ML19347B550
| ML19347B550 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/08/1980 |
| From: | Ballentine J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19347B551 | List: |
| References | |
| NUDOCS 8010150326 | |
| Download: ML19347B550 (1) | |
Text
i 59 Lin7 Sequoyah Nuclear Plant P. O. Box 2000 Daisy, Tennessee 37319 N?
$@Q Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Enclosed is the September, 1980 Monthly Operating Report for Sequoyah Nuclear Plant Unit 1.
Very truly m urs, IENNESSEE VAJ. EY AUTHORITY
\\
D.aLV-(2 d._ktUd J. M. Ball ntine Plant Manager JAMcP:CN Enclosure cc: Director, Region II Director, Office of Management Nuclear Regulatory Commission Information and Program Control Office of Inspection and Enforcement Nuclear Regulatory Commission i
101 Marietta Street Washington, DC 20555 (2 copies)
Suite 3100 Atlanta, GA 30303 (1 copy) l Director, Office of Inspection l
and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)
Mr. A. Rubio, Director Mr. Bill Lavallee, NSAC Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
Mr. John Gallik i
Westinghouse Electric Corp.
i Nuclear Service Division P. O. Box 2728 R & D Building 701 Pittsburg, PA 15230 (1 copy) 9\\
\\
8 01 o yg, 326
,