Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344D187 + (ML19344D187)
- ML19344D188 + (ML19344D188)
- ML19344D190 + (ML19344D190)
- ML19344D191 + (ML19344D191)
- ML19344D192 + (ML19344D192)
- ML19344D193 + (ML19344D193)
- ML19344D195 + (ML19344D195)
- ML19344D196 + (ML19344D196)
- ML19344D197 + (ML19344D197)
- ML19344D198 + (ML19344D198)
- ML19344D199 + (ML19344D199)
- ML19344D201 + (ML19344D201)
- ML19344D203 + (ML19344D203)
- 05000325/LER-1980-023, Forwards LER 80-023/03L-0 + (ML19344D204)
- ML19344D205 + (ML19344D205)
- 05000325/LER-1980-023-03, /03L-0:on 800208,during Normal Plant Operation, Reactor Vessel Conductivity Exceeded 2 Umho/Cm for 25.6-h. Caused by Inability of Reactor Water Cleanup Sys to Operate at Full Capacity,Due to Heat Exchanger Leakage + (ML19344D206)
- ML19344D207 + (ML19344D207)
- ML19344D208 + (ML19344D208)
- ML19344D209 + (ML19344D209)
- ULNRC-06554, Follow-Up Action for Response to NRC Bulletin 2012-01: Extension of Implementation Period for Activating Open Phase Isolation System Installed at Callaway Plant + (ML19344D210)
- ML19344D211 + (ML19344D211)
- ML19344D212 + (ML19344D212)
- ML19344D213 + (ML19344D213)
- ML19344D214 + (ML19344D214)
- ML19344D215 + (ML19344D215)
- ML19344D216 + (ML19344D216)
- ML19344D217 + (ML19344D217)
- ML19344D218 + (ML19344D218)
- ML19344D219 + (ML19344D219)
- ML19344D220 + (ML19344D220)
- ML19344D222 + (ML19344D222)
- ML19344D223 + (ML19344D223)
- ML19344D224 + (ML19344D224)
- 05000346/LER-1979-130-01, Revised 79-130/01T-1:on 791227,clearance Between RCS Hot Leg & Four Large Shims of Pipe Whip Restraints R-4 Determined to Be Insufficient.Caused by Design Error.Pipe Whip Restraints R1 & R4 Modified & R3 Shim Removed + (ML19344D225)
- ML19344D226 + (ML19344D226)
- ML19344D227 + (ML19344D227)
- ML19344D229 + (ML19344D229)
- ML19344D230 + (ML19344D230)
- ML19344D232 + (ML19344D232)
- ML19344D234 + (ML19344D234)
- ML19344D235 + (ML19344D235)
- ML19344D236 + (ML19344D236)
- ML19344D237 + (ML19344D237)
- 05000344/LER-1980-001, Forwards LER 80-001/03L-0 + (ML19344D238)
- ML19344D241 + (ML19344D241)
- 05000344/LER-1980-001-03, /03L-0:on 800204,during Surveillance Testing, B Train DBA Sequencer Failed to Start Two Loads.Caused by Binding Collar.Collar Adjusted & Procedures Revised to Require Manual Check & Reset of Sequencers After Operation + (ML19344D242)
- ML19344D244 + (ML19344D244)
- ML19344D247 + (ML19344D247)
- ML19344D249 + (ML19344D249)
- ML19344D250 + (ML19344D250)
- ML19344D251 + (ML19344D251)