Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19332B256 + (ML19332B256)
- ML19332B257 + (ML19332B257)
- ML19332B258 + (ML19332B258)
- ML19332B259 + (ML19332B259)
- ML19332B260 + (ML19332B260)
- ML19332B261 + (ML19332B261)
- ML19332B262 + (ML19332B262)
- ML19332B266 + (ML19332B266)
- ML19332B267 + (ML19332B267)
- ML19332B269 + (ML19332B269)
- ML19332B271 + (ML19332B271)
- ML19332B272 + (ML19332B272)
- IR 05000010/1980013 + (ML19332B273)
- ML19332B274 + (ML19332B274)
- ML19332B276 + (ML19332B276)
- ML19332B278 + (ML19332B278)
- IR 05000329/1980013 + (ML19332B279)
- ML19332B280 + (ML19332B280)
- ML19332B281 + (ML19332B281)
- ML19332B283 + (ML19332B283)
- IR 05000409/1980004 + (ML19332B284)
- ML19332B288 + (ML19332B288)
- 05000219/LER-1980-037, Forwards LER 80-037/03L-0 + (ML19332B289)
- ML19332B290 + (ML19332B290)
- ML19332B291 + (ML19332B291)
- ML19332B292 + (ML19332B292)
- 05000219/LER-1980-037-03, /03L-0:on 800819 During Standby Gas Treatment Sys SGTS Surveillance Testing,Sgts 2 Tripped.Caused by Misaligned Welding Lead Run Across Tubing Below Duct.Welding Lead Realigned & Functionally Tested + (ML19332B293)
- ML19332B294 + (ML19332B294)
- ML19332B295 + (ML19332B295)
- ML19332B296 + (ML19332B296)
- ML19332B297 + (ML19332B297)
- ML19332B298 + (ML19332B298)
- ML19332B299 + (ML19332B299)
- ML19332B300 + (ML19332B300)
- ML19332B301 + (ML19332B301)
- 05000293/LER-1980-050, Forwards LER 80-050/01T-0 + (ML19332B302)
- ML19332B303 + (ML19332B303)
- 05000312/LER-1980-040, Forwards LER 80-040/03L-0 + (ML19332B304)
- AECM-80-210, Interim Deficiency Rept Re Failure of GE Subcontractor I&Se to Establish & Implement Approved QA Program for Electrical Work Performed Under GE Field Deviation Requests & Instructions.Results of GE Reinspection Expected by 810131 + (ML19332B306)
- 05000293/LER-1980-050-01, /01T-0:on 800911,during Mgt Review,Concluded That Operation & Maint on Containment Cooling Sys Had Been Conducted in Less Conservative Manner than Prescribed in Tech Specs.Caused by Sparse & Ambiguous Tech Specs + (ML19332B307)
- 05000312/LER-1980-040-03, /03L-0:on 800812,reactor Protection Sys Channel D Trip Signal Was Received.Caused by Amplifier Failure in Electronic Portion of Transmitter.Transmitter Replaced, Calibr,Leak Tested & Returned to Svc + (ML19332B308)
- ML19332B309 + (ML19332B309)
- 05000293/LER-1980-032, Forwards LER 80-032/01T-0 + (ML19332B311)
- ML19332B312 + (ML19332B312)
- ML19332B315 + (ML19332B315)
- 05000293/LER-1980-032-01, /01T:on 800724,GE SIL 299 Review Revealed Higher Drywell Ambient Temp than Used for Original Safeguard Yarway Calibrs.Caused by High Temp Due to Inadequate Drywell Cooling.Recalibr & Survey of Drywell Ventilation Conducted + (ML19332B317)
- ML19332B318 + (ML19332B318)
- ML19332B319 + (ML19332B319)
- ML19332B320 + (ML19332B320)
- 05000309/LER-1980-018, Forwards LER 80-018/03L-0 + (ML19332B321)
- ML19332B324 + (ML19332B324)