Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20056F543 + (ML20056F543)
- ML20056F544 + (ML20056F544)
- ML20056F545 + (ML20056F545)
- ML20056F546 + (ML20056F546)
- ML20056F548 + (ML20056F548)
- ML20056F549 + (ML20056F549)
- ML20056F550 + (ML20056F550)
- ML20056F552 + (ML20056F552)
- ML20056F553 + (ML20056F553)
- ML20056F555 + (ML20056F555)
- ML20056F557 + (ML20056F557)
- ML20056F561 + (ML20056F561)
- ML20056F564 + (ML20056F564)
- ML20056F565 + (ML20056F565)
- ML20056F566 + (ML20056F566)
- ML20056F568 + (ML20056F568)
- ML20056F569 + (ML20056F569)
- ML20056F570 + (ML20056F570)
- JPN-93-061, Proposed Tech Specs Requesting Extension to Surveillance Interval for Turbine Control Valve Fast Closure Pressure Switch + (ML20056F571)
- ML20056F572 + (ML20056F572)
- ML20056F577 + (ML20056F577)
- ST-HL-AE-4547, Responds to Violations Noted in Insp Repts 50-498/93-01 & 50-499/93-01.Corrective Actions:Station Mgt Emphasized Need for Control Board Awareness in Meetings W/All Active Shift Supervisors + (ML20056F579)
- ML20056F581 + (ML20056F581)
- ML20056F584 + (ML20056F584)
- RBG-38910, Responds to Violations Noted in Insp Rept 50-458/93-05. Corrective Actions:Review of Technical Section Procedures Will Be Performed to Identify Procedures That May Be Required After Maint + (ML20056F586)
- 05000458/LER-1993-015, :on 930723,discovered Time Response Testing of Isolation Instrumentation for RWCU & RCIC Sys Not Performed at Intervals Required by Tss.Caused by Scheduling Error & Misinterpretation of Ts.Schedule Revised + (ML20056F594)
- ML20056F595 + (ML20056F595)
- ML20056F596 + (ML20056F596)
- ML20056F597 + (ML20056F597)
- L-93-178, Requests Exemption from Certain Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities ...Against Radiological Sabotage, for Units 1 & 2 + (ML20056F600)
- ML20056F601 + (ML20056F601)
- ML20056F603 + (ML20056F603)
- 05000293/LER-1993-020, :on 930726,plant Personnel Found Anticipated Transient Without Scram Div 1 Pressure Transmitters Valved Out of Svc.Caused by Lack of Procedural Clarity.Personnel Revised Procedure + (ML20056F606)
- ML20056F608 + (ML20056F608)
- 05000293/LER-1993-019, :on 930722,automatic Actuation of RHR Sys Portion of PCIS Occurred.Caused by Momentary Pressure Transient That Actuated Protective High Pressure Switches. Calibr Performed + (ML20056F612)
- JPN-93-060, Forwards Proprietary Rev 1 to NEDC-32016P-1, Power Uprate Safety Analysis for Ja FitzPatrick Nuclear Power Plant, Per 920605 Proposed Changes to TS Re Power Uprate.Safety Analysis Withheld,Per 10CFR2.790 + (ML20056F613)
- IR 05000348/1993005 + (ML20056F614)
- ML20056F632 + (ML20056F632)
- ML20056F644 + (ML20056F644)
- ML20056F645 + (ML20056F645)
- ML20056F657 + (ML20056F657)
- ML20056F661 + (ML20056F661)
- ML20056F669 + (ML20056F669)
- ML20056F673 + (ML20056F673)
- ML20056F680 + (ML20056F680)
- HL-3428, Plant Ei Hatch,Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 1993 + (ML20056F685)
- ML20056F686 + (ML20056F686)
- ML20056F695 + (ML20056F695)
- BSEP-93-0134, Requests Relief for Temporary non-code Repair to SWS for Bsep,Unit 1,per GL 90-05.Alternate Requirements Provided in Engineering Evaluation Rept 93-0502, Operability Assessment of Pinhole Leak in 6 Vital SW Header + (ML20056F696)
- ML20056F699 + (ML20056F699)
- 0CAN089305, Forwards Comments on GL 86-10,Suppl 1, Fire Endurance Acceptance Criteria for Fire Barrier Sys Used to Separate Redundant Safe Shutdown Trains within Same Fire Area + (ML20056F705)