ML20056E112
| ML20056E112 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/12/1993 |
| From: | Storz L CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 2166, NUDOCS 9308200032 | |
| Download: ML20056E112 (5) | |
Text
.
s.
gi;'N summer l
t i
Louis F. Sforz 300 Madison Avenue l
Vice President - Nuclear Toledo, OH 43652-0001 l
Davis-Besse (419)249-2300 l
i i
i Docket Number 50-346 License Number NPF-3 l
}
Serial Number 2166 August 12, 1993 l
t t
United States Nuclear Regulatory Commission Document Control Desk I
Washington, D. C.
20555 Subj ect:
Semiannual Fitness-For-Duty Report January - June 1993 Gentlemen:
Pursuant to 10 CFR 26'71(d) " Record Keeping Requirements", Toledo Edison hereby submits its Semiannual Fitness-For-Duty (FFD) report for.
the period of January - June 1993 for Davis-Besse Nuclear Power Station, Unit 1.
I provides Toledo Edison's FFD Progrard Performance Data.
l The data form is an industry standard developed by Nuclear Management i
and Resources Council to provide the information required by 10 CFR. 26.71(d). Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD results, presumptive positives,
)
and a list of FFD event reports submitted by Toledo Edison.
If you have any questions, please contact Mr. Dale R. Vuokko, Manager - Regulatory Affairs (A), at (419) 249-2366.
Very truly yours, N
GAB /dle l
l-attachments J. B. Hopkins, NRC/NRR DB-1 Senior Project Manager cc:
J. B. Martin, Regional Administrator, NRC Region III j
S. Stasek, NRC Region III, DB-1 Senior Rei,ident Inspector i
Utility Radiological Safety Board 1
l 1 O ft f A Ol d J u) e d Operating Componies:
I Cleveland Elecincilluminotmg (l
TolecoEdison -
9308200032 930812 n
gDR ADDCK 05000346 i
y!
l Docket Number 50-346 License Number NPF-3 Serial Number 2166 l
Toledo Edison's Fitness-For-Duty Report January - June 1993 l
l 1
t I
i i
i l
. Docket Number 50-346 License Number NPF-3 Serial Number 216A
' Attachment 1
~
Pese 1 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26
{
Toledo Edison June 30, 1993 l
~
cesseny s Monow Enene i
Davis-Besse Loemson D. R. Wuokko (419) 249-2366 conmet w Phone (mmee eres cose)
Cutoff s: ScreerVConfirrnation (rpm!)
O Appendix A to 10CFR 26 P
Marijuana 50 / 15 Amphetamines 1000 / 500
/
Cocaine 300 / 150 Phencyclidine 25 / 25
/
I 4
I Opiates 300 / 300 Alcohol (% BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number witt Unescorted Access 1.183 532 Categories Tested Positive Tested Positive Tested Positive Pre-Access 27 0
944 12/16 l
I
[
Post accioem 18 0
2 0
9 Observed behavior 2
0 42 15/15 Random 711 0
207 1/1 Follow-up 14 0
18
'i O
Other 93 1f1 g
o Total 866 1/1 1213 28/32 REV.1/92 (a
s'R*CF
% ; ;!. S a Creakdown of Confirmed Positive Tests for Specific Substances
~ e *_ E a
!! z
- 2 l Amphe-Phency-Flefusal n 4g g nc2c Marijuana Cocame Odates
., mines clidine
- 0cohol to Tost 1
2 3
4 5
-aga w"u Ocensee Employees
-2o 0
0 0
0 0
1 0
$Qa e
e-Long Tenn Contractors we Short-Term Contractors 15 1
0 0
0 14 4
A
- Total
^
15 1._
0 0
15 4
l 33 G
G 4
e a
e
,e 4.
Docket Number 50-346
- ^
License Number NPF-3 j
l Serial Number 2166
.Attac.hment 2 1
TOLEDO EDISON'S MANAGEMENT ACTIONS I
REls6 TING TO FITNESS-FOR-DUTY l
t Toledo Edison Contractor l
Personnel Personnel-l Referred to EAP 1
0 l
l Hanagement Sanctions 1
32 t
l i
f i
l Toledo Edison does not perform onsite initial drug screening test.
Therefore, no management actions on unconfirmed presumptive positive result from drug testing.
t I
l TOLEDO EDISON'S f
FITNESS-FOR-DUTY l
RETORTS l
l There were no Fitness-For-Duty reports submitted during this reporting l
period (Jantury - June 1993)
I