Responds to NRC Ltr Re Violations Noted in Insp Repts 50-528/92-43,50-529/92-43 & 50-530/92-43.Corrective Actions: Licensee Will Revise UFSAR 13.1.1.3 to Clarify Qualification Requirements for Engineering Staff by 930430
ML20035A706
Person / Time
Site: Palo Verde  
Issue date: 03/23/1993
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-02457-WFC-T, 102-2457-WFC-T, NUDOCS 9303290182
Download: ML20035A706 (6)


Text

..

i O

A-r t

I Arizona Public Service Company

-j PsorMX. AFCZONA 85m999 l

e o ecx 53999 e7cNUcOS"syl4 102-02457-WFC/TRB/JJN March 23,1993 aucu a U. S. Nuclear Regulatory Commission l

ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Reference:

- Letter dated February 26,1993, from S. A. Richards, Acting Branch Chief, I

Reactor Projects Branch, NRC, to W. F. Conway, Executive Vice President,-

Nuclear, APS

Subject:

Paio Verde Nuclear. Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Notice of Deviation 50-528/92-43-02 File: 93-070-026 j

Arizona Public' Service - Company (APS) has reviewed NRC - Inspection Report 50-528/529/530/92-43, and the Notice of Deviation, dated February 26,1993. Pursuant -

to the provisions of 10 CFR 2 Appendix C, APS' response is provided as Enclosure 1.

Appendix A to this letter :'s a restatement of the Notice of Deviation.

j If you should have any questions, please call Thomas R. Bradish at (602) 393-5421.

Sincerely,

[

/tz%

WFC/TRB/JJN/ap j

Enclosures-1.

Appendix A - Restatement of Notice of Deviation

2..- Reply to the Notice of Deviation cc:

J. B. Martin J. A. Sloan 290062 ffI 9303290182 930323 PDR ADOCK 05000528

. j G

PDR t

t

]

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Notice of Deviation 50-528/92-43-02 Page 2 i

'i bec:

J. M. Levine 7602 E. C. Simpson 7616 J. A. Bailey 1875 G. R. Overbeck 7546 E. W. Dotson 7694 R. J. Stevens 7603 W. E. Ide 7194 R. K. Flood 7294 P. J. Wiley 7298 R.J.Adney 7394 R.E. Gouge 7610 P. W. Hughes 7916 E. G. Firth 6156 C. D. Mauldin 7610 S. C. Guthrie 7992 G. T. Shanker 7965 T. R. Bradish 7636

'i B. A. Grabo 7636 A. H. Gutterman A. C. Gehr 4141 P. J. Coffin 7636 i

B. A. Brown 7636 Source Document Ubrary 7747 l

t i

e t

]

APPENDIX A l

RESTATEMENT OF NOTICE OF DEVIATION r

50-528/92-43-02 j

NRC INSPECTION CONDUCTED DECEMBER 15,1992 - JANUARY 19,1993-INSPECTION REPORT NOS. 50-528/529/530/92-43 i

~

I i

f

RESTATEMENT OF NOTICE OF DEVIATION 50-528/92-43-02 During an NRC ir,spection conducted on December 15,1992 through January 19,1993, one deviation of your Updated Final Safety Analysis Report (UFSAR) was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement

~

Actions," 10 CFR Part 2, Appendix C, the deviation is listed below:

Section 13.1.1.3 of the UFSAR states: "The education and experience qualification requirements for management and technical support organization engineering staff 4

are established in PVNGS (Palo Verde Nuclear Generating Station) position descriptions. PVNGS position descriptions are developed using the guidance of ANSI 3.1-1978."

PVNGS position descriptions for job codes 43004, 43004, 40516, 40517, 40754, 40767, and 40777 all require a Bachelor of Science degree in engineering.

Contrary to the above,14 people in the above job codes did not have a Bachelor of Science degree in engineering.

f 1 of 1

l r

^!

h l

i i

ENCLOSURE 1

]

REPLY TO NOTICE OF DEVIATION 50-528/92-43 4 2.

i NRC INSPECTION CONDUCTED

}

DECEMBER 15,1992 THROUGH JANUARY 19,1993

-l I

INSPECTION REPORT NOS. 50-528/529/530/92-43 I

t i

1 i

l i

i l

l

REPLY TO NOTICE OF DEVIATION 50-528/92-43-02 Reason For The Deviation The reason for the deviation was an incomplete description of the intended change to the FSAR. APS intended to raise the qualification standards for new personnel in engineering positions. The change to the FSAR was expected to be applicable only to personnel hired subsequent to the change.

Corrective Steps Which Have Been Taken And Results Achieved APS has evaluated the individuals who are employed in positions currently which require a Bachelor's of Science degree in engineering but have not attained this degree.

These individuals have been determined to be appropriately qualified in accordance with ANSI 3.1-1978 and other relevant requirements.

Corrective Steps Which Will Be Taken to Avoid Further Deviations APS will revise UFSAR 13.1.1.3 to clarify the qualification requirements for the engineering staff. This revision is expected to be completed by April 30,1993.

i Date When Correction Action Will Be Completed The revision to the UFSAR 13.1.1.3 is expected to be completed by April 30,1993.

!