Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035H647 + (ML20035H647)
- ML20035H648 + (ML20035H648)
- ML20035H649 + (ML20035H649)
- ML20035H651 + (ML20035H651)
- ML20035H652 + (ML20035H652)
- ML20035H653 + (ML20035H653)
- ML20035H654 + (ML20035H654)
- ML20035H655 + (ML20035H655)
- ML20035H656 + (ML20035H656)
- ML20035H657 + (ML20035H657)
- ML20035H659 + (ML20035H659)
- ML20035H660 + (ML20035H660)
- ML20035H661 + (ML20035H661)
- 05000412/LER-1993-007, :on 930405,identified Deficiency in Testing of Reactor Trip Breaker Manual Shunt Trip Circuitry.Caused by Deficient Procedure.All Licensed Operators Will Receive Training on ATWS as Part of Retraining + (ML20035H662)
- ML20035H665 + (ML20035H665)
- RBG-38-434, Radiological Environ Operating Rept for 1992 + (ML20035H667)
- ML20035H669 + (ML20035H669)
- ML20035H671 + (ML20035H671)
- ML20035H674 + (ML20035H674)
- 05000277/LER-1993-007, :on 930403,discovered That Drywell Atmospheric Radiation Monitor Isolated from Drywell Atmosphere for an Indeterminate Period,Due to Mispositioninig of Purge Valve. Valves Will Be Removed Temporarily + (ML20035H676)
- ML20035H677 + (ML20035H677)
- ML20035H678 + (ML20035H678)
- ML20035H679 + (ML20035H679)
- ML20035H680 + (ML20035H680)
- 05000254/LER-1993-004-06, :on 930331,RHR 1A & Core Spray 1A Rooms Declared Inoperable When Equipment Attendant Discovered That Plugs Not Installed in Floor Drains.Caused by Inadequate Communication.Floor Drain Plugs Installed + (ML20035H681)
- ML20035H682 + (ML20035H682)
- 05000265/LER-1993-008-02, :on 930331,visual Insp Revealed Recirculation Weld Area W/Water Seeping from Small Crack.Possibly Caused by Weld Defect or High Cycle Vibration Fatigue.Weld Repaired W/Full Structural Weld Overlay + (ML20035H683)
- ML20035H684 + (ML20035H684)
- 05000423/LER-1993-004, :on 930331,turbine Valve Closure Resulted in Reactor Trip Followed by Turbine Trip.Caused by Faulty Power Supply in electro-hydraulic Control Sys Mfg by Crosby Valve & Gauge Co.Also Reported Per Part 21 + (ML20035H685)
- ML20035H686 + (ML20035H686)
- ML20035H689 + (ML20035H689)
- ML20035H691 + (ML20035H691)
- ML20035H692 + (ML20035H692)
- ML20035H693 + (ML20035H693)
- ML20035H694 + (ML20035H694)
- ML20035H697 + (ML20035H697)
- ML20035H698 + (ML20035H698)
- ML20035H699 + (ML20035H699)
- ML20035H700 + (ML20035H700)
- ML20035H701 + (ML20035H701)
- ST-HL-AE-4416, Submits Comments on NRC Re Violations Noted in Insp Repts 50-498/93-05 & 07 & 50-499/93-05 & 07 + (ML20035H703)
- 05000374/LER-1992-008-01, :on 920615,RCIC Turbine Exhaust Vacuum Breaker Upstream Stop MOV 2E51-F086 Tripped Due to Thermal Overload on Motor Control Ctr 236Y-2 Compartment E2.Cause Not Determined.Work Request Initiated + (ML20035H704)
- ML20035H705 + (ML20035H705)
- ELV-05401, Forwards Vogtle Electric Generating Plant Units 1 & 2 1992 Annual Rept - Part 2. Notifies That Section Ii,Plant Mods & Tests or Experiments,Interim Rept for Only Period of Jan-May 1992 + (ML20035H706)
- ML20035H708 + (ML20035H708)
- 05000373/LER-1992-013-02, :on 921114,DG 1A Automatically Started While Disconnecting Test Equipment at Completion of Reactor Vessel High Steam Dome Pressure Scram Response Time Test.Cause Unknown.Special Test Performed + (ML20035H709)
- ML20035H710 + (ML20035H710)
- ML20035H711 + (ML20035H711)
- ST-HL-AE-4413, Responds to Violations Noted in Insp Repts 50-498/93-09 & 50-499/93-09.Corrective Actions:Combustible/Flammable Matls Immediately Stored Properly & Info from OPGP03-ZF-0005 Posted & Distributed & Briefings Will Be Conducted + (ML20035H712)
- 05000325/LER-1993-004, :on 930209,discovered That Actions Required to Satisfy TS Inadequately Established on 920811 & 1125 When RPS Declared Inoperable.Cause Analysis in Progress. Corrective Actions Will Be Reported in Suppl + (ML20035H713)
- ML20035H715 + (ML20035H715)