ML20065D358
| ML20065D358 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/20/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20065D363 | List: |
| References | |
| NUDOCS 8209300007 | |
| Download: ML20065D358 (8) | |
Text
. ~..
. ~
- [f 4
UNITED STATES
, g' '( [ 7, NUCLEAR REGULATORY COMMISSION g *-
,, - E WASHINGTON, D. C. 20555
'%d 5
ALABAMA POWER COMPANY DOCKET N0. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE
, Amendment No. 27 License No. NPF-2 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Alabama Power Company (the licensee) dated August 3, 1982, supplemented by letter dated August 20, 1982, complies with the standards and recuirements of the Atomic Energy Act of 1954, as amended (the Ar.t) and the Comission's rules and regulations set forth in 10 ;FR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment is in accordance with 10 CFR Part l
51 of the Comission's regulations and all applicable requirements have been satisfied.
e209300007 820920 PDR ADOCK 05000348 p
--_ _ _ - _ _ _ _ _ _ n.w.w.- a.
, 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 27, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance, but expires on September 1,1983.
F0 THE NU LE REGULATORY COMMISSION D
h
/ j,
%d
teven arga, C i
, Operating Reactors nch No. 1 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 20, 1982
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 27 TO FACILIT( OPERATING LICENSE N0. NPF-2 DOCKET NO. 50-348 Revise Appendix A as follows:
Remove Page Insert Page 3/4 8-5 3/4 8-5 h
ELECTRICAL POWER SYSTEMS l
SURVEILLANCE REQUIREMENTS (Continued)
--_-====_-====_________
operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 + 420 volts and 60 + 1.2 Hz during this test.
c)
Verifying that all automatic diesel generator trips, except engine overspeed and generator differential and low lube oil pressure, are automatically bypassed upon loss of voltage on the emergency bus and/or a safety injection test signal.
5.
Verify that the diesel generators operate for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while loaded to 4353 kw* for the 4075 kw diesels and 3100* for the l
2850 kw diesels (2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating). After completing this 24-hour test, manually trip the diesel generator from the 2000-hour
- load and demonstrate hot restart capability by I
performing Surveillance Requirement 4.8.1.1.2.a.4 within 10 minutes.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000-hour rating of 4353 kw for the 4075 kw generator and 3100 kw for the 2850 kw generator.
7.
Verifying the diesel generator's capability to:
a)
Synchronize with the offsite power source while the gener-ator is loaded with its emergency loads upon a simulated restoration of offsite power.
b)
Transfer its loads to the offsite power source, and c)
Be restored to its standby status.
8.
Verifying that with the diesel generators operating in a test mode (connected to its bus), a simulated safety injection signal overrides the test mode by returning the diesel generator to standby operation.
9.
Verifying that the automatic load sequence timer is OPERABLE with each load sequence time within + 10% of its required value or 0.5 seconds whichever is greater.-
10.
Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:
a)
Oil Temperature High (OTH)
- For a one-time period only that expires on September 1,1983, the load shall be as shown (i.e., the 2000-hour ratings) for a minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and for the remainder of the 24-hour period, the loads shall be at the continuous rating.
Reduction of load as necessary immediately prior to tripping is acceptable for this one-time period.
FARLEY-UNIT 1 3/4 8-5 AMENDMENT N0. 27
= = ~ _
, e u ro,
/
9, UNITED STATES 8
NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20555
\\....+/
ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.16 License No. NPF-8 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Alabama Power Company (the 1.icensee) dated August 3,1982, supplemented by letter dated August 20, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (th Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the healtif and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l
{
L,..--_,-..
, 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to -ead as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
16, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the d' ate of its issuance, but expires on September 1,1983.
HENUCLEARpEGULATORYCOMMISSION F0F OE 9
A 6tdven arga, Ch f Operating Reactors Br nch No. 1 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 20, 1982 l
l
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.16 TO FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Revise Appendix A as follows:
Remove Page Insert Page 3/4 8-5 3/4 8-5 b
1
+
i l
9 I
l
.m
..,,, -. =..
x,-...,...-.,,,._.-..s.-_,_,._-,__,.,
m
ELECTRICAL, POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 + 420 volts
~
and 60 + 1.2 Hz during this test.
c)
Verifying that all automatic die'sel generator trips, except engine overspeed and generator differential and low lube oil pressure, are automatically bypassed upon loss of voltage on the emergency bus and/or a safety injection test signal.
5.
Verify that the diesel generators operate for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while I
loaded to 4353 kw* for the 4075 kw diesels and 3100* for the 2850 kw diesels (2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating). After completing this 24-hour test, manually trip the diesel generator from the I
2000-hour
- load and demonstrate hot restart capability by performing' Surveillance Requirement 4.8.1.1.2.a.4 within 10 minutes.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000-hour rating of 4353 kw for the 4075 kw generator and 3100 kw for the 2850 kw generator.
7.
Verifying the diesel generator's capability to:
a)
Synchronize with the offsite power cource while the gener-ator is loaded with its emergency loads upon a simulated resto*ation of offsite power, b)
Transfer its loads to the offsite power source, and c)
Be restored to its standby status.
8.
Verifying that with the diesel generators operating in a test mode (connected to its bus), a simulated safety injection signal overrides the test mode by returning the diesel generator to standby operation.
9.
Verifying that the automatic load sequence timer is OPERABLE with each load sequence time within + 10% of its required value or 0.5 seconds whichever is greater.
10.
Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:
a)
Oil Temperature High (OTH)
- For a one-time period only that expires on September 1,1983, the load shall be as shown (i.e., the 2000-hnur ratings) for a minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and for the remainder of the 24-hour period, the loads shall be at the continuous rating.
Reduction of load as necessary immeoiately prior to tripping is acceptable for this one-time period.
FARLEY-UNIT 2 3/4 8-5 AMENDMENT N0. 16
,