Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035A610 + (ML20035A610)
- ML20035A612 + (ML20035A612)
- ML20035A613 + (ML20035A613)
- ML20035A617 + (ML20035A617)
- ML20035A620 + (ML20035A620)
- ML20035A623 + (ML20035A623)
- ML20035A624 + (ML20035A624)
- ML20035A626 + (ML20035A626)
- ML20035A627 + (ML20035A627)
- ML20035A629 + (ML20035A629)
- ML20035A630 + (ML20035A630)
- ML20035A632 + (ML20035A632)
- IR 05000255/1993004 + (ML20035A634)
- IR 05000254/1993003 + (ML20035A635)
- ML20035A636 + (ML20035A636)
- ML20035A637 + (ML20035A637)
- ML20035A644 + (ML20035A644)
- ML20035A649 + (ML20035A649)
- BECO-93-038, Forwards List of ISI Exams Scheduled as Part of Third Period of Pilgrim Second Ten Yr Insp Interval in Accordance W/ Section XI of ASME Boiler & Pressure Vessel Code + (ML20035A650)
- ML20035A654 + (ML20035A654)
- ML20035A657 + (ML20035A657)
- ET-NRC-93-3848, Forwards Draft AP600 Test Programs for Comments on Matrix by 930401 & to Be Finalized by 930415 + (ML20035A659)
- ML20035A662 + (ML20035A662)
- ML20035A663 + (ML20035A663)
- ML20035A665 + (ML20035A665)
- ML20035A666 + (ML20035A666)
- ML20035A671 + (ML20035A671)
- ML20035A674 + (ML20035A674)
- ML20035A678 + (ML20035A678)
- ML20035A681 + (ML20035A681)
- 05000374/LER-1993-002-06, :on 930223,RCIC Sys Declared Inoperable When Required Sys Flow of 600 Gpm Could Not Be Obtained.Caused by Inoperable Turbine Control Box.Work Request L21599 Written to Investigate & Repair Problem + (ML20035A684)
- ML20035A688 + (ML20035A688)
- ML20035A690 + (ML20035A690)
- ML20035A691 + (ML20035A691)
- ML20035A693 + (ML20035A693)
- ML20035A695 + (ML20035A695)
- 05000373/LER-1993-005-02, :on 930222,two High Radiation Doors Were Found Unsecured.Caused by Blown Fuse on C Phase Output of Static Switch.Alarm on Doors Investigated & Secured + (ML20035A697)
- ML20035A699 + (ML20035A699)
- ML20035A702 + (ML20035A702)
- ML20035A703 + (ML20035A703)
- ML20035A704 + (ML20035A704)
- ML20035A706 + (ML20035A706)
- JPN-93-016, Forwards Response to NRC Second Request for Addl Info Re Power Uprate Submittal Concerning Effects of Increased Process & Ambient Temp & Pressures on Instrument Accuracy. Calculations Supporting Response Encl + (ML20035A710)
- ML20035A713 + (ML20035A713)
- ML20035A714 + (ML20035A714)
- ML20035A715 + (ML20035A715)
- ML20035A716 + (ML20035A716)
- ML20035A718 + (ML20035A718)
- ML20035A719 + (ML20035A719)
- 05000414/LER-1993-001-01, :on 930221,essential Auxiliary Power Sys Blackout Occurred When DG 2B Removed from Svc.Caused by Missed Procedure.On 930222,problems W/Train a CR Area Ventilation Sys Occurred.Procedures Revised + (ML20035A720)
- B14411, Advises That Written Reactor Operator & Senior Reactor Operator Licensing Exams & Operating Tests Scheduled for Wks of 930419 for Millstone Unit 3 & 930426 for Haddam Neck Plant.Exams Will Be Conducted Per NUREG-1021,Rev 7 + (ML20035A721)