ML20064H835
| ML20064H835 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 01/07/1983 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8301170437 | |
| Download: ML20064H835 (2) | |
Text
,
. - - ~
n!
o '
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 1
400 Chestnut Street Tower II J
January 7,1983 BLRD-50-438/83-02 g
^
f; U.S. Nuclear Regulatory Commission O
Region II S
i Attn:
Mr. James P. O'Reilly, Regional Administrator 7
i 101 Marietta Street, Suite 3100
.T j
Atlanta, Georgia 30303 g
n
Dear Mr. O'Reilly:
f
~
BELLEFONTE NUCLEAR PLANT UNIT 1 - FAILURE OF AIR COMPRESSOR MOTOR -
INGERSOLL RAND - BLRD-50-438/83 FIRST INTERIM REPORT Tho subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on December 9,1982 in accordance with 10 CFR 50.55(e) as NCR 2102. Enclosed is our first interim report. We expect to submit our next report on or about June 1, 1983 If you have any questions concerning this matter, please get in touch with i
R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY l
M i
L. M. Mills, Manager l
Nuclear Licensing i
i Enclosure i
cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
i Yg9,(O r
1 Of t
[I
[M
)
8301170437 830107 PDR ADOCK 05000438 S
PDR An Ecual Oconrtumty E molovn i
.a.
a ENCLOSURE BELLEFONTE NUCLEAR PLANT UNIT 1 FAILURE OF AIR COMPRESSOR MOTOR - INGERSOLL RAND NCR 2102 BLRD-50-438/83-02 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficiency During performance of a functional test on stationary air compressor motor 1RJ-EMOT-002-B, the motor failed during an attempted restart.
This is the second instance of this type of failure on this type and size motor (nonconformance report 1942).
Bellefonte is the only TVA nuclear plant to use this size motor and system configuration.
Interim Progress The stator of the motor is to be returned to the vendor for rework.
TVA's Division of Engineering Design has been requested to evaluate the failure and determine possible cause and actions required to prevent recurrence.