ML19344D251

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Reactor Coolant Drain Line Not Installed Per Drawings
Date released: 12/24/2019 Download: ML19344D251


Final Deficiency Rept:Drain Line Connected to Reactor Coolant Crossover Leg Piping in Loop Four Not Installed Per Design Drawings.Reanalysis of Orientation & Dimensions of Reactor Coolant Drain Line Changed Nozzle & Support Loads
ML19344D252
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/03/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19344D252 (1)
Forwards Final Deficiency Rept Re Reactor Coolant Drain Line Not Installed Per Drawings
ML19344D250
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/03/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344D250 (1)