ML20064H918
ML20064H918 | |
Person / Time | |
---|---|
Site: | McGuire, Mcguire |
Issue date: | 01/31/1994 |
From: | Mccraw E, Robert Williams DUKE POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9403180203 | |
Download: ML20064H918 (13) | |
Text
, ,
< , ll I Duke neer Company Dectric Center PO,1brl006 Charlotte. N C 28201 1D06 l' DUKE POWER February 15, 1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 RE: McGuire Nuclear Station Docket No. 50-369 and 370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of January, 1994.
Very truly yours,
- 8. 0. A04%
E. O. McCraw, Manager Operations Performance & Automation E0M/ raw Attachments xc: Mark Lessor V. Nerses Project Manager Regional Administrator / Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D.C. 20555 Atlanta, GA 30323 INP0 Records Center Ms. Margaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 Circle 75 Parkway Suite 200 Atlanta, GA 30323 655 Engineering Drive Norcross, GA 30092 2843 American Nuclear Insurers George Maxwell c/o Dottie Sherman, ANI Library Senior Resident Inspector Town Center, Suite 300S McGuire Nuclear Station 29 South Main Street West Hartford, CT 06107-2445 9403180203 940131 PDR ADOCK 05000369 R PDR
, . _ , _ _ , rEH i, u.
3 e .,
File: GS 801.01 U.S. NRC McGuire February:15, 1994 Page 2 bc: K. S. Canady (EC08H)'
T. E. Mooney-(EC05N)
B. J. Horsley (EC03U) ..
N. A. Rutherford (EC071)
E. C. Fisher'(MNS)
B. W. Walsh (EC11C)
Judy Smoak (CNS)
C. D. Denton (PB05E)
D. R. Groux (0N01VP)
D. W. Denard (ON0102)
Candace Paton (PB02L)
G. A. Copp (EC050) (File)
B. T. Faulkenberry (EC07C)
R. 0. Sharpe (MNS DIRC)
D. E. Bortz (EC08G)
R. C. Norcutt (MG01A) t
4 OPERATING DATA REPOR.T DOCKET WD 50-369 DATE February 15. 1994 C S AT mG STATU3 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346-
- 1. Unit Name: McGuire 1
- 2. Reporting Feriod: January 1, 1994-January 31,1974
- 3. Licensed Thermal fewer (MWth 3411
- 4. Naseplate Rating (Gross MWeh 13054 Notes *Naseplate Rating
- 5. Cejign Electrical Rating (Net MWe h 1180 (Gross MWe) calculated as
- 6. Muinus Dependable Capatity (Gross NWeh 1171 1450.000 W A r .90 power
- 7. Maia n Dependable Capacity INet MWe):
1129 fa:ter per Page lii, ,
B. If Changes Occur in Capacity Ratings (itess Nusber 3 Through 7} Since Last NUREG-0020.
Report. Give fessonst ,
- 9. Faer Level To Which Restricted, if Any (Net MWeh
- 10. Reascn For Restrictions, If any:
This Month- Yr.-to-Date' Cusulative
- 11. Hours in Reporting Perice 744.0 744.0 106680.0
- 12. Nusher Of Hours Reactor Was Critical 532.0- 532.0 74552.5
- 13. Feactor Reserve Shutdown Hours -+- --0 -
-+-
14, Hours Generator Dn-Line 532.0 532.0 73751.5
- 15. Unit Feserve Shutda n Hours - - -+-
- 16. Gross Thersal Energy Ser'erated (MWH) 1795522 1795522 228520359
- 17. Gross Electrical Energy Generated (MWH) 622819 622019 78584974 .
- 19. Het Electrical Energy 5enerated (MWH) 594975 594975 75029125 'I 71.5 71.5. ;
- 19. Unit Service Fa:ter 69.1
- 20. Uriit Anilability Facter 71.5 71.5 69.1 j
- 21. Unit Cencity Facter (using MDC Net) 70.8 70.8 61.2 )
- 22. Unit Ca ptity factor (Using DER Net) 67.8 67.8 59.6
- 23. Unit Forced Outage Rate 28.5 23.5 14.4
- 24. Shutdan Schedcled Over Next 6 Months (Type, Date, and Duration of Eachh Ji0ffE
- 25. If Shut. Dan At End Of Report Period. Estimated Date of Startup: February 23. 1994 .)
26.. Units in Test' Status (Frict to Ccasercial Operation h Forecast -Achieved j l
\
INITIAL CRITICALITY ;
blTIAL ELECTRICITY ']
COMMERCIAL OPERATION 1 l
I a
n,n~,.,.-...._--- --
i 1
+
f
- b. .
l- OPERA 11NE DATA REPDRT i.
i' i
- . DOCKET ND 50-369
- j. UN!i McGuire 1 DATE Februarv 15, 1994 - -l
{'
- s. COMFLETED BY R.A.'Williass i
- - TELEPHONE 704-382-53 % .:
t t p .j I MONTH hnearv.19% i 4 4 4
s DAY AVERASE DAILY POWER LEVEL DAY AVERABE DAILY POWER LEVEL I l (MWe-Net) (MWe-Net) 6 4.
