Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19308B488 + (ML19308B488)
- ML19308B490 + (ML19308B490)
- ML19308B491 + (ML19308B491)
- IR 05000289/1979016 + (ML19308B492)
- ML19308B494 + (ML19308B494)
- ML19308B495 + (ML19308B495)
- ML19308B497 + (ML19308B497)
- ML19308B498 + (ML19308B498)
- ML19308B499 + (ML19308B499)
- ML19308B500 + (ML19308B500)
- ML19308B501 + (ML19308B501)
- ML19308B502 + (ML19308B502)
- ML19308B503 + (ML19308B503)
- IR 05000289/1979012 + (ML19308B505)
- ML19308B506 + (ML19308B506)
- ML19308B507 + (ML19308B507)
- 05000287/LER-1978-005, Forwards LER 78-005/03L-0 + (ML19308B508)
- ML19308B511 + (ML19308B511)
- 05000287/LER-1978-007, Forwards LER 78-007/03L-0 + (ML19308B514)
- ML19308B517 + (ML19308B517)
- ML19308B518 + (ML19308B518)
- ML19308B519 + (ML19308B519)
- 05000287/LER-1978-007-03, /03L-0:on 780208,suction Valve 3LPSW-123 Observed Closed During 3B Pump Startup.Valve Closure Cause Unknown. Probably Caused by Erroneous Closing During Repairs on on Pervious Day.Valve Opened & Pump Checked for Damages + (ML19308B520)
- 05000287/LER-1978-005-03, /03L-0:on 780207,valve BS-2 Failed in Intermediate Position During Operability Test.Caused by Valve Stem Failure & Partly by Faulty Torgue Switch.Stem & Switch Replaced.Stems Made by Walworth + (ML19308B521)
- ML19308B522 + (ML19308B522)
- ML19308B524 + (ML19308B524)
- 05000287/LER-1978-006, Forwards LER 78-006/03L-0 + (ML19308B525)
- ML19308B526 + (ML19308B526)
- 05000287/LER-1978-004, Forwards LER 78-004/03L-0 + (ML19308B527)
- ML19308B528 + (ML19308B528)
- ML19308B529 + (ML19308B529)
- ML19308B530 + (ML19308B530)
- 05000287/LER-1978-006-03, /03L-0:on 780210,Control Rod 3,Group 4,dropped Into Core During Breaker Test,Causing Power Runback to 55%. Caused by Stator Short Due to Excessive Moisture Entering Through Nonleakproof O-ring Seal.Stator Replaced + (ML19308B531)
- ML19308B533 + (ML19308B533)
- ML19308B535 + (ML19308B535)
- 05000287/LER-1978-008, Forwards LER 78-008/03L-0 + (ML19308B536)
- ML19308B538 + (ML19308B538)
- 05000287/LER-1978-004-03, /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified + (ML19308B539)
- ML19308B541 + (ML19308B541)
- ML19308B544 + (ML19308B544)
- 05000287/LER-1978-008-03, /03L-0:on 780305,power Range Detector Found Spiking.Reactor Protection Sys Channel a Bypassed,Preventing Spurious Trips.Cause Not Determined.Investigation to Resume Next Refueling or Next Spiking + (ML19308B545)
- ML19308B546 + (ML19308B546)
- ML19308B547 + (ML19308B547)
- 05000269/LER-1978-029, Forwards LER 78-029/03L-0 + (ML19308B548)
- ML19308B549 + (ML19308B549)
- ML19308B550 + (ML19308B550)
- ML19308B551 + (ML19308B551)
- ML19308B552 + (ML19308B552)
- ML19308B554 + (ML19308B554)
- ML19308B555 + (ML19308B555)
- ML19308B556 + (ML19308B556)