Text
o
e-
NOV 191982
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
This refers to the routine safety inspection conducted by N. J. Chrissotimos
and S. G. DuPont of this office on September 8,
1982, through October 22,
1982, of activities at Quad-Cities Nuclear Power Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30 and to the
discussion of our findings with Mr. N. J. Kaliviankis at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disc,losure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estsb-
lished. Consistent with Section 2.790(b)(1), any such application mast
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
8212030187 821119
PDR ADOCK 05000254
'
"""
f6of
,
.
s-
Commonwealth Edison Company
2
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
.;
the considerations listed in 10 CFR 2.790(b)(4). _The information sought
'
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
=
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
.
We will gladly discuss any questions you have concerning this inspection.
i
Sincerely,
I
.
J. F. Streeter, Chief
Projects Branch
I
l
Enclosure:
Inspection Report
No. 50-254/82-18(DPRP);
No. 50-265/82-20(DPRP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
J
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
}
$
1
RI I
RIII
r?$
lhWh
.,
Ealker/jp
Streeter
2
11/19/82
!
- - - - -
-.
..-. - .
.
, , .
A