'! 1 1134 17 1138 ..
t -4 t.
l 2 1134 1B !!38- -
, 3 1132 19 1139
.4 1133 20 -1139
, .t
- i. $ 1134 21 1139 !
I 4
6 1134 22 1049 l 4
i ?
, 7 1137 23 1 )
!' 8 1139 24 0
, ?
! .. c;
[- .9 1138 25 0
!~ c j 10 1135 26 0
- j. 3 i
j L 11 !!38 27 0 i
l' <l'
! 12 1136 28 0 4
.);
13 !!39 29 0 l I
14- !!32 30 -O !
i-
- -15 !!33 31 0 l f .;
. 16 1137 ':
o !
1-(
i -. ti li' <
L
<. b h i y -et *m 4-e.h, b -e te -, w ww- w ev _ .--,yye,,mww.w,,c,,,,w-y.e,-.w...,ww.vm,am,m,+-,,am-,-.-.,+-_ .--h.U,..41. .,-.d..,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 '
UNIT NAME rl w ular, 1 DATE uz/13/v4 REPORT MONTH January 1994 COMPLETED BY x. a. wlbularid .
TELEPHONE tius)-asz-oaeo (1) 2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 94- 1-23 F 212.02 A 1 CH HTEXCH '1D' STEAM GENERATOR TUBE LEAK-(1) (2) (3) (4)
F Forced Reason: Method: Exhibit-G - Instructions S Scheduled 1-Manual for Preparation of, Data A-Equipment FailureB-Maintenance or test (Explain)
C-Refueling 2-Manual Scram EntW Sheets For Licensee Event Report (LER 3-Automatic Scram D-Regulatory Restriction , ,
4-Other (Explain) File ( M G-0161))
E-Operator. Training & License Examination F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)
]
. ;I
..j
- ')
r, ,
DOCKETS 50-369 UNIT: McGuire 1 Date: '02/15/94 l
l
-1
.l
- r.
NARRATIVE
SUMMARY
i l
-MONTH: January 1994 McGuire Unit 1 began the month of January operating at 100% full power. On 01/22/94 )
at 1753 unit started power decrease at 10%/ hour due to.'1D' steam generator tube leak of approximately'100 gallons / day. The unit was taken.'off-line on 01/23/94.at.
.0359 for '1D'. steam' generator tube. leak. The unit was in the outage-the remainder-of the month. ;
?
.1 i
l l
1 l
l l
Prepared by: R. A. Williams Telephone: (704)-382-5346 1
l I
l l
. . - _ . , . . . - _ - - . - - - ._ , ~ ~ . _ . ,. . - . . . 7
7
. j MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: McGuire, Unit 1 2 -. Scheduled next refueling shutdown: August 1994
- 3. Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE l COMMUNICATION'OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
-4. Will refueling-or resumption of operation thereafter require'a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in'the spent fuel pool: 583
- 8. Present licensed fuel pool capacity: 1463 Size of requested or_ planned increase: --- ,
- 9. Projected date of last refueling which can be accommodated by.
present licensed capacity: March 2006 DUKE POWER COMPANY = DATE: February 15. 1994 Name of
Contact:
R. A. Williams Phone: -(704)-382-5346 r
h
g .. . - , _ _ . - _. .
p4 ,
O I
J i
CPERAIING DATA REPORI 1 DOCKET ND 50-370 DATE February 15. 1994 .
0PERATING STATUS COMPLETED 91 R.A. Williams-3 TELEPHONE 704-382-5346
- 1. Unit Naae: McGuire 2
- 2. Reportirig Period: January 1, 1994-January 31,1994
- 3. Licensed Thersal Power (MWt): 3411
. 4. Naseplate Rating (Brass MWe): 1305s Notes
- Nameplate Rating :
- 5. Design Electrical Rating (Net MWeb 1180 (Bross MWe) calctilated as ,
- 6. Mu iaus Dependable Capacity (Bross MWe): 1171 1450,000 MVA x .90 poner
- 7. Maxieus Depetidable Capacity (Net MWe): 1129 factor per Page iii,
- 8. If Changes Dccur in Capacity Ratings (! tens Nusber 3 1hrough 7) Since Last N'J RES-0020.
