ML19344D235

From kanterella
Jump to navigation Jump to search
Forwards, Semiannual Radioactive Effluent Release Rept, Jul-Dec 1979
ML19344D235
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/27/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344D236 List:
References
NUDOCS 8003110574
Download: ML19344D235 (1)


Text

  1. '

4 Alabama Power Company 0 '

600 North 18th Street Post Offica Box 2641 Drmingham. Alabama 35?91 Telephone 205 32153*1 m

F. L. CLAYTON. JR.

%3ggy3 gg Senior Vice President tre sourtwn e ectoc system r

February 27,-1980 Joseph M. Farley Nuclear Plant Radioactive Effluent Release Report Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

The Joseph M.' Farley Nuclear Plant semi-annual radioactive effluent release report for the second half of 1979 is herewith submitted in accordance with ETS Section 5.6.1.b.

Due to a computer program problem the Batch Release Mode Meteorologi-cal Data portion of Table 4A is not included with this submittal. This is not an operational problem which affects the effluent release or dose com-putations included in this report. The computer problem is expected to be resolved in a few days and the missing data are expected to be submitted on or before March 15, 1980.

Yours very truly, h$

F. L. Clayton(I Jr.

FLCJr/WMJ:bhj Attachment cc: Director (w/ Attachment)'

Office of Nuclear Reactor Regulation Director (w/ Attachment)

Office of Inspection & Enforcement Mr. R. A. Thomas w/ Attachment I7 Mr. C. F. Trowbridge w/o Attachment i

R D O S 110 $9 t-j'

_