ML20056E112

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Fitness-For-Duty Rept for Jan-June 1993 for Unit 1
ML20056E112
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/12/1993
From: Storz L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2166, NUDOCS 9308200032
Download: ML20056E112 (5)


Text

.

s.

gi;'N summer l

t i

Louis F. Sforz 300 Madison Avenue l

Vice President - Nuclear Toledo, OH 43652-0001 l

Davis-Besse (419)249-2300 l

i i

i Docket Number 50-346 License Number NPF-3 l

}

Serial Number 2166 August 12, 1993 l

t t

United States Nuclear Regulatory Commission Document Control Desk I

Washington, D. C.

20555 Subj ect:

Semiannual Fitness-For-Duty Report January - June 1993 Gentlemen:

Pursuant to 10 CFR 26'71(d) " Record Keeping Requirements", Toledo Edison hereby submits its Semiannual Fitness-For-Duty (FFD) report for.

the period of January - June 1993 for Davis-Besse Nuclear Power Station, Unit 1.

I provides Toledo Edison's FFD Progrard Performance Data.

l The data form is an industry standard developed by Nuclear Management i

and Resources Council to provide the information required by 10 CFR. 26.71(d). Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD results, presumptive positives,

)

and a list of FFD event reports submitted by Toledo Edison.

If you have any questions, please contact Mr. Dale R. Vuokko, Manager - Regulatory Affairs (A), at (419) 249-2366.

Very truly yours, N

GAB /dle l

l-attachments J. B. Hopkins, NRC/NRR DB-1 Senior Project Manager cc:

J. B. Martin, Regional Administrator, NRC Region III j

S. Stasek, NRC Region III, DB-1 Senior Rei,ident Inspector i

Utility Radiological Safety Board 1

l 1 O ft f A Ol d J u) e d Operating Componies:

I Cleveland Elecincilluminotmg (l

TolecoEdison -

9308200032 930812 n

gDR ADDCK 05000346 i

y!

PDR

l Docket Number 50-346 License Number NPF-3 Serial Number 2166 l

Toledo Edison's Fitness-For-Duty Report January - June 1993 l

l 1

t I

i i

i l

. Docket Number 50-346 License Number NPF-3 Serial Number 216A

' Attachment 1

~

Pese 1 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26

{

Toledo Edison June 30, 1993 l

~

cesseny s Monow Enene i

Davis-Besse Loemson D. R. Wuokko (419) 249-2366 conmet w Phone (mmee eres cose)

Cutoff s: ScreerVConfirrnation (rpm!)

O Appendix A to 10CFR 26 P

Marijuana 50 / 15 Amphetamines 1000 / 500

/

Cocaine 300 / 150 Phencyclidine 25 / 25

/

I 4

I Opiates 300 / 300 Alcohol (% BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number witt Unescorted Access 1.183 532 Categories Tested Positive Tested Positive Tested Positive Pre-Access 27 0

944 12/16 l

I

[

Post accioem 18 0

2 0

9 Observed behavior 2

0 42 15/15 Random 711 0

207 1/1 Follow-up 14 0

18

'i O

Other 93 1f1 g

o Total 866 1/1 1213 28/32 REV.1/92 (a

s'R*CF

% ; ;!. S a Creakdown of Confirmed Positive Tests for Specific Substances

~ e *_ E a

!! z

  • 2 l Amphe-Phency-Flefusal n 4g g nc2c Marijuana Cocame Odates

., mines clidine

  1. 0cohol to Tost 1

2 3

4 5

-aga w"u Ocensee Employees

-2o 0

0 0

0 0

1 0

$Qa e

e-Long Tenn Contractors we Short-Term Contractors 15 1

0 0

0 14 4

A

- Total

^

15 1._

0 0

15 4

l 33 G

G 4

e a

e

,e 4.

Docket Number 50-346

  • ^

License Number NPF-3 j

l Serial Number 2166

.Attac.hment 2 1

TOLEDO EDISON'S MANAGEMENT ACTIONS I

REls6 TING TO FITNESS-FOR-DUTY l

t Toledo Edison Contractor l

Personnel Personnel-l Referred to EAP 1

0 l

l Hanagement Sanctions 1

32 t

l i

f i

l Toledo Edison does not perform onsite initial drug screening test.

Therefore, no management actions on unconfirmed presumptive positive result from drug testing.

t I

l TOLEDO EDISON'S f

FITNESS-FOR-DUTY l

RETORTS l

l There were no Fitness-For-Duty reports submitted during this reporting l

period (Jantury - June 1993)

I