ML19344D208

From kanterella
Jump to navigation Jump to search
Forwards Tech Spec Change Request 81 Incorporating New Max Average Planar Linear Heat Generation Rate Curve to Sections 2.1.A.1,3.10 & 4.10 of App A.Class III Fee Encl
ML19344D208
Person / Time
Site: Oyster Creek
Issue date: 03/04/1980
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19344D209 List:
References
TASK-16, TASK-RR NUDOCS 8003110539
Download: ML19344D208 (2)


Text

.

.T s

a Jersey Central Power & Light Company p=25=ew w (J" g )

Madison Avenue at Punch Bowl Road K

p ' ) */

,4 V.f

.-. um Momstown, New Jersey 07960 8-,4m.

(201)455-8200 bbrch 4, 1980 Director 1:uclecr Reactor Regulction United States ::acle r Regulctory Commist. ion L snington, DC 20555 Decr Sir:

Subicct:

Cristcr Creek Nucle:r Concrcting Etation Docket Go. 50-219 Rcquest for Amencment to Provisional Cpcrzting Lience 50. EPE-lG Tcennic;l Specific tion Cnange hoc,uest No. 81 Pursusnt'to Titic 10, Code of Federal Regulations, Section 50.59, tnrec signed originals znd fif ty-seven conformed copies of Jersey Ctntral Power &

Lignt Company's request for caendment to Appendix 7. of Provisioncl Opersting Licanse No. DPR-16 for the Oyster Creek Nuclect Generating Station, incorporating Technical Specificction Change hoquest No. S1, are submitted.

This Technical Sp;cification Cacnge F4.cuest includes two scts of FAPLEGR limits; one for five recirculction loop operation (Figure 3.10-1), anJ another for four recirculation loop operation (Figure 3.10-2). :D.PL!:GR limits in Figure 3.10-1 are identical to those specified by the A cndment No. 33, dcted November 11, 1978, with the exception that limits of fuel types V and V3 have been e:: tended to 40 GND/IE. MAPLHGR limits in Figure 3.10-2 are results of new cnclyses with only four recirculation loops operational for fuel types V cnd VB cnd the limits of fuel type IIIF cro tnose in the current technical j

specifications.

This request also returns the FAPLHGR multiplier to the specifications and it is made applicable to all fuel types for five and four loop operction.

References to fuel types II cnd IIIE for fuel cladding integrity, local LEGR, and power spike penalty have also been deleted from the specification. These reload fuel bundles are no longer in the core and are not scheduled for reinsertion.

Technical Specification Change Request No. 8_1 is included in Attachment I.

An Exxon Nuclear Company report, XN-NF-79-78, LOCA-ECCS Analyses Supporting Four-Pump Operation of Cyster Creek Recctor, dated January, 1980, is also attcened to tnis letter as a reference document.

/

1 soos11o S3 p do Jersey Central Power & Light Company!: a Member of the General Pubhc Utihties System

)

L

1 4

Tnis 7cchr.icc1 specificction Chcngc Recuent IJc. El has bcon revic.ed tid

- :pproved by tr.e Station F.cnager, tt.e Plcnt Cperations Review Cormittcc, snd tr.e Inflependent Safcty Review Groups in cccordance with Section 6.5 of the Oyster Crock technical Specifications.

is h ve deter:ained that this cubT.ittal is C1csc III in accordance sith 10CFB170.22 crd have enclosc<i c check for $4,000 pursuant to that section.

Very truly yours, N

IV:n I:. Fini k,

r.

Vic:. Prcsid t la Enclocure:

9

'l J