Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1990-007-02, :on 900517,control Room Received Indication of Half Scram & Isolation of Inboard Reactor Water Cleanup Isolation Valve.Caused by Spurious Trip of Channel a Reactor Protection Sys Epa.Design Change Implemented + (ML20043F452)
- ML20043F453 + (ML20043F453)
- ML20043F455 + (ML20043F455)
- ML20043F457 + (ML20043F457)
- ML20043F458 + (ML20043F458)
- IR 05000206/1990020 + (ML20043F460)
- ML20043F462 + (ML20043F462)
- ML20043F464 + (ML20043F464)
- IR 05000483/1990009 + (ML20043F469)
- PNO-III-90-035, on 900605,35-yr Old Female Patient Received 4.3 Mci Dose of I-131 Instead of Intended Dose of 50 Uci. Caused by Technologist Misunderstanding of Written Prescription.Dual Verification for I-131 Use Initiated + (ML20043F470)
- 05000458/LER-1990-021, :on 900509,RWCU Sys Differential Flow High Trip Instrumentation Inoperable for Period Greater than Allowed by Tech Spec.Caused by Misinterpretation of Tech Spec 3/4.3.2,Table 3.3.2.-1.4.Personnel Retrained + (ML20043F472)
- ML20043F473 + (ML20043F473)
- ML20043F474 + (ML20043F474)
- ML20043F476 + (ML20043F476)
- ML20043F477 + (ML20043F477)
- ML20043F478 + (ML20043F478)
- ML20043F483 + (ML20043F483)
- ML20043F484 + (ML20043F484)
- ML20043F485 + (ML20043F485)
- 05000311/LER-1990-019, :on 900511,ESF Actuation Occurred When Radioactive Noble Gas Monitor 2R12A RMS Channel Spiked High. Caused by Equipment/Design Failures.Several Sys Design Mods Will Eliminate Spurious Actuation + (ML20043F486)
- ML20043F487 + (ML20043F487)
- 05000311/LER-1990-018, :on 900511,containment Purge/Pressure Vacuum Relief Sys Actuated.Caused by Design/Equipment Failures. Lighting Transformer 2HL Replaced + (ML20043F488)
- ML20043F490 + (ML20043F490)
- ML20043F492 + (ML20043F492)
- 05000445/LER-1990-011, :on 900504,Pressure Instrument Root Isolation Valve 1SI-8961 Open When Procedure Indicated Valve Should Be Locked Closed.Caused by Lack of Clear Instructions Re Definition of Physical Work. Valve Locked + (ML20043F494)
- ML20043F495 + (ML20043F495)
- ML20043F496 + (ML20043F496)
- ML20043F497 + (ML20043F497)
- NLS9000215, Forwards Changes to Proposed Rev 6 of Plant QA Program for Operation Policy Document Submitted in 900406 & 19 Ltrs + (ML20043F498)
- ML20043F499 + (ML20043F499)
- ML20043F500 + (ML20043F500)
- ML20043F502 + (ML20043F502)
- ML20043F503 + (ML20043F503)
- ML20043F505 + (ML20043F505)
- ML20043F506 + (ML20043F506)
- 05000369/LER-1990-009-01, :on 900512,feedwater Isolation Occurred as Result of Steam Generator 1B Reaching hi-hi Level Setpoint of 82% Level.Caused by Inappropriate Action Because of Lack of Attention to Detail.Feedwater Logic Reset + (ML20043F507)
- ML20043F508 + (ML20043F508)
- ML20043F509 + (ML20043F509)
- ML20043F510 + (ML20043F510)
- ML20043F511 + (ML20043F511)
- AECM-90-0110, Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 + (ML20043F512)
- ML20043F513 + (ML20043F513)
- ML20043F514 + (ML20043F514)
- ML20043F516 + (ML20043F516)
- ML20043F519 + (ML20043F519)
- ML20043F521 + (ML20043F521)
- ML20043F525 + (ML20043F525)
- ML20043F527 + (ML20043F527)
- ML20043F530 + (ML20043F530)
- ML20043F531 + (ML20043F531)
- ML20043F534 + (ML20043F534)