Notice of Violation from Insp on 930627-0807.Violation Noted:Alternate Shutdown panel,CP-82-1,modified by Addition of Plexiglass Panel That Prevented Operation of Equipment Controls
ML20056G970
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/27/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20056G969 List:
References
50-271-93-14, NUDOCS 9309080016
Download: ML20056G970 (1)


Text

. __ ___ _ _ _ _ _ _ . _ _ _ _ _ _ . .__.

F ENCLOSURE 1 NOTICE OF VIOLATION Vermont Yankee Nucicar Power Corporation Docket No. 50-271 j Vermont Yankee Nuclear Power Station License No. DPR-28 During an NRC inspection conducted from June 27 to August 7,1993, a violation of.NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure '

for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992), the violation is listed below.  ;

r i

Vermont Yankee Technical Specification 6.5 requires that procedures involving safety  :

shall be adhered to. Plant administrative Procedures AP 0020, Revision 15, " Temporary [

Modifications" and AP 6024, Revision 8, " Plant Housekeeping," were written pursuant ,

to Technical Specification 6.5. Procedure AP 0020 requires, in part, that evaluations of  ;

temporary modifications to plant equipment be evaluated. Procedure AP 6024 requires, in part, that good housekeeping practices be maintained.

Contrary to the above, during July 22-23,1993, alternate shutdown panel, CP-82-1, was modified by the addition of a plexiglass panel that prevented operation of equipment  !

controls. No evaluation of this condition was performed. Additionally, on July 27, ,

1993, good housekeeping practices did not exist in the "B" emergency core cooling q system corner room of the reactor building in that materials were placed on the residual heat removal pump motor and piping, as well as debris on the floor near sump pumps.

l These instances constitute a Severity Level IV violation (Supplement I). j

! Pursuant to the provisions of 10 CFR 2.201, Vermont Yankee is hereby required to submit a written statement of explanation to the U.S. Nuclear Regulatory Commission, A'ITN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will

be achieved. If an adequate reply is not received within the time specified in this Notice, an i order may be issued to show cause why the license should not be modified, suspended, or
revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending this response time.

.: l Dated at King of Prussia. Pennsylvania i

this 27th day of Auaust ,1993 9309000016 930827 PDR ADOCK 05000271 a N OFFICIAL RECORD COPY l