ML19260D588
| ML19260D588 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/18/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML19260D572 | List: |
| References | |
| NUDOCS 8002110475 | |
| Download: ML19260D588 (2) | |
See also: IR 05000416/1979015
Text
.
s
!( ) .,.,
o
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
/*
r
REGION 11
o,, s ~
~f
101 MARIETTA ST
N.W., SUITE 3100
- [
ATLANTA, G EoRGIA 30303
OCT 181979
In Reply Refer 'o:
RII:DKW
50-416/79-15
50-417/79-15
Mississippi Power and Light Company
ATTN:
N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
This refers to the inspection conducted by D. K. Walters of this office on
July 24 through August 24, 1979, of activities authorized by NRC Construction
Permit Nos. CPPR-118 and CPPR 119 for the Grand Gulf Nuclear Station facility,
and to the discussion of our findings held with T. E. Reaves at the conclusion
of tl e inspection.
Areas examined during the inspection and our findings are discussed in the
enc 1
_d inspection report.
Within these areas, the inspection consisted of
sele ive examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Eight new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the p m isions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Cr Je or Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full co:rpliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
I?"!
l79
8002110
A_4 } {
.
Mississippi Power and Light Company
-2-
OCT 181979
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
-/^
C. E. Murphy, Chie.
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-416/79-15
and 50-417/79-15
cc w/ encl:
C. K. McCoy, Plant Manager
P. O. Box 756
Port Gibson, MS 39150
3n4 1
100
- ..
- v
,