05000366/LER-1982-130, Forwards LER 82-130/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-130/03L-0
ML20064H806
Person / Time
Site: Hatch 
Issue date: 12/23/1982
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064H809 List:
References
PM-82-2420, NUDOCS 8301170428
Download: ML20064H806 (1)


LER-1982-130, Forwards LER 82-130/03L-0
Event date:
Report date:
3661982130R00 - NRC Website

text

r

,[.

Georgia Power Company Post Office Box 439 Baxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 i

Georgia Pbwer Edwin 1. Hatch Nuclear Plant

_]j4,

-: 3 December 23, 1982 PM-82-2420 PLANT E.

I.

IIATCH Licensee Event Report Docket No. 50-366 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II, Suite 3100 101 Mcrietta Street Atlanta, Zcc-a 30303 Attantion:

Mr. James P.

O'Reilly Pursuant to Section 6.9.1.9.d. of Hatch Unit Two Technical Specifications, please find attached Reportable Occurrence Report No. 50-366/1982-130.

i H. C. Nix (

General Manager HCN/SBT/abb xc:

R. J.

Kelly G.

F.

Head J.

T.

Beckham, Jr.

P.

D.

Rice

[

K. M. Gillespie S.

B. Tipps R.

D.

Baker Control Room Document Control gilblCLiL CO!"i

~

8301170428 821223 gg A % -

PDR ADOCK 05000366 g

PDR