Docket No. 50-155
V AY 2 4 E
Consumers Power Company
1
'ATTH: David P. Hoffman
Vice President
Nuclear. Operations
1945 West Parnall Road
Jackson, MI -49201
This refers to the special safety inspection conducted by an NRC Emergency
Operating Procedure Inspection Team of this office on April 17 through
April 26, 1990 of activities at Big Rock Point Nuclear Plant authorized by
Operating License DPR-6 and.to the discussion of our findings with
Mr. W. Beckman, and others of your staff at the conclusion of the inspection.
The' purpose of this inspection was to verify that your E0Ps are technically
correct; that their specified actions can be accomplished using existing
equipment, controls, and instrumentation; and that the available procedures
provide the operator with an effective operating tool to place the plant in a
safe shutdown condition. The conclusion of.the. inspection team was that r,ll
of these criteria had been met.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and-
interviews with personnel.
The inspection team concurred in your approach to developing the Big Rock
Point symptom based E0Ps. This was considered a programmatic strength. A few
weaknesses were identified in the basis document and the E0P verification
effort as discussed in the attached inspection report. We encourage you to
continue monitoring the efforts of the BWR owners group relative to the
Generic Technical Guidelines to ensure any issues addressed by that group are
quickly assessed for applicability to Big Rock Point.
No. violations of NRC requirements were identified during the course of this
inspection; however, we do request that you respond within 30 days of the date
of this letter to the open items identified in the attached inspection report.
In accordance with 10 CFR 2.790 of the commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
The response directed by this letter is not subject to the clearance procedures
of the Office of Mar.agement and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
h % me osooo1ss
di
074 900s24
o
PDr.
g
.
hhI.
'
.
, ,,
,
e
T.
'
g..
~
MAY i4'im~
- = Consumers Power-Company
2
'
r
-If you have_any. questions concerning this' inspection, please contact
Mr..R.-.A.~ Hasse at (708) 790-5595.
OR!CHGL StCliED DY HU5D4I J. IfilLER
,
Hubert J. Miller, Director-
Division of Reactor Safety
Enclosure:
Inspection Report-
No. 50-155/90008(DRS)
cc w/ enclosure:
Mr. Kenneth- W.: Berry, Director
Nuclear Licensing
W. . L. - Beckman , Plant'-
Manager
DCD/DCB(RIDS)
..
Licensing. Fee Management Branch
1
Resident Inspector, RIII-
James R.=Padgett, Michigan Public
Service Commission
Michigan Department-of
_
1
Public Health:
'W.'Regan, LHFB,.NRR
G. Galletti, LHFB, NRR
.
>
RIII
RIII
pr
RII
RII
RIII
h\\\\%wq
s-
P
e
Hasse/cg NeUfelt
1111ps D
ette
Martin
Miller
5/0 /90
5/A /90
5/2,3/90
SA /90
/15/90
5/8 /90
5//f/90
.
]