Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19207C512 + (ML19207C512)
- ML19207C513 + (ML19207C513)
- ML19207C514 + (ML19207C514)
- IR 05000498/1979011 + (ML19207C516)
- ML19208A002 + (ML19208A002)
- ML19208A004 + (ML19208A004)
- ML19208A005 + (ML19208A005)
- ML19208A007 + (ML19208A007)
- ML19208A008 + (ML19208A008)
- ML19208A009 + (ML19208A009)
- ML19208A010 + (ML19208A010)
- ML19208A011 + (ML19208A011)
- ML19208A012 + (ML19208A012)
- ML19208A013 + (ML19208A013)
- ML19208A014 + (ML19208A014)
- ML19208A015 + (ML19208A015)
- ML19208A016 + (ML19208A016)
- ML19208A017 + (ML19208A017)
- ML19208A018 + (ML19208A018)
- 05000338/LER-1979-098-03, /03L-0:on 790808,review of Completed Maint Procedures Showed motor-operated Valve QS102B Was Functionally Tested But Not Timed Prior to Return to Svc. Caused by Personnel Error + (ML19208A019)
- ML19208A020 + (ML19208A020)
- ML19208A021 + (ML19208A021)
- ML19208A022 + (ML19208A022)
- 05000338/LER-1979-099-09, /09L-0:on 790809,containment hi-hi Pressure Channel II Annunciator Became Energized on 790801.Channels I,Iii & IV Remained in Operation.Caused by Failure of Heat Sensitive W-39-1-J Card Component + (ML19208A023)
- 05000325/LER-1979-059, Forwards LER 79-059/03L-0 + (ML19208A026)
- ML19208A027 + (ML19208A027)
- ML19208A028 + (ML19208A028)
- ML19208A029 + (ML19208A029)
- ML19208A030 + (ML19208A030)
- ML19208A031 + (ML19208A031)
- 05000265/LER-1979-016, Forwards LER 79-016/03L-0 + (ML19208A032)
- ML19208A033 + (ML19208A033)
- ML19208A034 + (ML19208A034)
- 05000325/LER-1979-059-03, /03L-0:on 790810,during Reactor Startup Discovered Number 7 Superimposed on Number 1 Digit for Position Indication on Rod 14-47.Caused by Problem in Drywell Prototypic Inlet Piping Probe + (ML19208A036)
- ML19208A037 + (ML19208A037)
- ML19208A038 + (ML19208A038)
- ML19208A040 + (ML19208A040)
- 05000325/LER-1979-056, Forwards LER 79-056/03L-0 + (ML19208A041)
- ML19208A042 + (ML19208A042)
- ML19208A043 + (ML19208A043)
- 05000265/LER-1979-016-03, /03L-0:on 790815,HPCI Turbine Area Temp Switch Found to Trip Above Tech Spec Limits.Caused by Setpoint Drift.Switch Replaced & Tested Satisfactorily + (ML19208A045)
- 05000304/LER-1979-044, Forwards LER 79-044/03L-0 + (ML19208A046)
- 05000304/LER-1979-041, Forwards LER 79-041/03L-0.Ltr Incorrectly Dated Oct Instead of Aug + (ML19208A048)
- 05000295/LER-1979-063, Forwards LER 79-063/03T-0 + (ML19208A050)
- 05000304/LER-1979-044-03, /03L-0:on 790803,during Normal Operation, Pressurizer Level Channel 2L-459 Was Indicating Lower than Other Channels.Caused by Transmitter Zero Shift.Transmitter Zero Adjusted & Channel Returned to Svc + (ML19208A052)
- 05000304/LER-1979-041-03, /03L-0:on 790806,nonconservative Steam Generator Level Readings Were Discovered.Bistables Were Tripped.Caused by Drift in Power Supply.Unit Replaced & Loop Returned to Normal + (ML19208A053)
- 05000304/LER-1979-042, Forwards LER 79-042/03L-0 + (ML19208A054)
- 05000295/LER-1979-063-03, /03T-0:on 790816,during Safeguard Test PT-10A, Containment Isolation Valve 1AOV-PR21B Failed to Close & Redundant Valve PR-21A,although Operable,Was Not Closed. Caused by Operator Error.Operators Given Instructions + (ML19208A056)
- 05000304/LER-1979-042-03, /03L-0:on 790805,isolation Valve Failed to Close from Control Room Switch.Caused by Sticking Valve Stem. Valve Stem Cleaned,Lubricated & Adjusted.Valve Proven Operable + (ML19208A057)
- 05000295/LER-1979-056, Forwards LER 79-056/01T-0 + (ML19208A058)
- ML19208A060 + (ML19208A060)