Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347B544 + (ML19347B544)
- ML19347B545 + (ML19347B545)
- ML19347B546 + (ML19347B546)
- ML19347B548 + (ML19347B548)
- ML19347B549 + (ML19347B549)
- ML19347B550 + (ML19347B550)
- ML19347B551 + (ML19347B551)
- AECM-80-217, Responds to IE Bulletin 80-19,Revision 1,re mercury-wetted Matrix Relays in Reactor Protective Sys.Specified Concerns Not Applicable as Relays Are Not Used in Protection Sys. Requests Extension to Complete NSSS Portions + (ML19347B552)
- ML19347B553 + (ML19347B553)
- ML19347B557 + (ML19347B557)
- BSEP-80-1554, Suppls Response to IE Bulletin 80-17 Re Control Rod Insertion Failure.Manual & Automatic Scrams Performed Satisfactorily.Test Performed as Prerequisites to Scram Survey Indicate No Blockage in Discharge Vent & Drain Lines + (ML19347B559)
- ML19347B560 + (ML19347B560)
- ML19347B561 + (ML19347B561)
- ML19347B563 + (ML19347B563)
- ML19347B565 + (ML19347B565)
- ML19347B567 + (ML19347B567)
- ML19347B568 + (ML19347B568)
- ML19347B569 + (ML19347B569)
- ML19347B570 + (ML19347B570)
- ML19347B571 + (ML19347B571)
- ML19347B572 + (ML19347B572)
- ML19347B574 + (ML19347B574)
- ML19347B575 + (ML19347B575)
- ML19347B577 + (ML19347B577)
- ML19347B578 + (ML19347B578)
- ML19347B579 + (ML19347B579)
- A800046, Submits Modified Completion Schedule Resulting from Discussions & Changes in Contractor Assistance to Effect Mod.Drywell & Torus Mods Will Be Completed Before 820430. Completion Date Five Months Sooner than Previous Schedule + (ML19347B580)
- ML19347B581 + (ML19347B581)
- ML19347B582 + (ML19347B582)
- 05000266/LER-1980-011, Forwards LER 80-011/03L-0 + (ML19347B583)
- ML19347B584 + (ML19347B584)
- ML19347B585 + (ML19347B585)
- ML19347B586 + (ML19347B586)
- 05000266/LER-1980-011-03, /03L-0:on 800926,found That,Aug 1977-Sept 1980, Containment Spray Sys Spray Additive Valves Were Tested Per ASME Program Requirements Instead of Per Tech Specs.Caused by Administrative Error Re NRC + (ML19347B587)
- ML19347B588 + (ML19347B588)
- ML19347B589 + (ML19347B589)
- ML19347B590 + (ML19347B590)
- ML19347B591 + (ML19347B591)
- TXX-3216, Forwards Presentation of Assumptions,Methodology & Tabulation of BTP 9.5-1,App A,Compliances Currently Being Used to Establish Fire Protection Program.Fsar Will Be Amended to Reflect Updated Fire Hazards Analysis + (ML19347B592)
- ML19347B593 + (ML19347B593)
- ML19347B594 + (ML19347B594)
- ML19347B595 + (ML19347B595)
- ML19347B596 + (ML19347B596)
- ML19347B598 + (ML19347B598)
- ML19347B599 + (ML19347B599)
- ML19347B601 + (ML19347B601)
- ML19347B603 + (ML19347B603)
- ML19347B605 + (ML19347B605)
- ML19347B606 + (ML19347B606)
- ML19347B607 + (ML19347B607)
- 05000271/LER-1980-028, Forwards LER 80-028/03L-0 + (ML19347B608)