Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-93-0231, Responds to NRC Re Violations Noted in Insp Rept 50-285/93-12 on 930624-0716.Corrective Actions:Revised Procedure NOD-QP-36 + (ML20056G964)
- IR 05000245/1993022 + (ML20056G965)
- ML20056G966 + (ML20056G966)
- ML20056G967 + (ML20056G967)
- ML20056G968 + (ML20056G968)
- ML20056G970 + (ML20056G970)
- 05000254/LER-1993-013-04, :on 930729,identified Deviation from TS & Reg Guide 1.52 Requirements for Methyl Iodide Testing of Charcoal Sample Canisters.Caused by Failure to Implement Proper Canister Testing.Canisters Tested by Nucon + (ML20056G971)
- ML20056G972 + (ML20056G972)
- ML20056G973 + (ML20056G973)
- ML20056G974 + (ML20056G974)
- ML20056G975 + (ML20056G975)
- ML20056G976 + (ML20056G976)
- IR 05000317/1993023 + (ML20056G978)
- ML20056G979 + (ML20056G979)
- ML20056G980 + (ML20056G980)
- IR 05000255/1993018 + (ML20056G981)
- ML20056G982 + (ML20056G982)
- ML20056G983 + (ML20056G983)
- IR 05000272/1991099 + (ML20056G984)
- PNO-III-93-049A, provides Update on Degraded Neutron Absorbing Plates in Spent Fuel Pool at Plant.Licensee Determined That Sufficient Subcritical Margin Maintained in Spent Fuel Pool.State of Mi Informed + (ML20056G985)
- ML20056G986 + (ML20056G986)
- ML20056G988 + (ML20056G988)
- ML20056G990 + (ML20056G990)
- ML20056G991 + (ML20056G991)
- ML20056G992 + (ML20056G992)
- ML20056G995 + (ML20056G995)
- ML20056G996 + (ML20056G996)
- ML20056G998 + (ML20056G998)
- ML20056H000 + (ML20056H000)
- BSEP-93-0141, Informs NRC of Change in Simulator Modification Schedule Provided in Certification Package for Plant Referenced Simulator + (ML20056H001)
- ML20056H002 + (ML20056H002)
- ML20056H003 + (ML20056H003)
- ML20056H004 + (ML20056H004)
- ML20056H006 + (ML20056H006)
- ML20056H007 + (ML20056H007)
- NRC-93-0103, Responds to NRC Re Inspector Followup Item in Insp Rept 50-341/93-10.Corrective Actions:Plant Mod Scope Will Be Evaluated,Preventive Maint Group Will Generate Flowchart & Entire Mod Process Being Reengineered + (ML20056H008)
- ML20056H009 + (ML20056H009)
- ML20056H011 + (ML20056H011)
- ML20056H012 + (ML20056H012)
- ML20056H013 + (ML20056H013)
- ML20056H014 + (ML20056H014)
- ML20056H017 + (ML20056H017)
- ML20056H019 + (ML20056H019)
- ML20056H021 + (ML20056H021)
- ML20056H022 + (ML20056H022)
- ML20056H023 + (ML20056H023)
- ML20056H025 + (ML20056H025)
- ML20056H027 + (ML20056H027)
- ML20056H028 + (ML20056H028)
- ML20056H029 + (ML20056H029)
- ML20056H030 + (ML20056H030)