- ML20052E202 + (ML20052E202)
- ML20052E205 + (ML20052E205)
- ML20052E206 + (ML20052E206)
- ML20052E207 + (ML20052E207)
- 05000317/LER-1982-019, Forwards LER 82-019/01T-0 + (ML20052E209)
- 05000219/LER-1982-017, Forwards LER 82-017/03L-0.Detailed Event Analysis Encl + (ML20052E211)
- 05000317/LER-1982-019-01, /01T-0:on 820415,hydrogen Sampling Manual Stop Valves Were Discovered Shut Rendering Hydrogen Analyzer Inoperable.Caused by Incomplete Operating Instructions & Tagging Procedure.Valves Opened & Tags Attached + (ML20052E214)
- 05000219/LER-1982-017-03, /03L-0:on 820325,normal Auxiliary Power Bus 1C Relay Failed Totally & Svc Water Pump Trip Time Delay Relay SK8A Failed to Operate within Tech Spec Limits.Power Bus Failure Caused by Normal End of Life + (ML20052E216)
- ML20052E219 + (ML20052E219)
- ML20052E220 + (ML20052E220)
- A02113, Forwards Isolation Condenser Sys Water Hammer Events, in Response to NRC Questions Re 810810 Transient & Millstone Point 1 Isolation Condenser & Shutdown Cooling Sys Piping Cracks + (ML20052E222)
- ML20052E226 + (ML20052E226)
- IR 05000244/1982003 + (ML20052E228)
- ML20052E231 + (ML20052E231)
- ML20052E232 + (ML20052E232)
- ML20052E233 + (ML20052E233)
- ML20052E234 + (ML20052E234)
- ML20052E235 + (ML20052E235)
- ML20052E236 + (ML20052E236)
- ML20052E237 + (ML20052E237)
- ML20052E238 + (ML20052E238)
- ML20052E241 + (ML20052E241)
- ML20052E243 + (ML20052E243)
- ML20052E245 + (ML20052E245)
- ML20052E246 + (ML20052E246)
- ML20052E247 + (ML20052E247)
- ML20052E248 + (ML20052E248)
- PLA-1073, Final Deficiency Rept Re Design of Emergency Core Cooling Pump Circuit Breakers,Initially Reported 810921.Mod to Eliminate Sneak Circuits Issued by Bechtel.Also Reportable Per Part 21 + (ML20052E249)
- ML20052E252 + (ML20052E252)
- ML20052E255 + (ML20052E255)
- ML20052E256 + (ML20052E256)
- ML20052E257 + (ML20052E257)
- ML20052E259 + (ML20052E259)
- ML20052E260 + (ML20052E260)
- B10490, Final Significant Deficiency Rept Re Potential for Loss of All Auxiliary Feedwater Following Small Steam Line Rupture Referenced in .Evaluation Determined That Deficiency Does Not Exist + (ML20052E262)
- ML20052E263 + (ML20052E263)
- ML20052E264 + (ML20052E264)
- ML20052E266 + (ML20052E266)
- ML20052E267 + (ML20052E267)
- ML20052E268 + (ML20052E268)
- ML20052E269 + (ML20052E269)
- 05000344/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl + (ML20052E270)
- 05000318/LER-1982-016, Forwards LER 82-016/03L-0 + (ML20052E272)
- 05000344/LER-1982-005-03, /03L-0:on 820331,failure to Perform Component Cooling Water Valve Cycling at Required Frequency Discovered.Caused by Personnel Error.Schedule Corrected + (ML20052E274)
- ML20052E275 + (ML20052E275)
- 05000318/LER-1982-016-03, /03L-0:on 820402,during Normal Power Operation, Plant Computer Failed,Resulting in Loss of CEA Pulse Counting Sys & Incore Detection Sys.Apparently Caused by Intermittent Signal.Computer Restarted by Bootstrapping + (ML20052E276)
- ML20052E277 + (ML20052E277)
- 05000333/LER-1982-017, Forwards LER 82-017/03L-0 + (ML20052E278)
- ML20052E280 + (ML20052E280)
- 05000333/LER-1982-017-03, /03L-0:on 820402,MSIV 10% Closure Position Switches on Two Valves Did Not Trip When Tested.Caused by Mechanical Drift of Valve Position Switch Operating Cams. Adjustment Made + (ML20052E281)