Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19260D574 + (ML19260D574)
- ML19260D575 + (ML19260D575)
- ML19260D576 + (ML19260D576)
- ML19260D577 + (ML19260D577)
- ML19260D578 + (ML19260D578)
- 05000313/LER-1980-003, Forwards LER 80-003/01T-0 + (ML19260D579)
- ML19260D580 + (ML19260D580)
- 05000333/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19260D581)
- ML19260D582 + (ML19260D582)
- 05000333/LER-1980-009-03, /03L-0:on 800110,during Normal Operation,Diesel Fire Pump Made Inoperable to Correct Minor Boil Over of Engine Following Shutdown.Boil Over Caused by Defective Coolant Sys Cap.Cap Replaced + (ML19260D583)
- AECM-79-127, Requests Extension Until 800115 to Respond to Violation Noted in IE Insp Repts 50-416/79-15 & 50-417/79-15.Response Is Dependent Upon Interpretations of NEDO-10466-A to Be Made at Meeting W/Ge & NRC on 791116 + (ML19260D584)
- ML19260D585 + (ML19260D585)
- ML19260D586 + (ML19260D586)
- ML19260D588 + (ML19260D588)
- 05000313/LER-1980-003-01, /01T-0:on 800121,while at Cold Shutdown,Boron Buildups Identified on Loop B of Reactor Bldg Spray & Piping.Buildups Verified to Be Cracks in heat-affected Zone of Schedule 10 Pipe to Fitting Welds + (ML19260D589)
- IR 05000348/1979035 + (ML19260D590)
- ML19260D591 + (ML19260D591)
- ML19260D592 + (ML19260D592)
- ML19260D593 + (ML19260D593)
- ML19260D594 + (ML19260D594)
- 05000324/LER-1980-008, Forwards LER 80-008/03L-0 + (ML19260D595)
- ML19260D596 + (ML19260D596)
- IR 05000348/1979079 + (ML19260D597)
- ML19260D598 + (ML19260D598)
- 05000324/LER-1980-008-03, /03L-0:on 800110,while Performing Reactor Core Isolation Cooling Instrument Check,Reactor Core Isolation Cooling Trip & Throttle Valve MOV-V8 Would Not Trip.Caused by Burned Solenoid.Solenoid Repaired + (ML19260D599)
- ML19260D600 + (ML19260D600)
- ML19260D601 + (ML19260D601)
- ML19260D602 + (ML19260D602)
- ML19260D603 + (ML19260D603)
- 05000282/LER-1980-002, Forwards LER 80-002/03L-0 + (ML19260D604)
- ML19260D605 + (ML19260D605)
- ML19260D606 + (ML19260D606)
- ML19260D607 + (ML19260D607)
- IR 05000416/1979015 + (ML19260D610)
- ML19260D612 + (ML19260D612)
- ML19260D614 + (ML19260D614)
- 05000282/LER-1980-002-03, /03L-0:on 800107,during Surveillance Test of Diesel Generator D-1,relay Misoperation Occurred Which Would Have Prevented Automatic Synchronization of Generator Onto Bus 15.Caused by Stuck Relay Plunger.Plunger Freed + (ML19260D615)
- ML19260D617 + (ML19260D617)
- ML19260D618 + (ML19260D618)
- ML19260D620 + (ML19260D620)
- ML19260D621 + (ML19260D621)
- ML19260D622 + (ML19260D622)
- ML19260D626 + (ML19260D626)
- ML19260D627 + (ML19260D627)
- ML19260D628 + (ML19260D628)
- 05000293/LER-1980-005-01, /01T-0:on 800131,measured Concentrations of Sr-90 in Milk Sample Was Greater than 10 Times Concentration in Control Station Sample.Caused by Local Meteorological Conditions.No Corrective Action Taken + (ML19260D629)
- ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation + (ML19260D630)
- 05000333/LER-1980-005, Forwards LER 80-005/03L-0 + (ML19260D631)
- ML19260D632 + (ML19260D632)
- ML19260D633 + (ML19260D633)
- 05000317/LER-1980-001, Forwards LER 80-001/03L-0 + (ML19260D634)