Forwards Safety Insp Repts 50-277/90-11 & 50-278/90-11 on 900430-0504.No Violations Noted.Problems Exist in Worker Compliance in Radiological Controlled Areas W/Applicable Procedures,Work Permit & Posting Requirements
ML20043B737
Person / Time
Site: Peach Bottom  
Issue date: 05/16/1990
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20043B738 List:
References
NUDOCS 9005310220
Download: ML20043B737 (3)


See also: IR 05000277/1990011

Text

{{#Wiki_filter:m v 1 o- .. O l !!AY 161999 Docket No. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. D. M. Smith Executive Vice President - Nuclear correspondence Control Desk p. O. Box.7520 Philadelphia, Pennsylvania 19101 , l Gentlemen: ! I Subject: Combined NRC Inspection Report Nos. 50-277/90-11 and 50-278/90-11 A routine, unannounced, safety inspection of the radiological controls program at the Peach Bottom Atomic Power Station was conducted by S. Sherbini on April 30 - May 4,.1990. Areas inspected included the self assessment functions, including { audits and event reporting, dosimetry records, training, and the ^ respirator maintenance facility. Within the scope of this inspection, no violations were ! identified. However, problems exist in worker compliance in j radiologically controlled areas with applicable procedures, work ! permit requirements, and also posting requirements. The system . . designed to identify these problems appears to function well, but j the subsequent actions taken to correct these weaknesses have

been in many cases, at least until recently, either ineffective or absent. We realize that the staff at the station are aware of this problem and that measures have been taken to correct them

However, these measures have only recently been instituted, and

it is too soon to measure their success. In addition, there are i some weaknesses in the proposed measures, the most important being the absence of a clear statement of accountability for personnel actions in radiological areas and the responsibility of section and job supervisors for the radiological success of jobs under their supervision. The success of your recent measures to improve problem identification and resolution will be assessed during future inspections. l n'yng yesv m; w i :.4R m wdAT.d ./ ' 9005310220 900S16 b6 I " PDR ADOC.K 03000277 ' = (h Q PDC

'

. . .- , MAY 1 6 1999 s 2 No violations were identified during this inspection, and no response to this letter is required. Your cooperation with us is appreciated. Sincerely, - Original Signed By: Ronald R. Bettemy Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and safeguards Enclosures NRC Combined Inspection Report No. 50-277/90-11 & 50-278/90-11 .cc w/encit J. Urban, General Manager, Fuels Department, Delmarva Power & Light D. R. Helwig, Vice President of Nuclear Engineering and Services D. B. Miller, Vice President for Peach Botton W. H. Hirst, Director, Joint , Generation Projects Department, Atlantic Electric J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station R. J. Lee, Chairman, Nuclear Review Board ' B. Gorman, Manager, External Affairs T. Conner, Jr., Esquire (without report) E. J. Cullen, Esquire, Assistant General Counsel (without report) R. L. Hovis, Esquire (without report) T. Magette, Power Plant Siting, Nuclear L' valuations G. Hunger, Director, Licensing Section J.,H. Walter, Chief Engineer, Public Service Commission of Maryland D. Poulsen, Secretary of Hartford County Council Public Document Room (PDR) Local Public Document Room (LPDR) , h hh) 4 4

! =. . . MAY 101990 3 Nuclear Safety Information center (NSIC) NRC Resident Inspector Commonwealth of Pennsylvania , bec w/ encl: Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o encl) R. Bellamy, DRSS DRP Section Chief M. Conner, SALP Reports Only PAO (2) Salp Reports and All Inspection Reports G. Suh, NRR K. Abraham, PAO (20) Salp Reports and (2) All Inspection Reports J. Caldwell, NRR i l

  • /k

ss S. Sherbini W. Pasciak Bellamy C / c /g o R.f/ib / q o l 5/15 /9o i 1 4 l 4 ' '!.? *;: ~ s < , ,..m ,.,. ! NIAbI i i65 . [[h ? . }}