ML19344D197

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1980
ML19344D197
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/06/1980
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19344D196 List:
References
NUDOCS 8003110511
Download: ML19344D197 (12)


Text

. .

~

e l l

l OPERATING DATA REPORT DOCKET NO. 50-333 DATE March 1980 COMPLETED BY E. Zufelt TELEPHONE (315)342-3840 OPERATING STATUS

1. Unit Name: Fit: Patrick Notes
2. Reporting Period: 800201 - 800229  ;
3. Licensed Thermal Power (MWt):

2436 j

4. Nameplate Rating (Gross MWe): 883 i
5. Design E!ectrical Rating (Net MWe): 821 l
6. Maximum Dependable Capacity (Gross MWe). 830 1
7. Maximum Dependable Capacity (Net MWe): 800
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None _

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,If Any:

This Month Yr..t o.Da te Cumulative

11. Hours In Reporting Period 696 1440 40273
12. Number Of Hours Reactor Was Critical 604.5 1348.5 27978.7
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On.Line 564.5 1308.5 27046.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Tnermal Energy Generated (MWH) 1008312 2682552 53870746
17. Gross Electrical Energy Generated (MWH) 345030 922920 18276620
18. Net Electrical Energy Generated (MWH) 333465 893400 17683975
19. Unit Service Factor 81.1% 90.9% 67.2%
20. Unit Availability Factor 81.1% 90.9% 67.2%
21. Unit Capacity Factor (Using MDC Net) 59.9% 77.6% 60.4%
22. Unit Capacity Factor (Using DER Net) 58.4% 75.6% 53.5%
23. Unit Forced Outage Rate 18.9% 9.1% 20.5%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Snubber inspection and refueling outage scheduled for April 1980.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved NITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 3o o3 n o 67 /

. e AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NO. 50-333 UNIT JAFNPP DATE March 1980 CO.\ lPLETED,8y E. Zufelt TELEPHONE (315)342-3840 MONTH February 1980

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) . (5tWe-Net)

, 764 g7 606 502 gg 694 2

644 39 713 3

4 738 20 705 7I ' 23 315 5

0 22 203 6

0 23 556 i 7

63 5f, '

8 24 423 25 611 9

10 648 26 706

,3 g 266 27 720 68 23 74 0 12 13 409 29 750 14 512 30 485 3, 15 16 412

SUMMARY

Unit operated at approximately 60t, power during this reporting period. A minor power' reduction was made for a rod pattern change and the unit was off line for 131 hours0.00152 days <br />0.0364 hours <br />2.166005e-4 weeks <br />4.98455e-5 months <br /> due to repair of .20-MOV-82 and two j reactor scrams.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. S0-333 UNIT NAME JAFNPP DATE March 1980 REPORT MONT11 February 1980 COMPLETED BY li . Zufelt TELEPilONE (315)342-3840

e. s

, jE 3 Y Licensee E r, Cause & Corrective

%. Date i 5? i .a 2 5 Event

(? gU3 Action to

$= $ j if, g Report a mu g Prevent Recurrence 6 -

2 800202 S 0 11 4 N/A N/A N/A Power reduced for rod pattern change 3 80020S F 80.8 A 1 80-016 SD VALV0P Moisture leakage into operator caused motor and control circuit failure. Repaired moisture leak, provided a drainage path and replaced motor.

4 800211 F 30.6 G 3 N/A N/A N/A Operator pulled fuses on undervoltage device for 10300 bus 5 800221 F 20.1 G 3 N/A N/A N/A During calibration of main steam hi-radiation monitors a vendor employee accidentally bumped a level switch on CRD scram discharge volume.

I 2 3 4 F: Funed Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) I Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheels for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Other (Explain) 01611 E Operator Training & License Examination F-Administ rative 5 G-Operatennal Error (Explain) Exhibit 1 - Same Source Il Other (Explain)

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE FEBRUARY 1980 Unit operated at approximately 60% power for this reporting period. Power was reduced on February 2, for a rod pattern change. Unit was off line for a period of 81 hours9.375e-4 days <br />0.0225 hours <br />1.339286e-4 weeks <br />3.08205e-5 months <br /> from February 5 to February 8 to repair 20-MOV-82.

Two reactor scrams occurred; one on February 11 when an operator pulled fuses on the undervoltage device for 10300 bus, and on February 21 during calibration of Main i Steam Hi-Radiation monitors when a contractor employee ,

accidentally bumped a level switch on the CRD scram discharge '

volume.

l I

l m

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary IGC - February 1980 Date Wo k Request # Cause of Results of Action taken to System llow Detected Repair Coroonent 8 4falfunction Malfunction Preclude Time Recurrence (flours) 13-4323 OR No.80-036 Replaced 2/8/80 13 RCIC-Tach ISC Unknown No voltage resistor 10.0 14-6494 Tech Spec Changed procedure 2/4/80 14 14-DPIS-43A, B 16C Change N/A Setpoint change Recalibrated 4.0 17-6290 Faulty Spurious Replaced 2/27/80 17 17 -RIS-458 B OPS detector readings detector 28.0 -

