s Consumers PO W r.iriew u oonn.y Plant Manager PinVERING hlKNNiFAN'S PROGRESS Big Rock Point Nuclear Plant. 10269 05-31 North, Charlevoix, MI 49720 i
April 30, 1993
{
i Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - ADDENDUM TO TECHNICAL SPECIFICATION CHANGE REQUEST.- ADMINISTRATIVE CONTROLS (ORIGINAL SUBMITTAL ~ DATED JANUARY 29,1993) l On January 29, 1993, Big Rock Point. submitted a Technical Specification Change Request to address changes to the Consumers Power Nuclear Operations Department (N0D). To complete the Staff's review of this request, an addition to paragraph' 6.5.1.2 was requested by the Office of Nuclear Reactor Regulation l
(NRR) Project Manager during an April 26, 1993. meeting with the licensee.
Paragraph 6.5.1.2 discusses the qualifications of the Plant Review Committee (PRC). The original submittal ' references ANSI N18.1-1971, but does not specify a particular section(s), as noted by the NRR Project Manager. This addendum will add a reference to sections 4.2 and 4.4 (Qualifications for Managers and Professional Technical Groups) of the ANSI Standard to ensure that only qualified members serve on the PRC.
Find attached the corrected page:: to be inserted in place of the original submittal pages.
l Patri Donnelly l
Patrick M Donnelly Plant Manager L
l CC: Administrator, Region III, USNRC-l r
NRC Resident Inspector - Big Rock Point I
k ATTAR.HMFMTe n n o n l' {
9305060155-930430' i
fDR ADOCK O5000155 A CA6 ENE72GYCOMPANY PDR
'