Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043B703 + (ML20043B703)
- ML20043B705 + (ML20043B705)
- 0CAN059010, Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R + (ML20043B709)
- ML20043B710 + (ML20043B710)
- ML20043B714 + (ML20043B714)
- ML20043B716 + (ML20043B716)
- ML20043B718 + (ML20043B718)
- ML20043B719 + (ML20043B719)
- ML20043B721 + (ML20043B721)
- ML20043B723 + (ML20043B723)
- ML20043B725 + (ML20043B725)
- ML20043B727 + (ML20043B727)
- ML20043B729 + (ML20043B729)
- RBG-32896, Gulf States Utils Co 1989 Annual Rept + (ML20043B732)
- ML20043B734 + (ML20043B734)
- ML20043B735 + (ML20043B735)
- ML20043B737 + (ML20043B737)
- ML20043B740 + (ML20043B740)
- IR 05000277/1990011 + (ML20043B742)
- ML20043B743 + (ML20043B743)
- ML20043B744 + (ML20043B744)
- ML20043B745 + (ML20043B745)
- ML20043B747 + (ML20043B747)
- IR 05000320/1990004 + (ML20043B750)
- BVY-90-061, Informs That Util Intends to Utilize Relationship Between Frosstey & FROSSTEY-2 to Support Cycle 15 Calculations.Nrc Approval of FROSSTEY-2 Needed by Aug 1990 for LOCA Analysis Program + (ML20043B756)
- ML20043B762 + (ML20043B762)
- ML20043B764 + (ML20043B764)
- ML20043B765 + (ML20043B765)
- ML20043B769 + (ML20043B769)
- IR 05000289/1990007 + (ML20043B771)
- ML20043B777 + (ML20043B777)
- ML20043B782 + (ML20043B782)
- ML20043B785 + (ML20043B785)
- ML20043B786 + (ML20043B786)
- ML20043B792 + (ML20043B792)
- ML20043B795 + (ML20043B795)
- 05000325/LER-1990-006-02, :on 900426,hydraulic Perturbation Occurred on Variable Leg of Instrumentation Used to Sense Reactor Water Level,Causing Isolation of RWCU Sys & Initiation of Standby Gas Treatment Sys.Diaphragm Assembly Recalibr + (ML20043B797)
- 05000259/LER-1990-007-02, :on 900426,high Pressure Fire Protection Sys Water Supply to Turbine,Reactor,Diesel Generator & Control Bldgs Isolated.Caused by Attempt to Isolate Broken Water Pipe.Potable Water Sys Pipe Repaired + (ML20043B800)
- 05000458/LER-1990-019, :on 900425,RWCU Sys Isolation & ESF Actuation Occurred After Completion of Channel Check of Riley Temp Trip Unit.Caused by Unit Exceeding Differential Temp Setpoint of 46 F.Unit Replaced + (ML20043B803)
- 05000346/LER-1990-009, :on 900426,source-check of Station Vent Radiation Monitors Not Performed Per Tech Spec 3.3.3.10. Caused by Use of Outmoded Light Emitting Dioide as Check Source.Source Check Procedures Revised + (ML20043B805)
- ML20043B807 + (ML20043B807)
- 05000302/LER-1990-007, :on 900112,discovered That Door Between Control Room Complex & Turbine Bldg Removed for Mod Work,Resulting in Inoperability of Both Trains of Emergency Ventilation Sys.Door Replaced & Warning Signs Affixed + (ML20043B809)
- ML20043B810 + (ML20043B810)
- ML20043B815 + (ML20043B815)
- ML20043B818 + (ML20043B818)
- ML20043B831 + (ML20043B831)
- ML20043B832 + (ML20043B832)
- 1CAN059003, Supplemental Application for Amend to License DPR-51,adding Insp Requirements for Other Steam Generator,Should Substantial Degradation Be Noted in Steam Generator + (ML20043B834)
- ML20043B836 + (ML20043B836)
- ML20043B837 + (ML20043B837)
- 3F0590-01, Describes Alternative Testing of Reactor Bldg Spray Suction Valves BSV-1 & BSV-8,per Generic Ltr 89-04.At Least One Valve Will Be Disassembled & Inspected During Each Refueling Outage Using Alternate Insp Method + (ML20043B843)