MONTHYEARML19313A2611977-09-15015 September 1977 Forwards Rept Farley Nuclear Plant Fire Protection Program Reevaluation in Response to 760930 Request.Present Fire Protection Sys Design Has Undergone Extensive NRC Review During OL Review Stage & Found Acceptable Project stage: Other ML20237C6331978-01-25025 January 1978 Forwards NRC Positions & Requests for Clarification Re Plant 770915 Fire Protection Program Reevalution,Per Reg Guide 1.101, Emergency Planning for Nuclear Power Plants Project stage: Approval ML19313A2601978-02-23023 February 1978 Forwards Amend 1 to 770915 Joseph M Farley Nuclear Plant Fire Protection Program Reevaluation Incorporating 771026 Addl Info Project stage: Other ML19313A2591978-03-0707 March 1978 Requests Addl Info Re Proposed Mods to Fire Protection Plan & Schedule for Implementation to Suppl 770915 Submittal Project stage: Other ML19313A2571978-09-0707 September 1978 Submits Request for Addl Info Re 780714 Amend 2 to Jm Farley Nuclear Plant Fire Protection Program Reevaluation. Review & Meeting Requested by 780929 Project stage: RAI ML20064D6111978-10-27027 October 1978 Responds to 780905 Request for Addl Info Re Amend 3 to Fire Protec Prog.Reeval Rept & Forwards Rev Pages & Sched for Implementation of Proposed Mod Project stage: Request ML20064H8151978-12-13013 December 1978 Forwards Info Re Fire Protec Prog Review.Details Review of Cables Passing Thru Component Cooling Water Pump Room.Due to Congestion of Cables,Licensee Plans to Remove B Train Auxiliary Feedwater Pump Room Cooler Cable Project stage: Other ML19289C3151979-01-0303 January 1979 Forwards Amend 4 to Fire Protection Program re-evaluation. Info Includes:Location of Fire Protection Equipment,Fire Area Hazard Analysis & Proposed Mods Project stage: Other ML20244A5871979-03-27027 March 1979 Util Has Reviewed Fire Protection SER & Concurs W/Nrcs Findings & Conclusions;Upon Implementation of Mods, SER Will Be Acceptable Project stage: Other 1978-02-23
[Table View] |
Text
_
A.aosma Nwer Corecary SCC Nortn 18m S:teet Rst Ceca Box 2641 Birmrgnam. Alacama 35291 Tetecnone 205 323 5341 F. L CLAYTON, JR.
S******
AlabamaPower me scurrem eiecircsystem December 13, 1978 Docket Mos. 50-34 5 -364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission f
Washington, D.C.
20555 Attn:
Mr. Albert Schwencer
Dear Mr. Schwencer:
RE: JOSEPH M. FARLEY NUCLEAR PIANT Fire Protection Program Review Alabama Power Company has conducted a detailed review of cables passing through the component cooling water pump room.
Et was determined that only one exists (power cable for auxiliary feedwater pump room cooler) where redun-dant cables for hot shutdown equipment run through the area with less than twenty foot separation that do not terminate in the room. While the subject cables do not carry power to the auxiliary feedwater pumps they are required for long term cooling of the pump rooms.
Due to the congestion of cables in this area, Alabama Power Company plans to remove the "B" train auxiliary feedwater pump room cooler cable from the room as discussed with Mr. Ed Reeves by phone on December 12, 1978.
It is our understanding that no other outstanding items exist in review of our fire protection program at Farley Nuclear Plant Units 1 and 2.
1 If you have questions, please advise.
Yours very truly, F. L. Clayton, Jr.