23-4399 Loose shield Spurious Tightened 2/15/80 23 IIPCI Isol Logic OPS at thermocouple llPCI isolation shield 20.0 27-4356 Leak - checked piping - found 2/20/80 27 27-02 A: A/B OPS None None o.k. 4.0 68-4343 Loose Erratic Tightened 2/12/80 68 68-TI-100 OPS connection indication conn. 2.0 00-4324 Normal N2 2/10/80 00 Elect. Penetrations OPS leakage Failed ST-39G Repressurized 8.0 00-4325 Normal N-2/10/80 00 Elect. Penetrations OPS leakage N/A Repressurized 12.0

JAMES A. FITZPATRICK NUCLEAR POWER PLANT 4

Maintenance Summary IGC - February 1980 Date System ork Request #

llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours)

"B" Side RPS trip 05-6496 without computer

_2_/21/80 05 RPS B1/B2 Relays 16C None printout None required 8.0 07-6497 '

2/4/80 07 LPRMS 16C Age N/A IMP-7.22 32.0 07-4396 2/20/80 07 Flow Unit C OPS Low Flow Alarm N/A 3.0 07-6253 Approx. 10'.

increase in 2/20/80 07 APRM F OPS Unknown indicated Icvel IMP-7.6 3.0 07-6255 Checked setting 2/21/80 07 APRM F OPS None None of LPRM count 12.0 07-4258 Gear drive out 2/11/80 07 R-45 OPS of alignment Does not track Aligned gears 6.0 07-4335 2/8/80 07 IRM B ISC Use Loose connection Repaired 4.0 07-4344 IMP-7.6/7.22 2/12/80 07 LPRM 12-21C OPS Age Readings high No I/V Curve 8.0 07-4345 IMP-7.6/7.22 2/12/80 07 LPRM 44-21D OPS Age Readings high No I/V Curve 8.0 07-4681 Replaced connect-2/6/80 07 SRM C OPS Age /Use Failed high ors 6 Detector 61.0 07-4668 Replaced 2/6/80 07 SRM A OPS Moisuture Rea' ding liigh connector 72.0

.I

POWER AITT110RITY OF TIIE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary i

WORK REQUEST g REPAIR DATE SYSTEM ll0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

Il0URS 2023 NRC Bulletin 79-02 Repaired 1110-33 71 29 Jan 10 Visual 1110-33 Inspection 30 Jan 10 2032 Visual Stress Analysis Modified 1110-601 516 3/4 1110-601 Visual NRC Bulletin 79-02 Repaired 1115-1 65 31 Jan 15 3785 111 5 - 1 Inspection 3805 Visual Stress Analysis Repaired 1110-213 96 -

31 Jan 10 1110-213 2037 Visual NRC Bulletin 79-02 Modified 1114 -10 359 5 Feb 14 1114-10 Inspection 5 Feb 66 2879 Visual Stress Analysis Modifies E66-12 237 1166-12 Stress Analysis Modified 1115-89 22 5 Feb 15 5038 Visual 1115-89 6 Feb 20 4244 OPS bbisture caused motor and Fixed equipment leak. Reoriented 108 MOV-82 control circuit failure operator. Provided drainage path.

Replaced motor.

6 Feb 23 4849 N/A None Reoriented valve operator to minimize 4 MOV-15 condensate Icakage into operator 6 Feb 12 4950 N/A None Reoriented valve operator to minimize 4 MCV-15 condensate leakage into operator

f POWER AUT110RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Mechanical Maintenance Summary WORK REQUEST , REPAIR DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

Il00RS 5 Feb 10 3796 Visual NRC Bulletin 79-02 Repaired 1110-614 205 1110-614 Inspection 6 Feb 10 3741 Visual NRC Bulletin 79-02 Repaired 1110-473 101 1110-473 Inspection 8 Feb 10 5027 Visual NRC Bulletin 79-02 bbdified 1110-57 171 1110-57 Inspection 20 Feb 27 4398 OPS Inspection None 1 FE-102 14 Feb 10 2810 Visual NRC Bulletin 79-02 Repaired 1110-6 93 111 0 - 6 Inspection 14 Feb 13 3744 Visual NRC Bulletin 79-02 Repaired 1113-36 G 37 44h 1113-36 6 37 Inspection 14 Feb 70 3813 Visual NRC Bulletin 79-02 Repaired BFSK-418 24 BFSK-418 Inspection 14 Feb 70 3827 Visual NRC Bulletin 79-02 Repaired BFSK-407 24 BFSK-4 07 Inspection 13 Feb- 66 3829 Visual NRC Bulletin 79-02 Repaired 1166-33 29 1166-33 Inspection 13 Feb 15 5025 Visual NRC Bulletin 79-02 Repaired 1115-89 60k 1115-89 Inspection

