Forwards IE Insp Repts 50-254/82-18 & 50-265/82-20 on 820908-1022.No Noncompliance Noted
ML20028B731
Person / Time
Site: Quad Cities  
Issue date: 11/19/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20028B732 List:
References
NUDOCS 8212030187
Download: ML20028B731 (2)


See also: IR 05000254/1982018

Text

o

e-

NOV 191982

Docket No. 50-254

Docket No. 50-265

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the routine safety inspection conducted by N. J. Chrissotimos

and S. G. DuPont of this office on September 8,

1982, through October 22,

1982, of activities at Quad-Cities Nuclear Power Station, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30 and to the

discussion of our findings with Mr. N. J. Kaliviankis at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disc,losure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estsb-

lished. Consistent with Section 2.790(b)(1), any such application mast

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

8212030187 821119

PDR ADOCK 05000254

'

"""

f6of

,

.

s-

Commonwealth Edison Company

2

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

.;

the considerations listed in 10 CFR 2.790(b)(4). _The information sought

'

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

=

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

.

We will gladly discuss any questions you have concerning this inspection.

i

Sincerely,

I

.

J. F. Streeter, Chief

Projects Branch

I

l

Enclosure:

Inspection Report

No. 50-254/82-18(DPRP);

No. 50-265/82-20(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

N. Kalivianakis, Plant

Superintendent

J

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

}

$

1

RI I

RIII

r?$

lhWh

.,

Ealker/jp

Streeter

2

11/19/82

!

- - - - -

-.

..-. - .

.

, , .

A