ML19260D588

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/79-15 & 50-417/79-15 on 790724-0824 & Notice of Violation
ML19260D588
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19260D572 List:
References
NUDOCS 8002110475
Download: ML19260D588 (2)


See also: IR 05000416/1979015

Text

.

s

!( ) .,.,

o

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

/*

r

REGION 11

o,, s ~

~f

101 MARIETTA ST

N.W., SUITE 3100

          • [

ATLANTA, G EoRGIA 30303

OCT 181979

In Reply Refer 'o:

RII:DKW

50-416/79-15

50-417/79-15

Mississippi Power and Light Company

ATTN:

N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

This refers to the inspection conducted by D. K. Walters of this office on

July 24 through August 24, 1979, of activities authorized by NRC Construction

Permit Nos. CPPR-118 and CPPR 119 for the Grand Gulf Nuclear Station facility,

and to the discussion of our findings held with T. E. Reaves at the conclusion

of tl e inspection.

Areas examined during the inspection and our findings are discussed in the

enc 1

_d inspection report.

Within these areas, the inspection consisted of

sele ive examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Eight new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the p m isions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Cr Je or Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full co:rpliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

I?"!

l79

8002110

A_4 } {

.

Mississippi Power and Light Company

-2-

OCT 181979

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

-/^

C. E. Murphy, Chie.

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/79-15

and 50-417/79-15

cc w/ encl:

C. K. McCoy, Plant Manager

P. O. Box 756

Port Gibson, MS 39150

3n4 1

100

..
v

,