ML19308B511

From kanterella
Jump to navigation Jump to search
Forwards LER 78-005/03L-0
Date released: 11/18/2019 Download: ML19308B511


LER 78-005/03L-0:on 780207,valve BS-2 Failed in Intermediate Position During Operability Test.Caused by Valve Stem Failure & Partly by Faulty Torgue Switch.Stem & Switch Replaced.Stems Made by Walworth
ML19308B521
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/09/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308B521 (2)
Forwards LER 78-005/03L-0
ML19308B508
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/09/1978
From: Parker J
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308B508 (2)