20065D480)
- ML20065D487 + (ML20065D487)
- ML20065D490 + (ML20065D490)
- TXX-9032, Supplemental Deficiency Rept CP-87-63 Re Pipe Weld Insp Criteria.Initially Reported on 870922.Util Determined That Reverification of Inps Not Required for Unit 2.New Unit 2 Installations Will Continue Per Radial Weld Shrinkage + (ML20065D491)
- ML20065D493 + (ML20065D493)
- ML20065D495 + (ML20065D495)
- ML20065D507 + (ML20065D507)
- ML20065D510 + (ML20065D510)
- ML20065D526 + (ML20065D526)
- ML20065D530 + (ML20065D530)
- ML20065D533 + (ML20065D533)
- ST-HL-AE-3570, Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan + (ML20065D539)
- ML20065D544 + (ML20065D544)
- ML20065D546 + (ML20065D546)
- ML20065D549 + (ML20065D549)
- ML20065D551 + (ML20065D551)
- ML20065D567 + (ML20065D567)
- 05000382/LER-1994-003-01, :on 940305,discovered Reactor Protection Inoperable Due to Missed Surveillances.Caused by Omission of Relevant Info from Procedures.Procedures Revised & Personnel Debriefed + (ML20065D573)
- ML20065D582 + (ML20065D582)