Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20056E104 + (ML20056E104)
- ML20056E106 + (ML20056E106)
- ML20056E107 + (ML20056E107)
- ML20056E108 + (ML20056E108)
- ML20056E109 + (ML20056E109)
- ML20056E110 + (ML20056E110)
- ML20056E111 + (ML20056E111)
- ML20056E112 + (ML20056E112)
- ML20056E113 + (ML20056E113)
- ML20056E114 + (ML20056E114)
- ML20056E116 + (ML20056E116)
- ML20056E117 + (ML20056E117)
- ML20056E118 + (ML20056E118)
- ML20056E120 + (ML20056E120)
- HL-3425, Forwards Results of Review of Plant Neutron Monitoring Instrumentation Against Criteria of NEDO-31558, Position on NRC RG 1.97,Rev 3 Requirements for Post-Accident Neutron Monitoring Sys + (ML20056E121)
- ML20056E123 + (ML20056E123)
- ML20056E126 + (ML20056E126)
- ML20056E128 + (ML20056E128)
- 05000293/LER-1993-017, :on 930721,HPCI Sys Declared Inoperable Due to Turbine Steam Supply Valves Closure During Surveillance Testing.Hpci Logic Test Procedures Reviewed.Procedure 8.M.2-1.5.10 Being Revised + (ML20056E130)
- ML20056E133 + (ML20056E133)
- ML20056E136 + (ML20056E136)
- PMNS20200166, Shine Medical Technologies, LLC Public Meeting on Operating License Application + (ML20056E142)
- 1CAN089304, Provides Licensee Evaluation of Concern Re Manual Use of Electromatic Relief Valve for Transient Mitigation in Response to 930613 Feedwater Transient.Addl Details of Transient Documented in Insp Rept 50-313/93-06 + (ML20056E144)
- 05000373/LER-1993-013-02, :on 930727,received Partial Group 7 Isolation. Caused by Failure of Coil in Relay 1B21H-K78.Work Request L23678 Written to Troubleshoot Group 7 Isolation.Subj Relay Problem Identified & Relay Replaced + (ML20056E145)
- ML20056E146 + (ML20056E146)
- ML20056E148 + (ML20056E148)
- ML20056E150 + (ML20056E150)
- ML20056E151 + (ML20056E151)
- ML20056E152 + (ML20056E152)
- ML20056E155 + (ML20056E155)
- ML20056E156 + (ML20056E156)
- ML20056E159 + (ML20056E159)
- ML20056E160 + (ML20056E160)
- ML20056E161 + (ML20056E161)
- ML20056E162 + (ML20056E162)
- ML20056E165 + (ML20056E165)
- ML20056E166 + (ML20056E166)
- ML20056E167 + (ML20056E167)
- ML20056E168 + (ML20056E168)
- ML20056E169 + (ML20056E169)
- ML20056E170 + (ML20056E170)
- BECO-93-102, Forwards Final Pilgrim Nuclear Power Station Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for 930519 + (ML20056E172)
- 3F0893-09, Proposes to Change Conditions for Entry Into Site Area Emergency Under EAL for Natural Phenomena,Hurricane Warning, as Outlined in Encl,As Result of Review of Hurricane Preparedness + (ML20056E174)
- ET-NRC-93-3944, Forwards Proprietary Drawings,Providing Details of Steam Distributor Assembly Being Used in AP600 Core Makeup Tank Test Facility.Drawings Withheld (Ref 10CFR2.790)). Proprietary Portion of Document Sent to Westinghouse + (ML20056E176)
- ML20056E179 + (ML20056E179)
- ML20056E180 + (ML20056E180)
- ML20056E181 + (ML20056E181)
- ML20056E182 + (ML20056E182)
- ML20056E184 + (ML20056E184)
- ML20056E185 + (ML20056E185)
- ML20056E186 + (ML20056E186)