POWER Alml0RITY OF TIIE STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Hechanical Maintenance Summary WORK REQUEST 3 REPAIR DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 6 Feb 03 3891 Visual Valve 111 has packing leak Replaced Valve 111- 3 IICU-26-31 6 Feb 03 4651 Visual Valve 111 has packing Icak Replaced Valve 111 3 IICU-76-35 6 Feb 13 4318 Visual Packing leak Repacked valve 10 RCIC-752 7 Feb 13 4600 Visual Body to bonnet leak Replaced pressure seal 10 MOV-16 7 Feb 13 4748 Visual Packing leak Repacked valve 4 MOV-16 1 Feb 27 4238 Audible Air fitting leaking Replaced fitting 1 A0V-113 6 Feb 29 4316 Visual Packing leaks Repacked valves 30 MST-717A - D 6 119 13 Feb 10 3767 Visual NRC Bulletin 79-02 Repaired PFSK-1056 38 PFSK-1056 Inspection 13 Feb 10 3765 Visual NRC Bulletin 79-02 Repaired !!10-518 101 1110-518 Inspection 11 Feb 15 5050 Visual NRC Bulletin 79-02 Modified 1115-93 72 1115-93 Inspection

POWER Alml0RITY OF TIIE STATE'0F NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER Pl. ANT Safety Related Electrical 6 Mechanical Maintenance Summary REPAIR DATE WORK REQUEST #

SYSTW COMPONENT # 110W DETECTED CAUSE CF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME.

HOURS 12 Feb 11 2848 Visual NRC Bulletin _79-02 Repaired 1111-2 16 111 1 - 2 Inspection 11 Feb 10 3731 Visual NRC Bulletin 79-02 Repaired 1110-121 147

!!10-121 Inspection 12 Feb 46 2864 Visual NRC Bulletin 79-02 Repaired 1146-126 82 3/4 1146-126 Inspection 12 Feb 11 2883 Visual NRC Bulletin 79-02 Repaired 1111-4 64 111 1 - 4 Inspection 12 Feb 1) 2871 Visual NRC Bulletin 79-02 Repaired 1111-3 48k 111 1 - 3 Inspection 12 Feb 66 5049 Visual QCAR-80-002 Repaired concrete 14 BFSK-378A 11 Feb 10 5048 Visual NRC Lalletin 79-02 Repaired 1110-212 47 1110-212 Inspection 11 Feb 66 5045 Visual NRC Bulletin 79-02 Repaired BFSK-324 88 BFSK-324 Inspection 13 Feb 10 3844 Visual NRC Bulletin 79-02 Repaired Constraint C 46 Constraint C Inspection 13 Feb 10 3763 Visual NRC Bulletin 79-02 Repaired 1110-164 124 1110-164 Inspection .

. _ _' _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ O _ w

POWER Alffl10RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 4 Mechanical Maintenance Summary WORK REQUEST g REPAIR DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS 13 Feb 66 5047 Visual NRC Bulletin 79-02 Repaired BFSK-341-2 63 BFSK-341-2 Inspection 14 Feb 66 5054 Visual NRC Bulletin 79-02 Repaired BFSK-341-3 24 BFSK-341-3 Inspection 21 Feb 71 4212 ST Low voltage sensing circuit Adjusted setpoint so that annunciator 8 BC-1 setpoint too low activates if battery terminal voltage decreases below float voltage (130 VDC) 20 Feb 10 3,739 Visual NRC Bulletin 79-02 Repaired 1110-255 18 1110-255 Inspection 20 Feb 70 3806 Visual NRC Bulletin 79-02 Repaired BFSK-562 66 BFSK-562 Inspection 20 Feb 70 3812 Visual NRC Bulletin 79-02 Repaired BFSK-566 76 BFSK-566 Inspection 20 Feb 70 3837 Visual NRC Bulletin 79-02 Repaired BFSK-366 26 BFSK-366 Inspection t .

POWER AUT110RITY OF TIIE STATE OF NEW YORK ~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQUEST # REPAIR DATE SYSTEM liOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONEN1' #

il0URS IS Feb 10 2865 Visual NRC Bulletin 79-02 Repaired 1110-247 38 1110-247 Inspection 15 Feb 46 2867 Visual NRC Bulletin 79-02 Repaired 1146-135 52h 1146-135 Inspection 13 Feb 10 3751 Visual NRC Bulletin 79-02 Repaired 1110-263 76 1110-263 Inspection 14 Feb 10 3755 Visual NRC Bulletin 79-02 Repaired 1110-67 73 1110-67 Inspection 14 Feb 10 3758 Visual NRC Bulletin 79-02 Repaired 1110-84 92h 1110-84 Inspection 11 Feb 10 3808 Visual NRC Bulletin 79-02 Repaired 1110-117 67h 1110-117 Inspection 19 Feb 10 2881 Visual NRC Bulletin 79-02 Repaired 1110-126 145 ll10-126 Inspection 19 Feb 46 3732 Visual NRC Bulletin 79-02 Repaired 1146-11 149 1146-11 Inspection 19 Fe'b 66 3771 Visual NRC Bulletin 79-02 Repaired 1166-34 211 3/4 1166-34 Inspection 20 Feb 10 3840 Visual NRC Bulletin 79-02 Repaired 1110-166 92 1110-166 Inspection 15 Feb 10 5019 Visual NRC Bulletin 79-02 Repaired 1110-543 26 1110-543 Inspection l

- _ _ _ _ _ _ _ _ _ . _ _ - - - _ - - _ . _ _ _ _ _