Forwards 30-day Interim Rept Re 781122 Possible Weld Burn Thru & Resulting Splatter on Interior Surfaces of High Density Spent Fuel Racks.Engr Eval to Determine If a Problem Does Exist Is Still in Progress
ML20064H828
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/21/1978
From: Brown S
Public Service Enterprise Group
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7812270194
Download: ML20064H828 (3)


Text

~

1 December 21, 1973

  • r. Janas P. O'2ailly, 31rtetor

$1 rial No.

656A Offf:e of Inspecticn 4 Enfercement PSE&C/CGC/mac: wang U. S.1uclear 3egulatnry Ccdssion 11gi:n II e

's M1 arietta Street, Sui a 1100

/

Occtet No. 50-339

)

,1tlanta, Gec gia 30203

~

% :P."r. O'O.eilly:

'v '

n 1ccor ance with the crovisiens of 10CFR30.55(3), '!RC legion II.vas notifiad en November 22,10'3 that cassit'a '* eld burn throun5 and tael re:Jiting Islattar 1xists en inte-icr surfic?s of :he High Density Spent Fuel hc':s.

Our engineering evaluaticn to determine if a proalem does exist and if it is of ootential safety significance is still in nregress. This 30-day'rtport, therefera, shall ce considered an intarim re;crt. A final recort dec:menting the results of our investigation and the corrective 1ction, if any, wi!1 folicw ss soon as sur engireerleg evaluation is cor.oieta.

Very truly yourt, Sa'n C. 3rown, Jr.

V'ce President - Power Station Engineering and Construction

r. Jonn G. Davis, Acting Director

c:

^ffice of Ins;ection 3 Enforcement

> P.r' Hvold 1. Dent:n, Director Office of Nuc ?ar Reactor 13;ula i:n 7812276194 t

s S