Repert. Give Reastas
- 9. Pcwer Level Ic Which Restricted, If Any (Net MWe):
- 10. Reascn for Restrictiens, if any: ,
This Month Yr.-to-Date Cueulative ,
- 11. hours In Reporting Period 744.0 744.0 86976.0
- 12. Nueber Df Hears Reacter Was Critical 601.4 601.4 66443.4
- 13. Reacter Reserve Shutdown Hours --0-- - - 14. Hours Generator On-Line 599.1 599.1 65475.3
- 15. Unit Reserve Stutdewn hours --0-- --0-- -
- 16. Sross Thermal Energy Senerated (MWH) 2015852 2019852 213890839
. 17. Stoss Electrical Energy Generated (MWH) 706506 706506 74755441
- 18. Net Electrical Energy Generated (MWH) 677935 677935 71644055
- 19. Unit Service Facter 80.5 80.5 75.3
- 20. Unit Availability Factor 80.5 B0.5 75.3
- 21. Unit Capacity factor (Using MDC Net) 80.7 80.7 72.1
- 22. Unit Capacity factor (Usir.g DER tiet) 77.2 77.2 69.8
- 23. Unit Forced Dotage Rate 19.5 19.5 7.3
- 24. Shutdoun Schedcled Over Next 6 Months (Type, Date, and Duration of Each): -1 JONF
- 25. lf Shut Down At End Of Repcrt Period. Estimated Date of Startupt
- 26. Units In Test Status (Prior to Ceasercial Operatton): Forecast Achieved
!NITIAL CRITICALITY t
INiilAL ELECTRICITY _
COMERCIAL DFERAT10N ,
. w + 4
y OPERATING DATA REPORT DOCKET NG 50-370 tiNIT McGuire 2 DATE february 15, 1994 COMftETED 81- R.A. idilliams TELEPHONE 704-302-5346 MONTH January. 1994
. LAY, AVERASE DAILY POWER LEVEL D.J_Y AVERAGE DAILY F0WER LEVEL (Ne-Ne t) (Me-Net) 1 0 17 1152 2 0 18 1152
-3 0 19 !!51 4 0 20 1151 5 0 El 1151 6 0 22 1151 7 773 23 1'49 '
B- 1148 24 1150 9 !!49 25 1150 10 115_0, 26 1149 11 1151 27 1149-12 1151 22 1150 13 I152 29 1149
.14 1152 30 !!v9 15 !!53 31 1149 16 1152
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370
- UNIT NAME nw uixt. z DATE uz/infv4 REPORT MONTH January 1994 COMPLETED BY x. A. w1LLinnd .
TELEPHONE t/v43-auz-nJ4o (1) f2) f3g (4) (5) ,
E HOD T A OF LICENSE N- Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURAT1.J O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 94 1 F 72.00 A --
SF HTEXCH ICE CONDENSER INSPECTION 2 94 3 F 72.95 A --
EA XXXXXX LOSS OF OFF-SITE POWER 1-P 94 7 S --
A --
HG XXXXXX HOLDING AT 30% POWER FOR SECONDARY CHEMISTRY 2-P 94 7 S --
A --
IA INSTRU HOLDING AT 49% POWER FOR NUCLEAR INSTRUMENTATION ADJUSTMEh"E (1) (2) (3) (4)
F Forced S Scheduled Reasory A-Equipment Failure (Explain)
. Method:
1-Manual Exhibit G - Instructions for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory R9striction ,
E-Operator Training & License Examination 4-Other (Explain) File (NUREG-0161))
F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)
..,i
. DOCKET: 50-370 UNIT: McGuire 2 I
Date: 02/15/94-NARRATIVE
SUMMARY
MONTH: 3anuary 1994 ;
McGuire Unit 2 began the month of January in an outage for approximately 3 days for ice condenser ' inspection and approximately 3 days due to loss of offsite power. The unit returned to service on 01/07/94 at 0057. The unit began to increase-power and held at-30% power due_to secondary chemistry. On 01/07/94 at 0649 the unit held at 49% power nuclear instrumentation adjustments. The unit continued to increase power and held at 90% power on 01/07/94 at 1215 for thermal power output checks. The unit
, returned to full power on 01/07/94 at 1650 and operated at or near~100Y. the remainder of the month, t
E i
e
?
Prepared byr R. A. Williams Telephone: (704)-382-5346 l
,~ . , , _ _ ,_.
, . -. . - = . , -
. - -. ~ - . . . - , .
?: LC '
' a; M('NTHLY ~ REFUEI-ING INFORMATION REOUEST
- 1. Facility name: McGuire, Unit' 2
- 2. Scheduled next refueling shutdown: November 1994 4
- 3. Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION 0F ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. .
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has relsad design and core configuration been reviewed ~by Safety Review-Committee regarding unreviewed safety questions?
- 5. Scheduled date (s) for submitting proposed licensing-action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, un.coviewed design or performance analysis methods, significant. changes in' design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 ,
(b) in the spent fuel pool: 817 '
8.-Present licensed fuel' pool capacity: 1463 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodatedLby '
present'licenced capacity: December 2003
)
DUKE POWER. COMPANY. DATE: February 15, 1994 Name of
Contact:
R. A. Williams Phone: (704)-382-5346- -1 1
'l i
d
- _ - , _ _ . _ , m , _ _ ,
L McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT December 1993
- 1. Personnel Exposure -
The total station liquid release for December has been compared with the Technical Specifications maximum annual '
dose commitment and was less than 10 percent of this limit.
The total station gaseous release for December has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
s 5
-