Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000313/1990012 + (ML20043B450)
- B13536, Advises That Util Commits to Periodically Test Mods Made to Gas Turbine Generator & Feedwater Coolant Injection Sys,Per NRC 900518 Request.Procedure Changes to Support Testing Will Be Completed by 900525 + (ML20043B453)
- ML20043B455 + (ML20043B455)
- ML20043B457 + (ML20043B457)
- ML20043B459 + (ML20043B459)
- ML20043B460 + (ML20043B460)
- ML20043B462 + (ML20043B462)
- ML20043B463 + (ML20043B463)
- ML20043B464 + (ML20043B464)
- ML20043B465 + (ML20043B465)
- ML20043B467 + (ML20043B467)
- ML20043B468 + (ML20043B468)
- ML20043B469 + (ML20043B469)
- ML20043B470 + (ML20043B470)
- ML20043B471 + (ML20043B471)
- ML20043B473 + (ML20043B473)
- B13524, Provides Revised Schedule for Conversion of Plant to Zircaloy Clad Fuel.Schedule Extended Due to Removal of Reactor Vessel Thermal Shield During Current Refueling Outage Resulting in Need to Change large-break LOCA Model + (ML20043B475)
- IR 05000155/1990008 + (ML20043B476)
- ML20043B477 + (ML20043B477)
- ML20043B478 + (ML20043B478)
- ML20043B479 + (ML20043B479)
- IR 05000498/1989039 + (ML20043B481)
- ML20043B482 + (ML20043B482)
- ML20043B485 + (ML20043B485)
- ML20043B486 + (ML20043B486)
- ML20043B487 + (ML20043B487)
- IR 05000382/1990007 + (ML20043B488)
- U-601667, Informs NRC of Plant Initiatives for 1990 to Improve Corrective Action Program Effectiveness,In Response to SALP Rept & Violations Noted in Insp Rept 50-461/89-32. Centralized Commitment Tracking Sys Upgraded + (ML20043B489)
- ML20043B490 + (ML20043B490)
- ML20043B491 + (ML20043B491)
- ML20043B493 + (ML20043B493)
- ML20043B495 + (ML20043B495)
- ML20043B496 + (ML20043B496)
- ML20043B497 + (ML20043B497)
- LIC-90-0418, Updates Schedule for Submitting Results of PORV Block Valve Prototype Testing.Establishment of Test Parameters & Development of Test Procedures Tentatively Scheduled for Submittal in Nov 1990.Final Rept Expected by 910630 + (ML20043B498)
- ML20043B499 + (ML20043B499)
- 2CAN059003, Application for Amend to License NPF-6,revising Tech Spec 3/4.8.2 Re Voltage Correction for Average Electrolyte Temp in Station Batteries & Clarifying That Equalizing Charge Based Simply on Actual Cell Voltage Measurements + (ML20043B501)
- ML20043B503 + (ML20043B503)
- ML20043B504 + (ML20043B504)
- ML20043B505 + (ML20043B505)
- LIC-90-0435, Advises That Testing to Verify Operability of Hydrogen Purge Sys Successfully Completed During 1990 Refueling Outage.Proposed Tech Spec Rev Will Be Submitted by 900701 + (ML20043B506)
- ML20043B507 + (ML20043B507)
- ML20043B508 + (ML20043B508)
- ML20043B509 + (ML20043B509)
- ML20043B511 + (ML20043B511)
- ML20043B512 + (ML20043B512)
- IR 05000373/1990004 + (ML20043B513)
- 05000295/LER-1990-010, :on 900423,radiation Monitor 1RIA-PR49 Taken Out for Svc for More than 30 Days to Repair Problem W/ Blower.Caused by Ineffective Tracking of Time Clocks & Work Load Due to Forced Outage.Tracking Improved + (ML20043B515)
- ML20043B516 + (ML20043B516)
- 05000412/LER-1990-004-01, :on 900423,inadvertent ESF Actuation Occurred During Safeguards Protection Sys Testing.Caused by Personnel Closing Breaker Before Resetting Safety Injection Sys Signal.Signal Reset + (ML20043B517)
- ML20043B518 + (ML20043B518)