Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E068 + (ML20005E068)
- IR 05000354/1989021 + (ML20005E070)
- ML20005E071 + (ML20005E071)
- ML20005E072 + (ML20005E072)
- ML20005E074 + (ML20005E074)
- IR 05000219/1989027 + (ML20005E075)
- PNO-III-89-088, on 891221,determined That Licensee Shipped Methyl Bromide Tagged w/NRC-licensed Matl W/Documents Identifying Matl as Glucose Containing C-14.Confirmatory Action Ltr Issued to Licensee + (ML20005E077)
- ML20005E079 + (ML20005E079)
- 05000327/LER-1989-032, :on 891205,RHR Pumps Determined to Have Deadheading Problem,Per NRC Bulletin 88-004,resulting in Plant Operation Outside Design Basis.On 891128,RHR Pump Exceeded Head Criteria.Pumps Started + (ML20005E080)
- U-601577, Special Rept:On 891120,Div 1 Diesel Generator 1A Failed During Surveillance Testing.Caused by Erratic Start Times. Diesel Generator Governors Readjusted + (ML20005E081)
- 05000440/LER-1989-030, :on 891125,plant Entered Tech Spec 3.0.3 Due to Two Untrippable Control Rods.Caused by Failure to Return Scram Pilot Valves Used for Rods to Mfg After Recall. Surveillance Instruction Revised + (ML20005E082)
- 05000327/LER-1989-032-01, :on 891201,discovered That Tech Spec Surveillance Requirement to Verify That Valves 1-67-748 & 2-67-748 in Open Position Not Met.Caused by Personnel Error.Correct Valve Position Verified + (ML20005E083)
- ML20005E084 + (ML20005E084)
- ML20005E086 + (ML20005E086)
- IR 05000029/1989022 + (ML20005E088)
- U-601576, Advises That Revised Fitness for Duty Program Will Meet 10CFR26 Requirements,Effective 900103.Util Intends to Test for Substances Listed at Indicated cut-off Levels + (ML20005E089)
- ML20005E090 + (ML20005E090)
- PNO-III-89-089, on 891226,while Operating at 100% Power, Reactor Automatically Shut Down as Result of Negative Flux Rate.Caused by Reactor Protection Motor Generator Output Breakers Opening.Power Restored to Reactor Coolant Pump + (ML20005E093)
- ML20005E094 + (ML20005E094)
- 05000352/LER-1989-058, :on 891123,actuation of Group III Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Automatic Isolation of Rwcu.Caused by Failure of Flow Summer Card.Card Replaced + (ML20005E096)
- ML20005E098 + (ML20005E098)
- ML20005E099 + (ML20005E099)
- ML20005E101 + (ML20005E101)
- ML20005E102 + (ML20005E102)
- ML20005E103 + (ML20005E103)
- ML20005E105 + (ML20005E105)
- ML20005E106 + (ML20005E106)
- IR 05000295/1989034 + (ML20005E109)
- 05000327/LER-1989-030, :on 891204,fire Suppression Sys Deluge Valve Isolated More than 1 H W/O Required Continuous Fire Watch Establishment.Caused by Personal Communication Breakdown. Valve Opened & Foreman in Charge Counseled + (ML20005E116)
- ML20005E117 + (ML20005E117)
- ML20005E121 + (ML20005E121)
- PNO-III-89-087, on 891221,reactor Automatically Shut Down as Result of Negative Flux Rate,Causing Loss of Power to Reactor Coolant & Main Condenser Circulation Pumps.Forced Recirculation Restored & Inspector Sent to Plant + (ML20005E122)
- ML20005E123 + (ML20005E123)
- ML20005E124 + (ML20005E124)
- IR 05000483/1989019 + (ML20005E126)
- ML20005E128 + (ML20005E128)
- ML20005E129 + (ML20005E129)
- ML20005E130 + (ML20005E130)
- W3P89-2162, Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Will Complete All design-basis Reviews,Analyses,Verifications,Insps & Tests, Per Items a Through H by End of Sixth Refueling Outage + (ML20005E131)
- ML20005E132 + (ML20005E132)
- ML20005E133 + (ML20005E133)
- 05000458/LER-1989-041, :on 891125,unplanned ESF Actuation Occurred as Result of Two Leads Shorted Together During Testing of Control Circuitry,Causing Valve Isolation from Suppression Pool.Sys Lineup Restored to Normal Position + (ML20005E138)
- PY-CEI-NRR-1115, Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Each motor- Operated Valve Will Be Stroke Tested to Verify Valve Operability at no-pressure & no-flow Conditions + (ML20005E139)
- ML20005E140 + (ML20005E140)
- ML20005E141 + (ML20005E141)
- ML20005E142 + (ML20005E142)
- ML20005E144 + (ML20005E144)
- ML20005E146 + (ML20005E146)
- ML20005E148 + (ML20005E148)
- IR 05000482/1989029 + (ML20005E150)
- 05000271/LER-1989-025, :on 891128,primary Containment Isolation Sys Group III & Standby Gas Treatment Sys Initiation Occurred. Caused by Failure of Reactor Bldg Ventilation Radiation Monitor/Sensor Converter.Converter Replaced + (ML20005E151)