Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341C679 + (ML19341C679)
- ML19341C680 + (ML19341C680)
- ML19341C682 + (ML19341C682)
- ML19341C683 + (ML19341C683)
- ML19341C684 + (ML19341C684)
- ML19341C685 + (ML19341C685)
- PNO-III-80-238, on 801229,gaseous Release of 0.1 Ci Occurred When Makeup Tank Vented Through Instrument Line.Venting Occurred During Improperly Authorized Maint Work.Bldg Ventilation Secured & Bldg Evacuated + (ML19341C686)
- PNO-III-80-235, on 801227,unit Shutdown Initiated Resulting in Outage of Greater than Two Days.Caused by Maint on Main Condenser Tube Leaks.Repairs to Be Completed & Unit Returned to Svc by 801231 + (ML19341C687)
- PNO-III-80-231, on 801207,3 Ci Technetium Generator Reported Missing.Generator Properly Packaged & Labeled.As of 801215, Generator Would Contain 240 Mci Activity.No Hazard Exists Unless Generator Disassembled + (ML19341C690)
- PNO-III-80-208, on 801106,main Generator Output Breakers Tripped,Resulting in Plant Shutdown Over Two Days.Cause Not Determined.Unit Will Be Maintained in Hot Standby Until 801110,pending Determination of Cause + (ML19341C691)
- ML19341C692 + (ML19341C692)
- ML19341C693 + (ML19341C693)
- ML19341C694 + (ML19341C694)
- ML19341C695 + (ML19341C695)
- ML19341C697 + (ML19341C697)
- ML19341C698 + (ML19341C698)
- ML19341C699 + (ML19341C699)
- PNO-III-80-208A, on 801107,Unit 2 Commenced Cooldown to Cold Shutdown Resulting in Plant Shutdown Over Two Days.Caused by Maint on Pressurizer Spray Lines Due to 801106 Trip.Outage to Last at Least Three Days + (ML19341C700)
- ML19341C701 + (ML19341C701)
- ML19341C702 + (ML19341C702)
- ML19341C703 + (ML19341C703)
- ML19341C704 + (ML19341C704)
- IR 05000267/1980023 + (ML19341C706)
- ML19341C707 + (ML19341C707)
- ML19341C709 + (ML19341C709)
- ML19341C711 + (ML19341C711)
- ML19341C712 + (ML19341C712)
- ML19341C713 + (ML19341C713)
- ML19341C714 + (ML19341C714)
- ML19341C716 + (ML19341C716)
- ML19341C717 + (ML19341C717)
- ML19341C718 + (ML19341C718)
- ML19341C719 + (ML19341C719)
- PNO-III-81-011, water Found in 12 Containment Electrical Penetrations in East Penetration Room.Source of Water Undetermined + (ML19341C721)
- ML19341C722 + (ML19341C722)
- ML19341C723 + (ML19341C723)
- ML19341C724 + (ML19341C724)
- ML19341C725 + (ML19341C725)
- ML19341C726 + (ML19341C726)
- ML19341C727 + (ML19341C727)
- PNO-III-81-010, on 810116,stop Work Order Re Installation of Core Support Assembly Vent Valves Issued to B&W After Discrepancies Noted.Included Failure to Maintain Adequate Inventory Control & to Identify Valve Parts + (ML19341C729)
- ML19341C730 + (ML19341C730)
- ML19341C731 + (ML19341C731)
- ML19341C732 + (ML19341C732)
- PNO-III-80-233, electrical Connector Problems Resulted in Plant Shutdown Over Two Days.Caused by Lack of Adequate Matl &/Or Test Data to Determine Acceptability of Connectors.Program Identified to Rework Connectors + (ML19341C733)
- IR 05000312/1980035 + (ML19341C734)
- ML19341C735 + (ML19341C735)
- ML19341C737 + (ML19341C737)
- ML19341C739 + (ML19341C739)
- IR 05000413/1980036 + (ML19341C740)
- ML19341C741 + (ML19341C741)