Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1982-152-03, /03L-0:on 821207,investigation of High Reading on Number 23 Steam Generator Steam Flow Channel II Revealed Transmitter Out of Calibr.Caused by Isolated Failure of Transmitter.Device Replaced & Channel Calibr + (ML20064H793)
- ML20064H797 + (ML20064H797)
- ML20064H801 + (ML20064H801)
- ML20064H805 + (ML20064H805)
- 05000366/LER-1982-130, Forwards LER 82-130/03L-0 + (ML20064H806)
- 05000416/LER-1982-071-99, /99X-1:on 820903,smoke Detectors in Fire Zones 2-4,1-18 & 1-23 Alarmed W/No Fire or Fumes Present.Cause Not Stated.Detectors Cleaned & Returned to Svc.Zones 1-18 & 1-23 Alarmed Again on 820929.Fire Watch Established + (ML20064H812)
- ML20064H815 + (ML20064H815)
- ML20064H817 + (ML20064H817)
- ML20064H818 + (ML20064H818)
- ML20064H821 + (ML20064H821)
- ML20064H822 + (ML20064H822)
- 05000366/LER-1982-130-03, /03L-0:on 821203,w/unit Shutdown for Refueling, Discovered Secondary Containment Integrity Above Refueling Floor Not Maintained.Caused by Defective Procedures. Procedures Revised + (ML20064H825)
- ML20064H828 + (ML20064H828)
- ML20064H829 + (ML20064H829)
- ML20064H831 + (ML20064H831)
- JAFP-83-0043, Forwards Monthly Operating Rept for Dec 1982 + (ML20064H832)
- ML20064H835 + (ML20064H835)
- 05000348/LER-1982-060-03, /03L-0:on 821217,leakage Rate for RCS Exceeded Required Rate.Caused by Failure to seal-wire Seal Injection Throttle Valves.Valves Adjusted & seal-wired + (ML20064H843)
- 2CAN128201, Forwards to Provide Record of Compliance W/Ie Bulletin 82-01, Rev 1,Suppl 1, Alteration of Radiographs of Welds in Piping Subassemblies + (ML20064H844)
- ML20064H846 + (ML20064H846)
- ML20064H847 + (ML20064H847)
- ML20064H850 + (ML20064H850)
- 05000338/LER-1978-127, Forwards LER 78-127/03L-0 + (ML20064H857)
- 05000338/LER-1978-127-03, /03L-0 on 781204:during Pwr Reduction,Axial Flux Difference Deviated Greater than 5%;during Return to Full Pwr Afd Deviated Greater than -5%.Caused by Load Reduction Caused by Unit Being on Load Following + (ML20064H861)
- 05000361/LER-1982-149, Forwards LER 82-149/03L-0.Detailed Event Analysis Submitted + (ML20064H867)
- ML20064H868 + (ML20064H868)
- 05000259/LER-1978-034, Forwards LER 78-034/01T-0 + (ML20064H869)
- HL-4528, Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Plant,Per 10CFR50.54(w)(3) + (ML20064H873)
- ML20064H874 + (ML20064H874)
- 05000259/LER-1978-034-01, /01T-0 on 781205:during Refueling Outage 6 MSIVs Exceeded Leakage Limits.Caused by Degradation of Valve Seating Surfaces Thru Normal Oper + (ML20064H877)
- ML20064H880 + (ML20064H880)
- 05000348/LER-1978-088, Forwards LER 78-088/03L-0 + (ML20064H882)
- 05000296/LER-1982-062, Forwards LER 82-062/03L-0 + (ML20064H885)
- ML20064H886 + (ML20064H886)
- 05000348/LER-1978-088-03, /03L-0 on 781125:Train a River Water Pumps Were Found in Tripped Condition & Could Not Be Started from Control Room.Cause of Occurrence Is Undetermined + (ML20064H887)
- ML20064H890 + (ML20064H890)
- 05000325/LER-1978-091, Forwards LER 78-091/03L-0 + (ML20064H892)
- ML20064H895 + (ML20064H895)
- 05000325/LER-1978-091-03, /03L-0 on 781120:Senior Control Operator Did Not Have Completed Hatch Leak Rate Test Before Beginning Reactor Startup Due to Misunderstanding.Test completed.GP-1 Revised to Require Leak Test Verification by Control Operators + (ML20064H896)
- ML20064H897 + (ML20064H897)
- 05000324/LER-1982-137, Forwards LER 82-137/03L-0 + (ML20064H900)
- ML20064H901 + (ML20064H901)
- 05000368/LER-1978-018, Forwards LER 78-018/03L-0 & 78-019/03l-0 + (ML20064H902)
- 05000361/LER-1982-149-03, /03L-0:on 821123,during Mode 1,while Attempting to Shift Steam Generator Feedwater from Auxiliary Feed to Main Feed,Containment Isolation Valve 2HV4730 Would Not Close. Caused by Failure of Limit Switch.Switch Adjusted + (ML20064H906)
- 05000368/LER-1978-018-03, /03L-0 on 781128:both Doors of the Personnel Hatch Doors Were Simultaneously Opened,Caused by a Sheared Mechanical Door Interrlock Gear Key.Mechanical Interlock Repairs Made & Containment Air Lock Declared Operable + (ML20064H907)
- 05000348/LER-1978-086, Forwards LER 78-086/03L-0 & 78-087/03L-0 + (ML20064H908)
- 05000361/LER-1982-151, Forwards LER 82-151/03L-0.Detailed Event Analysis Submitted + (ML20064H909)
- ML20064H910 + (ML20064H910)
- 05000348/LER-1978-085, Forwards LER 78-085/03L-0 + (ML20064H914)
- ML20064H918 + (ML20064H918)
- 05000348/LER-1978-086-03, /03L-0 on 781221:both Trains of Component Cooling Water Were Discovered to Be cross-connected at Charging Pump 1B.FNP-1-STP-23.7 Was Rev to Show Alignment of Charging Pump 1B to Either Train + (ML20064H919)