Text
,7,
(,,/
1 YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT S0-09 FOR THE MONTH OF OCTOBER, 1980 l
8010150325
J 4
D*
D
- D ~3~
.b..
n ww w
d OPERATING DATA REPORT DOCKET NO.
50-29 I
DATE QO' n' o CO31PLETED BY F.
C.
Beers l
TELEPHONE 617-366-9011 X2215 i
OPERATING STATUS Notes Yankee Rae
- 1. Unit Name:
Sectember, 1980 i
- 2. Reporting Period:
- 3. Licensed Thermal Power (31Wt):
600 185
- 4. Nameplate Rating (Gross 31We):
175
- 5. Design Electri:21 Rating (Net 31We):
180
- 6. Sf aximum Dependable Capacity (Cross StWe):
i 175
- 7. Staximum Dependable Capacity (Net 31We):
- 8. If Changes Oc:ur in Capacity Ratin;s (Items Number 3 Throu;h 7) Since Last Report. Give Reasons:
l
- 9. Power Les el To Which Restricted. If Any (Net 31We):
- 10. Reasons For Restrictions.If Any:
4 This 31onth Yr..to.Date Cumulative
' O Am
- 11. Hours in Reportin; Period
- 12. Number of Hours Reactor Was Critias!
0.0 445.77 138.810.42
- 13. Reactor Resene Shutdovm Hours 0.0 0.0 0.0
~
0.0 439.70 134,467.31
- 14. Hours Generator On.Line
~
0.0 0.0 0.0
^
- 15. Unit Resene Shutdown Hours j
- 16. Cross Thermal Ener;y Generated (31WH) 0.0 2 5 3.769.00 72.002,0'; t.11
]
- 17. Gross Electrical Ener;y Generated (31WH) 0.0 nn.6 n.00 22
'V 789.20 IS. Net E:ectrica! Energy Generated (31WH) 0.0 75.7?.8.88 20.741.892.21 0.0 6.7 77.1 j
19 Unit Senice Fae:or 0.0 6.7 77.1
- 20. Unit Availability Factor 0.0 6.6 70.2 f
- 21. Unit Capacity Factor (Using 3tDC Net) 0.0 6.6 70.2
- 22. Unit Capacity Factor (Using DER Net) 100.0 91.6 5.0
- 23. Urit Forced Outage Rate j
- 24. Shutdowns Scheduled Over Nest 6 Stonths (Type.Date.and Duration of Eacht:
November 1. 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INIT! A L CRIT!CALITY 4
INITIAL ELECTRICITY CO3151ERCIAL CPER AT:CN i
l ic/77) 1
,i :
AVERACE DAILY UNIT POWER LEVEL DCCKET NO. 50-29 UNIT Y,nkee Rwe i
DATE 301010 CO31PLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 i
510NTli September, 1980 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We NetI (SIWE Net 1 1
0.0 37 0.~0 l
2 iS 3
19 4
20 5
21 l
6 22 k
7 23 3
'4 9
25 10 26 II 27 12 2S 13 29 14 30 t/
15 31 16 3/
INSTRUCT 0NS On this format, list the average daily unit power level in S!We Net fer each day in the reporting month.Gompute to the nearest whole megawatt.
I i
19[I7)
UNITSilU1 DOWNS ANDl'0WER REDUCTIONS DOCKET NO.
50-29 UNIT NAME _ Yankee Rowe DA1E 801010 COT frLETED itY F.
C.
Beers REl'OllT MONTil September. 1980 TELLPflONE 617-366-9011 X2215 E;
' l-5 Eb 5
g Iunsee E..
57.
Cause & roerectid Nie.
Date E.
3j 5 a
3 g 'a I.* * " '
f,3 S3 Action in 3-U S3' o2 4
cc a si c Repost #
mo e: u l'tc*cni Itecursente g
O o
1 1/19/80 F
720 A
1 N/A N/A N/A The plant is still shut dowri for 3
turbine rotor investigation and 4~g repair.
5&'"
C3
[9_8 Q1 b
h
' Emme
@b I
~
3 4
3 l': For t eil gge, son.
S: S(licif utest 3.g,p,i,' ment Faihne (Explain)
Ihlishit G. Instrutiions t ' 3'""'g I"' PicParation nl Data Il Mainteiunce of Test 2 'M ' ""'I S'"-
Entay Sliccis Ine 1.iu,iu-e C Itclueliiir
"' " " "' C N C ' '"" -
Event Iterini (Ll'Iti l'ile INultt:G-D-Ites;ula:Ery Itcsirictiuri IU*PI "I 0161) li Opre.itor liaining & License Examination F Aihnini.ieative b
6 U Ct.eiion.il l eens (linpl.niti) l'.stnini ! - Same Sousa P
I,Y #7)
It Ushes flix;.l. sin)
--nn D
DOCKET No.
50-29 UNIT Yankee Rowe DATE 901010 COMPLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 REPORT MONTH SEPTEMBER 1980 SU.'ItARY OF CPERATING EXPERIENCES 9/1 The plant remained shut down for the entire month, in Mode 5.
due to turbine disc failure.
4
=
l f
l