Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028B730 + (ML20028B730)
- ML20028B731 + (ML20028B731)
- 05000395/LER-1982-029, Forwards LER 82-029/03L-0.Detailed Event Analysis Encl + (ML20028B733)
- ML20028B734 + (ML20028B734)
- 05000245/LER-1982-025-03, /03L-0:on 821026,pressure Switch 263-55C Tripped Above Tech Spec During Reactor Vessel High Pressure Functional & Calibr Test.Caused by Setpoint Drift.Switch Reset & Satisfactorily Tested + (ML20028B735)
- IR 05000368/1982032 + (ML20028B736)
- ML20028B737 + (ML20028B737)
- ML20028B739 + (ML20028B739)
- ML20028B740 + (ML20028B740)
- IR 05000254/1982018 + (ML20028B743)
- 05000395/LER-1982-029-03, /03L-0:on 821025,during Zero Power Testing, Isolation Amplifier Resistor Input on Power Range Channel NI-44 Found Out of Calibr Tolerance.Caused by Instrument Drift.Channel Removed from Svc & Calibr + (ML20028B746)
- IR 05000293/1982028 + (ML20028B747)
- 05000336/LER-1982-045, Forwards LER 82-045/03L-0 + (ML20028B748)
- ML20028B749 + (ML20028B749)
- 05000395/LER-1982-032-03, /03L-0:on 821029,auxiliary Operator Discovered Nuclear Blowdown Monitor Tank Damaged.Caused by Distorted Diaphragm Blocking Tank Overflow & Vent Paths.Diaphragm Removed & Tank Repaired + (ML20028B750)
- 05000336/LER-1982-045-03, /03L-0:on 821027,at 100% Power,Control Room Air Conditioning Sys 1 Was Lost.Caused by Broken Wire Which Shifted Shorting Power Supply Due to Personnel Error.Wire Repaired & Air Conditioning Sys Returned to Svc + (ML20028B752)
- ML20028B754 + (ML20028B754)
- IR 05000289/1982017 + (ML20028B757)
- ML20028B759 + (ML20028B759)
- ML20028B761 + (ML20028B761)
- ML20028B763 + (ML20028B763)
- L-82-517, Interim Deficiency Rept Re Fan Belts on Diesel Generators 2A & 2B.Initially Reported on 820210.Addl Mods Needed to Fully Correct Problem.Final Rept Will Be Submitted by 830120 + (ML20028B765)
- ML20028B766 + (ML20028B766)
- IR 05000289/1982023 + (ML20028B767)
- ML20028B768 + (ML20028B768)
- ML20028B769 + (ML20028B769)
- 05000336/LER-1982-043, Forwards LER 82-043/03L-0 + (ML20028B770)
- ML20028B771 + (ML20028B771)
- IR 05000259/1982030 + (ML20028B773)
- ML20028B779 + (ML20028B779)
- ML20028B781 + (ML20028B781)
- ML20028B782 + (ML20028B782)
- ML20028B784 + (ML20028B784)
- ML20028B785 + (ML20028B785)
- ML20028B786 + (ML20028B786)
- ML20028B788 + (ML20028B788)
- ML20028B790 + (ML20028B790)
- ML20028B791 + (ML20028B791)
- ML20028B792 + (ML20028B792)
- ML20028B793 + (ML20028B793)
- ML20028B794 + (ML20028B794)
- ML20028B795 + (ML20028B795)
- NUREG-0862, Submits Review of NUREG-0862, Insp Rept of Preliminary Rept,Seismic Reverification Program at Diablo Canyon Nuclear Power Plant,Units 1 & 2, Per Udall 820208 & Ottinger 820204 Requests.Investigation Conducted in 2 Phases + (ML20028B799)
- ML20028B800 + (ML20028B800)
- ML20028B802 + (ML20028B802)
- ML20028B803 + (ML20028B803)
- ML20028B807 + (ML20028B807)
- ML20028B809 + (ML20028B809)
- ML20028B810 + (ML20028B810)
- ML20028B812 + (ML20028B812)
- ML20028B813 + (ML20028B813)