Responds to NRC Re Violations Noted in IE Insp Rept 50-244/82-03.Corrective Actions:Revised Procedure HP-7.6, Tagging of Instruments Requiring Calibr or Maint
ML20052E233
Person / Time
Site: Ginna 
Issue date: 04/16/1982
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20052E230 List:
References
NUDOCS 8205100218
Download: ML20052E233 (5)


Text

..

.a Re 3 :c i

-,m y "'"

1:

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 JOHN F; MME H TFLtencNE w. er.u s n, aar a cons via S 46-2 700 April 16, 1982 Mr. Ronald C. Haynes, Regional Administrator U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

I & E Inspection Report 82-03 Notice of Violations Measuring and Test Equipment Control R.

E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. Haynes:

In accordance with the above subject which stated:

During the inspection conducted on January 1, 1982 through February 28, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violations were identified.

A.

10 CFR 50.55a(g)(4) requires, in part, that components which are classified as ASME Code Class 1, 2, or 3 meet the require-l ments set forth in Section XI of the ASME Boiler and Pressure Vessel Code and Addenda.

Ginna Station Quality Assurance Manual, Appendix C, dated February 1,

1981, paragraphs 2.1 through 3.2, state that the Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of the 1977 Ed ition l

of Section XI of the ASME Boiler and Pressure Vessel Code through the Summer 1978 Addenda, and further, lists the pumps which are tested in accordance with Article IWP of Section XI.

Article IWP-6230 requires that the inservice test program include a reference value, alert limit and required action limit for individual pump bearing temperatures.

Contrary to the above, as of January 7, 1982, the Inservice Pump Test Program did not include a reference value, alert 820510gB 4

O PDR A PDR i

i G

i ROCHESTER CA$ AND ELECTRIC CORP.

SHEET NO.

2 DATE April 16, 1982 Ronald C. Haynes To limit, or required action limit for bearing temperatures associated with ASME Class 2 or 3 pumps listed in paragraph 3.2 of the Ginna Station Quality Assurance Manual, Appendix C.

B.

10 CPR 50, Anpendix B, Criterion XfI, states, " Measures shall be established to assore that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within necessary limits."

Periodic Test (PT)-31, Safeguard Pump Bearing Temperature Check, Revision 3(4), October 20, 1980 (May 15, 1981),

step 4.3, requires that the meter used for bearing temperature measurement be checked for accuracy over the temperature range of interest at intervals not to exceed 18 months.

Contrary to the above, the following instances of failure to properly calibrate measuring and test equipment were noted.

The pyrometer used on March 2 and 4, 1981 to measure the bearing temperatures associated with the three safety injection pumps was calibrated over the limited temperature range of 7 5-12 0 F,

where the indicated bearing tempera tures ranged from 55-157F.

Calibration records were not available for the d ig i tal thermometer used on J anuary 18, 1982 to measure the outboard bearing temperatures associated with the two containment spray pumps.

C.

10 CPR 50, Appendix B,

Criterion XII, states, " Measures shall be established to assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within necessary limits."

Ginna S tation Quality Assurance Manual,Section XII, Control of Measuring and Test Equipment, Revision 4,

June 15, 1980, paragraph 3.4, requires that the calibration frequency for measuring and te s t equipment be adjusted when instrument history indicates the need.

Contrary to the above, as of January 18, 1982, the l

ROCHESTER GAS AND ELECTRIC CORP.

SMEET NO.

3 April 16, 1982 DATE Ronald C. Haynes To calibration frequency for two neutron survey instruments had not been reduced, although data from the past three annual calibrations indicated the need for substantial adjustments prior to returning the meters to service.

the following is submitted in response.

In response to Item A:

Although the Ginna Station procedure for performing the bearing temperature requirement (PT-31) does not have specified limits for Alert Range and Requirad Action Range, there is a limit of 1600F which would require termination of the test.

Since this is an ISI requirement, terminating the test would automatically put us into an action statement requiring corrective action.

Table IWP-3100-2 does not tabulate specific criteria, however it does identify a foot note for each column of the table which states "Tb, shall be within the limits specified by the Owner in the pump record."

