ML19344D235

From kanterella
Jump to navigation Jump to search
Forwards, Semiannual Radioactive Effluent Release Rept, Jul-Dec 1979.
ML19344D235
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/27/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344D236 List:
References
NUDOCS 8003110574
Download: ML19344D235 (1)


Text

  1. '

4

.. Alabama Power Company l 0 ' 600 North 18th Street

  • Post Offica Box 2641 Drmingham. Alabama 35?91 Telephone 205 32153*1 m

F. L. CLAYTON. JR.

Senior Vice President

%3ggy3 gg tre sourtwn e ectoc r system February 27,-1980 Joseph M. Farley Nuclear Plant Radioactive Effluent Release Report -

I Mr. James P. O'Reilly l U. S. Nuclear Regulatory Commission i 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

The Joseph M.' Farley Nuclear Plant semi-annual radioactive effluent release report for the second half of 1979 is herewith submitted in accordance with ETS Section 5.6.1.b.

Due to a computer program problem the Batch Release Mode Meteorologi-cal Data portion of Table 4A is not included with this submittal. This is not an operational problem which affects the effluent release or dose com-putations included in this report. The computer problem is expected to be resolved in a few days and the missing data are expected to be submitted on or before March 15, 1980.

Yours very truly, h$

F. L. Clayton(I Jr.

FLCJr/WMJ:bhj Attachment cc: Director (w/ Attachment)'

Office of Nuclear Reactor Regulation Director (w/ Attachment)

Office of Inspection & Enforcement Mr. R. A. Thomas w/ Attachment I7 Mr. C. F. Trowbridge w/o Attachment i R D O S 110 $9 t-j'

_ _