ML19347B549

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1980
ML19347B549
Person / Time
Site: Yankee Rowe
Issue date: 10/10/1980
From: Beers F
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML19347B547 List:
References
NUDOCS 8010150325
Download: ML19347B549 (5)


Text

,7,

(,,/

1 YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT S0-09 FOR THE MONTH OF OCTOBER, 1980 l

8010150325

J 4

D*

D

  • D ~3~

.b..

n ww w

d OPERATING DATA REPORT DOCKET NO.

50-29 I

DATE QO' n' o CO31PLETED BY F.

C.

Beers l

TELEPHONE 617-366-9011 X2215 i

OPERATING STATUS Notes Yankee Rae

1. Unit Name:

Sectember, 1980 i

2. Reporting Period:
3. Licensed Thermal Power (31Wt):

600 185

4. Nameplate Rating (Gross 31We):

175

5. Design Electri:21 Rating (Net 31We):

180

6. Sf aximum Dependable Capacity (Cross StWe):

i 175

7. Staximum Dependable Capacity (Net 31We):
8. If Changes Oc:ur in Capacity Ratin;s (Items Number 3 Throu;h 7) Since Last Report. Give Reasons:

l

9. Power Les el To Which Restricted. If Any (Net 31We):
10. Reasons For Restrictions.If Any:

4 This 31onth Yr..to.Date Cumulative

' O Am

11. Hours in Reportin; Period
12. Number of Hours Reactor Was Critias!

0.0 445.77 138.810.42

13. Reactor Resene Shutdovm Hours 0.0 0.0 0.0

~

0.0 439.70 134,467.31

14. Hours Generator On.Line

~

0.0 0.0 0.0

^

15. Unit Resene Shutdown Hours j
16. Cross Thermal Ener;y Generated (31WH) 0.0 2 5 3.769.00 72.002,0'; t.11

]

17. Gross Electrical Ener;y Generated (31WH) 0.0 nn.6 n.00 22

'V 789.20 IS. Net E:ectrica! Energy Generated (31WH) 0.0 75.7?.8.88 20.741.892.21 0.0 6.7 77.1 j

19 Unit Senice Fae:or 0.0 6.7 77.1

20. Unit Availability Factor 0.0 6.6 70.2 f
21. Unit Capacity Factor (Using 3tDC Net) 0.0 6.6 70.2
22. Unit Capacity Factor (Using DER Net) 100.0 91.6 5.0
23. Urit Forced Outage Rate j
24. Shutdowns Scheduled Over Nest 6 Stonths (Type.Date.and Duration of Eacht:

November 1. 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INIT! A L CRIT!CALITY 4

INITIAL ELECTRICITY CO3151ERCIAL CPER AT:CN i

l ic/77) 1

,i :

AVERACE DAILY UNIT POWER LEVEL DCCKET NO. 50-29 UNIT Y,nkee Rwe i

DATE 301010 CO31PLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 i

510NTli September, 1980 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We NetI (SIWE Net 1 1

0.0 37 0.~0 l

2 iS 3

19 4

20 5

21 l

6 22 k

7 23 3

'4 9

25 10 26 II 27 12 2S 13 29 14 30 t/

15 31 16 3/

INSTRUCT 0NS On this format, list the average daily unit power level in S!We Net fer each day in the reporting month.Gompute to the nearest whole megawatt.

I i

19[I7)

UNITSilU1 DOWNS ANDl'0WER REDUCTIONS DOCKET NO.

50-29 UNIT NAME _ Yankee Rowe DA1E 801010 COT frLETED itY F.

C.

Beers REl'OllT MONTil September. 1980 TELLPflONE 617-366-9011 X2215 E;

' l-5 Eb 5

g Iunsee E..

57.

Cause & roerectid Nie.

Date E.

3j 5 a

3 g 'a I.* * " '

f,3 S3 Action in 3-U S3' o2 4

cc a si c Repost #

mo e: u l'tc*cni Itecursente g

O o

1 1/19/80 F

720 A

1 N/A N/A N/A The plant is still shut dowri for 3

turbine rotor investigation and 4~g repair.

5&'"

C3

[9_8 Q1 b

h

' Emme

@b I

~

3 4

3 l': For t eil gge, son.

S: S(licif utest 3.g,p,i,' ment Faihne (Explain)

Ihlishit G. Instrutiions t ' 3'""'g I"' PicParation nl Data Il Mainteiunce of Test 2 'M ' ""'I S'"-

Entay Sliccis Ine 1.iu,iu-e C Itclueliiir

"' " " "' C N C ' '"" -

Event Iterini (Ll'Iti l'ile INultt:G-D-Ites;ula:Ery Itcsirictiuri IU*PI "I 0161) li Opre.itor liaining & License Examination F Aihnini.ieative b

6 U Ct.eiion.il l eens (linpl.niti) l'.stnini ! - Same Sousa P

I,Y #7)

It Ushes flix;.l. sin)

--nn D

DOCKET No.

50-29 UNIT Yankee Rowe DATE 901010 COMPLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 REPORT MONTH SEPTEMBER 1980 SU.'ItARY OF CPERATING EXPERIENCES 9/1 The plant remained shut down for the entire month, in Mode 5.

due to turbine disc failure.

4

=

l f

l