This was inte rpre ted similarly to the quantity for inlet pressure (Pi), which can vary depending on plant status or pressure source, since bearing temperatures can vary with the cooling medium (service water), ambient conditions and type of measuring instrument used.

Ex ten sive ef forts have been expended since 1976 to meet the intent of this requirement, including three different generations of test equipment, communications with other plants, communications with pump vendors and revised procedures to improve our methods.

All of this ef fort was made even though the general feeling is that this is not a useful measurement.

A bearing temperature problem would most likely occur at a rapid rate, which would not be detected by changes measured at one year intervals.

The consensus of opinion from various plants which responded to our inquiry reg a rd ing this specific item was that bearing vibration l

measurements are a much more reliable indicator of bearing problems.

Vendor manuals were also reviewed as a result of this finding and the only mention of temperature relative to bearings was for hearing lube oil limits.

One vendor (Worthington) recommended maintaining lube oil temperature between 1000F and 1500F, preferably above 1200F.

Another vender, (Tngerroll Rand) specified lube oil to be maintained between o00F l

and 1650F.

Based on all of this information it is our intention to

F ROCHESTER GA5 AND ELECTRIC CORP.

SKEET NO.

4 April 16, 1982 04TE TO Ronald C. Haynes continue using 160oF as our limit before corrective action will be taken.

Our procedure data sheet will be changed to add a required action statement that if stabilized temp-eratures can not be attained in accordance with IWP require-monts, less than or equal to 1600F, corrective action will be taken.

This statement is intended to address the " Acceptable Range", " Alert Range" and " Required Action Range" shown in the IWP Table 3100-2.

Reference values will not be listed.

In response to Item B:

Since the start of the ISI Pump and Valve Program there have been numerous problems relative to obtaining and main-taining qualified instruments for the bearing temperature requirement.

We are presently on our third generation of instruments for performing this annual check due to concerns about accuracy, repeatability and methods of cali-bration.

As a result of the most recent findings, including the ones addressed in this inspection report, we have obtained an Omega portable thermometer with thermistor probes.

This method should eliminate many past problems encountered with previous instruments which were used.

To correct the problems with calibration, a new procedure will be developed for the instrument with an attached data sheet which specifies the range of interest.

The instrument will be sent to an off-site RG&E standards lab for calibration.

Since calibration records could not be provided for the instrument used to test the two Containment Spray Pumps on January 18, 1982, the test will be re-performed using the new Omega thermometer which has been calibrated in the range of interest.

This will be nerformed prior to plant start up.

In response to Item C:-

As stated in the finding the two neutron survey instruments in question were found to be significantly out of calibration on three consecutive calibrations.

Although there is some question as to whether some of these calibrations were

" routine" or performed following instrument maintenance, the current records cannot prove this.

These instruments have been sent out to the NBS for calibration so they will be recalibrated orior to being used again this year.

We 4

will reduce the calibration frequency to six months for a minimum of two calibrations to determine if problems

ROCHESTER GAS AND ELECTRIC CORP.

SHEET NO.

5 April 16, 1982 DATE Ronald C. Haynes TO are developing with these instruments.

To preclude recur-rence of this item, the following changes have been submitted to procedure HP-7.6.

" Tagging of Instruments Requiring Calibration or Maintenance".

1.

Acceptance criteria have included which either meet or are more conservative than ANSI N323 Radiation Protection Instrumentation Test and Calibration for both log and linear scale survey instruments.

2.

A new form has been created which when used properly will give much more information on the history of why and when instrument maintenance and calibrations have been performed.

3.

A step has been added to direct the technician to notify a health physicist if an instrument if found outside of the acceptance criteria on two consecutive routine calibrations.

The health physicist must then evaluate whether an increase calibration frequency should be established for the instrument in question.

4.

The procedure title has also been changed to " Survey Instrument Calibration and Maintenance Records".

Very Truly Yours, hn E.

Maier i

Subscribed and sworn to me ontpisApril 16, 1982 4r &

H L

  • j t

SHARON G. CAVALER:

NOT ARY PUguc, Sta'e of U.Y., Montce County My Commdsion Expires March 30,19b

- -. -